Major Events, Projects and Planned Roadworks
Planning ahead
As part of our service, work is undertaken to maintain and develop the trunk road network. Traffic Scotland works with major events organisers and partners to assess the impact of major events on road traffic. To help with your travels, or to find out more view future traffic updates below, or by using our interactive map on the homepage.
Upcoming Events and Future Roadworks
Roads maintained by local authorities
M74 Nethan Viaduct | Bridge Refurbishment
A726 College Milton | Rail Bridge Refurbishment
A96 Union Bridge in Keith | Repair Works
A78 Inverkip | Signalised Junction Installation
M8 & M80 | Gantry Refurbishments
Bridge Carrying A84 Over M9 | Deck Repairs
Summer Events in Scotland
A90 Forfar and Bogindollo | Road Safety Upgrade
M90 Glenhead Bridge | Bridge Upgrade
A95 Ballindalloch | Refurbishment
A9 Dalwhinnie and Calvine | Carriageway Improvements
A82 Invergloy | Overnight Resurfacing Work
A96 Inveramsay Bridge in Inverurie | Drainage Improvements
M8 Bathgate and Blackburn | Major Works
M8 Junctions 1 - 6a | Overnight Maintenance
A77 Cairnryan | Essential Drainage Improvements
A9 Findhorn Bridge | Update on Maintenance Works
A68 Earlston to Millerhill | Road Marking Improvements
A96 Inverness Airport | Drainage Improvements
M9 Junction 9-8 Southbound | Safety Barrier Installations
A9 North Kessock | Active Travel Improvements
A1 Eyemouth | Resurfacing and Bridge Works
A90 Kingsway | Footbridge Removal Works
A737 St. James Interchange | Essential Resurfacing Work
A90 Brechin | Contrafow and Lane Closures
M8 Junction 23 to 25 | Site Investigation
A84 Doctors Corner (Strathyre and Callander) | Drainage Improvements
A9 Longman Roundabout | Road Marking Improvements
A720 Lothianburn-Straiton | Resurfacing
A87 Glen Shiel | Resurfacing
A84 Loch Lubnaig | Carriageway Improvements
A90 Finavon Bridge | Bridge Investigation Works
A9 Portgower | Essential Surfacing Works
A96 near Inverness Airport | Overnight Surfacing
A9 Aberuthven | Surfacing Improvements
A90 at Peterhead | Resurfacing
A82 Lomondgate - Stoneymollan Roundabouts | Essential Investigations
A737 Dalry Bypass | Traffic Management
A75 Kellhead Cottages | SPEN Works
A77 Stranraer | SP Energy Work
A887 West Of Invermoriston | Rock Slope Stabilisation
A701 Dalscone Farm | Third Party Works
A85 St Fillans | Bus Stop Improvements
A83 Corran Roundabout | Carriageway Improvements
A9 South of Birnam | Signing Improvements
A82 Nevis Roundabout | Overnight Surfacing Works
A9 Raigmore Interchange | Investigation Work
A1 Wallyford to Abbotsview | Southbound Drainage Works
M876 Dennyloanhead | Westbound Resurfacing Work
M9 Junction 3-4 | Bridge Refurbishment Works
A77 South of Ayr | Essential Traffic Signal Installation
A9 Tomatin and Moy | Temporary Average Speed Cameras To Commence Enforcement
A835 Loch Garve | Overnight Geophysical Surveys
A9 Birnam | Signage Improvements
Chris Brown | OVO Hydro
A82 South of Drumnadrochit | Overnight Surfacing
A725 Eastbound of Blantyre | Essential Resurfacing
A720 Slip Roads | Investigation Works
A75 between Barlae and Newton Stewart | Essential Resurfacing
A702 North of Abington | Resurfacing Work
A9 Newtonmore | Surfacing Improvements
Bennetts British Superbike Championship | Knockhill
Scottish Game Fair | Scone Palace
M876 Junction 2 On-Slip near Larbert | Resurfacing
DOOF In The Park 2025 | Camperdown Park Dundee
A830 East of Ranochan | Additional Rock Slope Works
A85 Loch Awe | Drainage Investigation
A75 Springholm | Footway Improvements
A86 WEST OF LAGGAN DAM | SURFACING IMPROVEMENTS
A9 Dualling Tomatin to Moy | Road Re-Alignment Works At Various Locations North Of The Project
A8 Newhouse Roundabout & Eurocentral | Westbound Overnight Closure
A835 Garve And Tarvie | Overnight Roadmarking Works
M80 Junction 9 off-slip | Investigation Works
Kendrick Lamar and SZA | Hampden Park
Genesis Scottish Open 2025 | North Berwick
A77 Dalrymple Street Girvan | BT Openreach Essential Roadworks
A1 East Linton | Resurfacing Works
A898 Erskine Bridge | Resurfacing Work
Network Rail Langbank Road Closure 11th-12th July | Railway Bridge Survey
A830 Three Locations | Overnight Road Resurfacing
A82 Invergarry | Overnight Resurfacing
M8 Junction 1 | Carriageway Repairs
The Tall Ships Race 2025 | Aberdeen
A701 Beattock | Essential Investigation
A9 Cromarty Bridge | Maintenance Works
A725 Shawhead and Raith Junctions | Overnight Closures
Glasgow City Council A739 Clyde Tunnel Expressway | Emergency Roadworks
Glasgow City Council A739 Phase 4 Clyde Tunnel Expressway | Emergency Roadworks
Network Rail Langbank Road Closure 8th-9th August | Railway Bridge Survey
A9 Strathsteven Bridge | Essential Maintenance
A78 Wemyss Bay | Network Rail Bridge Survey
Network Rail Langbank Road Closure 5th-6th September | Railway Bridge Survey
Network Rail Langbank Road Closure 3rd-4th October | Railway Bridge Survey
Network Rail Langbank Road Closure 31st October-1st November | Railway Bridge Survey
Planned roadworks
-
21st of May 2025, 7:00am30th of June 2025, 7:00pmA82 Grotaig to Alltsigh NB - Rolling TTL
-
21st of May 2025, 7:00am30th of June 2025, 7:00pmA82 Grotaig to Alltsigh SB - Rolling TTL
-
23rd of June 2025, 8:00pm30th of June 2025, 6:00amA721 Southbound to M74 Southbound - Total closure
-
29th of June 2025, 8:00pm30th of June 2025, 6:00amM8 Eastbound Junction 10 to Junction 9 - Offside lane closure
-
1st of July 2025, 6:00am11th of July 2025, 7:30pmA7-NB-South of Selkirk- TTLs
-
1st of July 2025, 6:00am11th of July 2025, 7:30pmA7-SB-South of Selkirk-TTLs
-
1st of July 2025, 6:01am25th of July 2025, 8:00pmM9 - EB - Junction 4 to 3 - lane closure
-
1st of July 2025, 6:01am25th of July 2025, 8:00pmM9 - WB - Junction 3 to 4 - lane closure
-
1st of July 2025, 8:00am1st of July 2025, 12:00pmM74 NB J16-J15 - Lane Closure
-
1st of July 2025, 8:00am1st of July 2025, 4:00pmM74 SB J16-J15 - Lane Closure
-
1st of July 2025, 8:00am1st of July 2025, 12:00pmA82 Crianlarich South Rnbt - Vergeworks
-
1st of July 2025, 8:00am1st of July 2025, 12:00pmA9 Clynemilton North of Brora - Stop/Go Works
-
1st of July 2025, 8:00am4th of July 2025, 4:00pmA75/A780 EB Rbt to the A75 Drummore Rbt Route Part of Diverson
-
1st of July 2025, 8:00am4th of July 2025, 4:00pmA75/A780 Rbt WB to the A75 Drummore Rbt Route Part tof Diverson
-
1st of July 2025, 8:30am4th of July 2025, 6:00pmA82 Balbeg South of Drumnadrochit SB - TTL
-
1st of July 2025, 8:30am4th of July 2025, 6:00pmA82 Balbeg South of Drumnadrochit NB - TTL
-
1st of July 2025, 9:00am1st of July 2025, 4:00pmA9 Murthly Castle Drive South of Dunkeld - Vergeworks
-
1st of July 2025, 9:00am1st of July 2025, 5:00pmA90 Inchture - Lane Closure S/B
-
1st of July 2025, 9:30am1st of July 2025, 3:30pmM73 Southbound Junction 2a off-slip - Total closure
-
1st of July 2025, 9:30am1st of July 2025, 4:30pmA68 NB - TTL's - Lilliardsedge
-
1st of July 2025, 9:30am1st of July 2025, 4:30pmA68 SB - TTL's - Lilliardsedge
-
1st of July 2025, 9:30am1st of July 2025, 4:30pmA68 NB - TTL's - Soutra Hill
-
1st of July 2025, 9:30am1st of July 2025, 4:30pmA68 SB - TTL's - Soutra Hill
-
1st of July 2025, 9:30am1st of July 2025, 4:30pmA7 NB - TTL's - Kirkstile
-
1st of July 2025, 9:30am1st of July 2025, 4:30pmA7 SB - TTL's - Kirkstile
-
1st of July 2025, 9:30am1st of July 2025, 4:30pmA7 SB - TTL's - Eskdalemuir Jct
-
1st of July 2025, 9:30am1st of July 2025, 4:30pmA7 NB - TTL's - Eskdalemuir Jct
-
1st of July 2025, 9:30am1st of July 2025, 3:30pmM8 WB at Jct 29 - HS Closure
-
1st of July 2025, 9:30am1st of July 2025, 3:30pmM8 EB at Jct 29 - HS Closure
-
1st of July 2025, 9:30am1st of July 2025, 3:30pmM8 EB Jct 29 On Slip - HS Closure
-
1st of July 2025, 9:30am3rd of July 2025, 3:30pmA85 Quoig West of Crieff WB - TTL
-
1st of July 2025, 9:30am3rd of July 2025, 3:30pmA85 Quoig West of Crieff EB - TTL
-
1st of July 2025, 9:30am1st of July 2025, 3:30pmA92 Rathillet - TTL's
-
1st of July 2025, 9:30am3rd of July 2025, 3:30pmA75 Inn on the Loch WB- TTL
-
1st of July 2025, 9:30am3rd of July 2025, 3:30pmA75 Inn on the Loch EB- TTL
-
1st of July 2025, 9:30am2nd of July 2025, 4:00pmA76 SB Glasgow Rd at New Bridge - TTLs
-
1st of July 2025, 9:30am2nd of July 2025, 4:00pmA76 NB Glasgow Rd at New Bridge - TTLs
-
1st of July 2025, 10:00am3rd of July 2025, 4:00pmA726/A727 - Carmunnock to West Mains OS closures east
-
1st of July 2025, 10:00am3rd of July 2025, 4:00pmA726/A727 - Carmunnock to West Mains OS closures west
-
1st of July 2025, 12:00pm1st of July 2025, 4:30pmA9 Borgue - Stop/Go Works
-
1st of July 2025, 7:00pm14th of July 2025, 7:00amA84 Craigforth - Convoy Works
-
1st of July 2025, 7:00pm3rd of July 2025, 6:00amA82 Bunloit South of Drumnadrochit NB - Road Closure with Amnesties
-
1st of July 2025, 7:00pm3rd of July 2025, 6:00amA82 Bunloit South of Drumnadrochit SB - Road Closure with Amnesties
-
1st of July 2025, 7:30pm2nd of July 2025, 6:30amA90 Kingsway Off slip- Slip Closure S/B
-
1st of July 2025, 7:30pm2nd of July 2025, 6:30amA90 Kingsway Lane Closure S/B
-
1st of July 2025, 7:30pm2nd of July 2025, 6:30amM90 Kelty on slip - Lane Closure N/B
-
1st of July 2025, 7:30pm2nd of July 2025, 6:30amM90 Kelty- Lane Closure N/B
-
1st of July 2025, 7:30pm1st of July 2025, 11:59pmA96 Newton of Petty - TTL's
-
1st of July 2025, 8:00pm2nd of July 2025, 6:00amA737 SB Kilbarchan IC to Howwood Road Closure
-
1st of July 2025, 8:00pm2nd of July 2025, 6:00amA737 NB Howwood to Kilbarchan IC Road Closure
-
1st of July 2025, 8:00pm3rd of July 2025, 6:00amA8 Eastbound Baillieston Lights to Swinton Rbt - Progressive nearside & offside lane closures
-
1st of July 2025, 8:00pm3rd of July 2025, 6:00amA8 Westbound Swinton rbt to Baillieston Lights - Progressive Nearside & Offside lane closure
-
1st of July 2025, 8:00pm2nd of July 2025, 6:00amM73 Northbound Junction 2a on-slip - Total closure
-
1st of July 2025, 8:00pm2nd of July 2025, 6:00amA76 Afton Bridgend New Cumnock SB- TTL
-
1st of July 2025, 8:00pm2nd of July 2025, 6:00amA76 Afton Bridgend New Cumnock NB- TTL
-
1st of July 2025, 8:00pm2nd of July 2025, 6:00amA76 Kilmarnock Road Mauchline SB- TTL
-
1st of July 2025, 8:00pm2nd of July 2025, 6:00amA76 Kilmarnock Road Mauchline NB- TTL
-
1st of July 2025, 8:00pm2nd of July 2025, 6:00amA76 Dumfries Rd Netherthird SB - Stop & Go
-
1st of July 2025, 8:00pm2nd of July 2025, 6:00amA76 Dumfries Rd Netherthird NB - Stop & Go
-
1st of July 2025, 8:00pm2nd of July 2025, 6:00amA9 Sth of Broxden Rbt, Perth - NB12 - N/B MLC
-
1st of July 2025, 8:00pm2nd of July 2025, 6:00amA9 Nth of A824 Auchterarder Jct - NB08 - N/B MLC
-
1st of July 2025, 8:00pm2nd of July 2025, 6:00amA9 Nth of Tibbermore Jct - SB02 - S/B MLC
-
1st of July 2025, 8:00pm2nd of July 2025, 6:00amA85 Dunollie Rd Oban - Vergeworks
-
1st of July 2025, 8:00pm2nd of July 2025, 6:00amM8 EB Jct 25 - 24 Lane 1 Closure
-
1st of July 2025, 8:00pm2nd of July 2025, 6:00amA78 NB Inverkip Road /IBM Lane 2 Closure
-
1st of July 2025, 8:00pm2nd of July 2025, 6:00amA78 SB Inverkip Road /IBM Lane 2 Closure
-
1st of July 2025, 8:00pm2nd of July 2025, 6:00amA77 South of Bankfield Roundabout SB - TTL's
-
1st of July 2025, 8:00pm2nd of July 2025, 6:00amA77 South of Bankfield Roundabout NB - TTL's
-
1st of July 2025, 8:00pm2nd of July 2025, 6:00amA9 Cromarty Bridge NB - TTL
-
1st of July 2025, 8:00pm2nd of July 2025, 6:00amA77 Grassyards off slip SB- Lane Closure
-
1st of July 2025, 8:00pm2nd of July 2025, 6:00amA9 Cromarty Bridge SB - TTL
-
1st of July 2025, 8:00pm2nd of July 2025, 6:00amM8 Jct 20 West St onslip EB - Total Closure
-
1st of July 2025, 8:00pm2nd of July 2025, 6:00amM8 WB Jct 24 - 25 - Lane Closure
-
1st of July 2025, 8:00pm2nd of July 2025, 6:00amM8 WB Jct 24 on slip from Helen Street -Slip Closure
-
1st of July 2025, 8:00pm2nd of July 2025, 6:00amM8 WB Junction 25 Off Slip To Fifty Pitches Road- Slip Closure
-
1st of July 2025, 8:00pm2nd of July 2025, 6:00amM8 WB Jct 25 to Jct 26 on slip - Lane Closure
-
1st of July 2025, 8:00pm2nd of July 2025, 6:00amM8 WB Jct 25 On Slip From Fifty Pitches Road - Slip Closure
-
1st of July 2025, 8:00pm2nd of July 2025, 6:00amM8 WB Jct 25a Offslip To Braehead - Slip Closure
-
1st of July 2025, 8:00pm2nd of July 2025, 6:00amM8 WB Jct 26 Offslip - Slip Closure
-
1st of July 2025, 9:00pm2nd of July 2025, 6:00amM74 SB J14-J15 - Single Lane Running
-
2nd of July 2025, 7:00am2nd of July 2025, 7:00pmA9 Toremore North of Dunbeath - Stop/Go Works
-
2nd of July 2025, 8:00am9th of July 2025, 5:00pmA90 Milltimber to South Kingswells (NB)
-
2nd of July 2025, 8:00am2nd of July 2025, 4:00pmM74 SB J14-J15 - Lane Closure
-
2nd of July 2025, 8:00am15th of July 2025, 5:00pmA85 Crieff to Comrie - Diversion Signage
-
2nd of July 2025, 8:00am7th of July 2025, 6:00pmM90 Perth- Directional signage for the Scottish Game Fair N/B
-
2nd of July 2025, 8:00am7th of July 2025, 6:00pmA9 Perth to Luncarty NB - Signage
-
2nd of July 2025, 8:00am7th of July 2025, 6:00pmA9 Perth to Luncarty SB - Signage
-
2nd of July 2025, 8:00am7th of July 2025, 6:00pmA85 Perth to Huntingtower - Signage
-
2nd of July 2025, 8:00am7th of July 2025, 11:00pmA78 SB Kelburnfoot - TTLs
-
2nd of July 2025, 8:00am7th of July 2025, 11:00pmA78 NB Kelburnfoot - TTLs
-
2nd of July 2025, 9:00am2nd of July 2025, 5:00pmA96 Forgie, Nrth of Keith- TTL N/B
-
2nd of July 2025, 9:30am3rd of July 2025, 3:30pmA1 - SB - Torness Jct - TTL's
-
2nd of July 2025, 9:30am11th of July 2025, 6:00pmA78 Inverkip Rd Greenock NB - TTLS
-
2nd of July 2025, 9:30am11th of July 2025, 6:00pmA78 Inverkip Rd Greenock SB - TTLS
-
2nd of July 2025, 9:30am2nd of July 2025, 12:00pmA84 Burn of Cambus Buchany - Stop/Go Works
-
2nd of July 2025, 9:30am2nd of July 2025, 4:30pmA7 SB - Stop/Go boards - Auckenrivok, N of Hollows Jct
-
2nd of July 2025, 9:30am2nd of July 2025, 4:30pmA7 NB - Stop/Go boards - Auckenrivok, N of Hollows Jct
-
2nd of July 2025, 9:30am2nd of July 2025, 4:30pmA1 NB - Lane Closure - Houndwood
-
2nd of July 2025, 9:30am2nd of July 2025, 3:30pmA77 Ballantrae SB- TTL
-
2nd of July 2025, 9:30am2nd of July 2025, 3:30pmA77 Ballantrae NB- TTL
-
2nd of July 2025, 9:30am3rd of July 2025, 3:30pmM90 J3 Halbeath to J5 Gairneybridge Interchange. N/B hard shoulder closure
-
2nd of July 2025, 9:30am3rd of July 2025, 3:30pmM90 J3 Halbeath to J5 Gairneybridge Interchange. S/B hard shoulder closure
-
2nd of July 2025, 10:00am2nd of July 2025, 12:00pmA9 Rangag South of Achavanich - Stop/Go Works
-
2nd of July 2025, 10:00am2nd of July 2025, 11:30amA78 SB at St Phillans - TTLS
-
2nd of July 2025, 10:00am2nd of July 2025, 11:30amA78 NB at St Phillans - TTLS
-
2nd of July 2025, 12:00pm4th of July 2025, 4:30pmA9 Ousdale North of Helmsdale NB - TTL
-
2nd of July 2025, 12:00pm4th of July 2025, 4:30pmA9 Ousdale North of Helmsdale SB - TTL
-
2nd of July 2025, 12:00pm2nd of July 2025, 2:00pmA78 NB Inverkip Rd at Inverkip - TTLs
-
2nd of July 2025, 12:00pm2nd of July 2025, 2:00pmA78 SB Inverkip Rd at Inverkip - TTLs
-
2nd of July 2025, 7:00pm3rd of July 2025, 11:59pmA835 Loch Garve Tarvie - Convoy Works
-
2nd of July 2025, 7:00pm3rd of July 2025, 7:00amA82 Corrychurrachan to Loch Linnhe North of Corran NB - TTL
-
2nd of July 2025, 7:00pm3rd of July 2025, 7:00amA82 Corrychurrachan to Loch Linnhe North of Corran SB - TTL
-
2nd of July 2025, 7:00pm4th of July 2025, 4:00amA85 Monzievaird West of Crieff WB - TTL
-
2nd of July 2025, 7:00pm4th of July 2025, 4:00amA85 Monzievaird West of Crieff EB - TTL
-
2nd of July 2025, 7:00pm3rd of July 2025, 7:00amA82 South of Invergloy NB - Convoy Works
-
2nd of July 2025, 7:00pm3rd of July 2025, 7:00amA82 South of Invergloy SB - Convoy Works
-
2nd of July 2025, 7:30pm3rd of July 2025, 6:30amA90 Barras Jct, Sth of Stonehaven. N/B lane closure
-
2nd of July 2025, 7:30pm3rd of July 2025, 6:30amA90 Kingsway West, Dundee. N/B lane closure
-
2nd of July 2025, 7:30pm3rd of July 2025, 6:30amA90 East Dock St, Dundee. N/B lane closure
-
2nd of July 2025, 7:30pm3rd of July 2025, 6:30amM90- Crook of Devon, Fruix- Lane Closure N/B
-
2nd of July 2025, 7:30pm4th of July 2025, 6:30amA92 Redhouse roundabout- Inner ring lane closure
-
2nd of July 2025, 7:30pm3rd of July 2025, 6:00amM876 Kinnaird House to Bowtrees EB- Lane Closures
-
2nd of July 2025, 8:00pm3rd of July 2025, 6:00amM8 Jct 15 Loop U onslip WB - Total Closure
-
2nd of July 2025, 8:00pm3rd of July 2025, 6:00amM8 Jct 16 offslip WB - Total Closure
-
2nd of July 2025, 8:00pm3rd of July 2025, 6:00amM8 Jct 15 to Jct 16 WB- Lane Closures
-
2nd of July 2025, 8:00pm3rd of July 2025, 6:00amM8 EB Jct 24 to Jct 22 - Lane Closure
-
2nd of July 2025, 8:00pm3rd of July 2025, 6:00amM8 EB Jct 24 on slip from Helen Street - Slip Closure
-
2nd of July 2025, 8:00pm3rd of July 2025, 6:00amM8 EB Jct 23 on slip from Dumbreck Road - Slip Closure
-
2nd of July 2025, 8:00pm3rd of July 2025, 6:00amM8 EB Jct 22 to M74 Jct 1 - Closure
-
2nd of July 2025, 8:00pm3rd of July 2025, 6:00amM8 EB Jct 22 to Jct 20 - Lane 1 Closure
-
2nd of July 2025, 8:00pm3rd of July 2025, 6:00amM8 EB Jct 22 off slip Seaward St - Slip Closure
-
2nd of July 2025, 8:00pm3rd of July 2025, 6:00amM8 WB Jct 22 Seward Street- Slip Closure
-
2nd of July 2025, 8:00pm3rd of July 2025, 6:00amM8 WB Jct 22 link Road to M77 Merge - Lane 1 Closure
-
2nd of July 2025, 8:00pm3rd of July 2025, 6:00amM80 SB J2 off slip - Slip Closure
-
2nd of July 2025, 8:00pm3rd of July 2025, 6:00amM80 NB J2 on slip - Slip Closure
-
2nd of July 2025, 8:00pm3rd of July 2025, 6:00amM80 SB J2 on slip - Slip Closure
-
2nd of July 2025, 8:00pm3rd of July 2025, 6:00amM80 SB J1 off slip - Slip Closure
-
2nd of July 2025, 8:00pm3rd of July 2025, 6:00amM8 WB Jct 26 on slip from Hillington IC - Slip Closure
-
2nd of July 2025, 8:00pm3rd of July 2025, 6:00amM8 WB Jct 10 to Jct 28 - Mobile Lane Closure
-
2nd of July 2025, 8:00pm3rd of July 2025, 6:00amM8 EB Jct 28 to Jct 10 - Mobile Lane Closure
-
2nd of July 2025, 8:00pm3rd of July 2025, 6:00amM74 NB Jct 3a to M8 jct 20 - Mobile Lane Closure
-
2nd of July 2025, 8:00pm3rd of July 2025, 6:00amM74 SB Jct 1 to Jct 3a - Mobile Lane Closures
-
2nd of July 2025, 8:00pm6th of July 2025, 6:00amA725 NB Main Street Slip - Whistleberry Toll/Bellshill Road - Total Closure
-
2nd of July 2025, 8:00pm6th of July 2025, 6:00amA725 East Kilbride Expressway Main Street NB Onslip - Total Closure
-
2nd of July 2025, 8:00pm6th of July 2025, 6:00amA725 East Kilbride Expressway onslip from Glasgow Road- Total Closure
-
2nd of July 2025, 8:00pm6th of July 2025, 6:00amA725 N/B off to Whistleberry Road - Total Closure
-
2nd of July 2025, 8:00pm6th of July 2025, 6:00amA725 East Kilbride Expressway from Whistleberry Road - Total Closure
-
2nd of July 2025, 8:00pm6th of July 2025, 6:00amA725 N/B off to Whistleberry Toll/Bellshill Road - Total Closure
-
2nd of July 2025, 8:00pm3rd of July 2025, 6:00amM73 Southbound to M74 Northbound Link Road - Total Closure
-
2nd of July 2025, 8:00pm3rd of July 2025, 6:00amM73 Southbound Junction 2 Baillieston on-slip - total closure
-
2nd of July 2025, 8:00pm3rd of July 2025, 5:00amA9 Inveralmond NB - Lane Closure
-
2nd of July 2025, 8:00pm3rd of July 2025, 5:00amA9 Inveralmond SB - Lane Closure
-
2nd of July 2025, 8:00pm4th of July 2025, 6:00amM90 Kinross Lane Closure S/B
-
2nd of July 2025, 8:00pm3rd of July 2025, 6:00amA8 Eastbound Swinton Rbt to Bargeddie Rbt - Progressive nearside & offside lane closure
-
2nd of July 2025, 8:00pm3rd of July 2025, 6:00amA8 Westbound Bargeddie Rbt to Swinton Rbt - Progressive nearside & offside lane closures
-
2nd of July 2025, 8:00pm3rd of July 2025, 6:00amM80 S/B between J6a Castlecary and J6 Old Inns - Hardshoulder Closure
-
2nd of July 2025, 8:00pm3rd of July 2025, 6:00amA9 Nth of A823 Gleneagles off slip - NB06 - N/B MLC
-
2nd of July 2025, 8:00pm3rd of July 2025, 6:00amA9 Sth of Greenloaning Jct - NB04 - N/B MLC
-
2nd of July 2025, 8:00pm3rd of July 2025, 6:00amA9 Sth of A823 Gleneagles S/B on slip - SB06 - S/B MLC
-
2nd of July 2025, 8:00pm3rd of July 2025, 6:00amA78 Irvine Rd Largs SB - TTLS
-
2nd of July 2025, 8:00pm3rd of July 2025, 6:00amA78 Irvine Rd Largs NB - TTLS
-
2nd of July 2025, 8:00pm3rd of July 2025, 6:00amA77 Bankfield Rbt SB - Lane Closure
-
2nd of July 2025, 8:00pm3rd of July 2025, 6:00amM8 EB @ Jct 13 - 12 Lane 1 Closure
-
2nd of July 2025, 8:00pm3rd of July 2025, 6:00amM8 WB Jct 14- 15 Hard Shoulder Closure
-
2nd of July 2025, 8:00pm3rd of July 2025, 6:00amM74 WB Jct 29 After St James IC Lane 1 Closure
-
2nd of July 2025, 8:00pm3rd of July 2025, 6:00amM8 WB Jct 29 - 29a -Lane 2 Closure
-
2nd of July 2025, 8:00pm3rd of July 2025, 6:00amM8 EB Jct 29a - 29 - Lane 2 Closure
-
2nd of July 2025, 8:00pm4th of July 2025, 6:00amA82 NB Lomondgate Rbt to Stoneymollan Rbt - Total Closure
-
2nd of July 2025, 8:00pm4th of July 2025, 6:00amA82 NB Off Slip to Renton Rd - Total Closure
-
2nd of July 2025, 8:00pm16th of July 2025, 6:00amA82 SB Stoneymollan Rbt to Lomondgate Rbt - Offside Lane Closure
-
2nd of July 2025, 8:00pm3rd of July 2025, 6:00amA898 NB Erskine Bridge - Lane Closure
-
2nd of July 2025, 8:30pm3rd of July 2025, 6:00amA720 WB Calder Offslip Road Closure
-
2nd of July 2025, 8:30pm5th of July 2025, 6:00amM8 - EB - Jct 3a to Jct 3 - Road closure
-
2nd of July 2025, 8:30pm5th of July 2025, 6:00amM8 - EB - Jct 3a on slip - Road closure
-
2nd of July 2025, 8:30pm5th of July 2025, 6:00amM8 - EB - Jct 3 off slip - Road closure
-
2nd of July 2025, 9:00pm3rd of July 2025, 6:00amM74 SB J14-J15 - Single Lane Running
-
3rd of July 2025, 6:00am4th of July 2025, 4:00pmM8 EB Jct 28 Onslip - Hard Shoulder Closure
-
3rd of July 2025, 8:00am3rd of July 2025, 4:00pmM74 NB J21-J20 - Lane Closure
-
3rd of July 2025, 8:00am5th of July 2025, 5:00pmA9 Perth- Signage N/B
-
3rd of July 2025, 8:00am5th of July 2025, 5:00pmA9 Aberuthven- Div signage N/B
-
3rd of July 2025, 9:00am4th of July 2025, 5:00pmA95 Auchlunkart- TTL N/B
-
3rd of July 2025, 9:00am3rd of July 2025, 6:00pmA95 Grantown-on -Spey TTL N/B
-
3rd of July 2025, 9:30am3rd of July 2025, 3:30pmM73 Northbound Junction 2 on-slip - Total closure
-
3rd of July 2025, 9:30am3rd of July 2025, 3:30pmM73 Southbound Junction 2 off-slip - Total closure
-
3rd of July 2025, 9:30am3rd of July 2025, 4:30pmA1 NB - Lane Closure - North of Thistly Cross Rbt
-
3rd of July 2025, 7:00pm4th of July 2025, 7:00amA86 Kinloch Laggan to Kingussie EB - TTL
-
3rd of July 2025, 7:00pm4th of July 2025, 7:00amA86 Kinloch Laggan to Kingussie WB - TTL
-
3rd of July 2025, 7:00pm5th of July 2025, 6:00amA75 Halfway House WB - Road Closure
-
3rd of July 2025, 7:00pm5th of July 2025, 6:00amA75 Halfway House EB - Road Closure
-
3rd of July 2025, 7:30pm5th of July 2025, 6:30amA92 Redhouse roundabout- Lane Closure N/B
-
3rd of July 2025, 7:30pm4th of July 2025, 6:30amA96 Old Rayne- TTL S/B
-
3rd of July 2025, 7:30pm10th of July 2025, 6:00amA702 - NB - North of Abington - Road Closure
-
3rd of July 2025, 7:30pm10th of July 2025, 6:00amA702 - SB - North of Abington - Road Closure
-
3rd of July 2025, 7:30pm4th of July 2025, 6:30amA9 A9294 Onslip NB - Slip Closure
-
3rd of July 2025, 8:00pm5th of July 2025, 6:00amA78 SB Inverkip Road TTL
-
3rd of July 2025, 8:00pm5th of July 2025, 6:00amA78 NB Inverkip Road TTL
-
3rd of July 2025, 8:00pm4th of July 2025, 6:00amM8 prior to Jct 12 offslip WB - Hard Shoulder Closure
-
3rd of July 2025, 8:00pm4th of July 2025, 6:00amM8 Jct 12 offslip WB - Total Closure
-
3rd of July 2025, 8:00pm4th of July 2025, 6:00amM8 EB Jct 18 onslip from Charing Cross - Closure
-
3rd of July 2025, 8:00pm4th of July 2025, 6:00amM8 EB Jct 16 onslip from Craighall Closure
-
3rd of July 2025, 8:00pm4th of July 2025, 6:00amM8 EB Jct 15 onslip from Castle Street - Closure
-
3rd of July 2025, 8:00pm4th of July 2025, 6:00amM8 EB Jct 15 onslip from Stirling Road - Closure
-
3rd of July 2025, 8:00pm4th of July 2025, 6:00amM8 EB Jct 15 offslip to Springburn Expressway - Closure
-
3rd of July 2025, 8:00pm4th of July 2025, 6:00amM8 EB Jct 14 offslip to Viewpark Avenue - Closure
-
3rd of July 2025, 8:00pm4th of July 2025, 6:00amM8 EB Jct 18 to Jct 13 - Lane Closure
-
3rd of July 2025, 8:00pm4th of July 2025, 6:00amM8 EB Jct 13 Link Road to M80 NB Jct 2 - Closure
-
3rd of July 2025, 8:00pm5th of July 2025, 6:00amA78 NB Dutchouse to Montfode - Mobile Lane Closure
-
3rd of July 2025, 8:00pm4th of July 2025, 6:00amM80 NB Jct 1 on slip from Blochairn Road - Slip Closure
-
3rd of July 2025, 8:00pm5th of July 2025, 6:00amA78 SB Montfode to Dutchouse - Mobile lane closure
-
3rd of July 2025, 8:00pm4th of July 2025, 6:00amM80 NB Jct 2 offslip to Robroyston Link Road - Slip Closure
-
3rd of July 2025, 8:00pm5th of July 2025, 6:00amA77 NB Whitletts to Meiklewood - Mobile Lane Closure
-
3rd of July 2025, 8:00pm4th of July 2025, 6:00amM8 WB Jct 21 onslip from Carnoustie St on slip - Slip Closure
-
3rd of July 2025, 8:00pm5th of July 2025, 6:00amA77 SB Meiklewood to Whitletts - Mobile Lane Closure
-
3rd of July 2025, 8:00pm4th of July 2025, 6:00amM8 WB Jct 21 to Jct 22 Lane 3 & 4 Closure
-
3rd of July 2025, 8:00pm4th of July 2025, 6:00amM8 WB M74 Jct 1 - 22 Sec Cway - Closure
-
3rd of July 2025, 8:00pm4th of July 2025, 6:00amM8 WB Jct 23 offslip to Dumbreck Road - Slip Closure
-
3rd of July 2025, 8:00pm4th of July 2025, 6:00amM8 WB Jct 24 Offslip to Helen Street - Slip Closure
-
3rd of July 2025, 8:00pm4th of July 2025, 6:00amM8 WB Jct 22 - HS Closure
-
3rd of July 2025, 8:00pm4th of July 2025, 6:00amM8 Eastbound Junction 6A to Junction 6 Newhouse - Total closure
-
3rd of July 2025, 8:00pm4th of July 2025, 6:00amM73 Northbound Junction 2 off-slip - Total closure
-
3rd of July 2025, 8:00pm4th of July 2025, 6:00amA9 Nth of A8033 Queen Vic Jct, Dunblane N/B - NB03 - N/B MLC
-
3rd of July 2025, 8:00pm4th of July 2025, 6:00amA9 Nth of Keir Rbt, Dunblane S/B - SB11 - S/B MLC
-
3rd of July 2025, 8:00pm4th of July 2025, 6:00amA9 Nth of Blackford Jct. S/B - SB07 - S/B MLC
-
3rd of July 2025, 8:00pm4th of July 2025, 6:00amA77 Chapeldonan SB- TTL
-
3rd of July 2025, 8:00pm4th of July 2025, 6:00amA77 Chapeldonan NB- TTL
-
3rd of July 2025, 8:00pm4th of July 2025, 6:00amA77 Kirkoswald Rd SB- TTL
-
3rd of July 2025, 8:00pm4th of July 2025, 6:00amA77 Kirkoswald NB- TTL
-
3rd of July 2025, 8:00pm4th of July 2025, 6:00amM74 SB Jct 7 Offslip to A72 Lane 2 Closure
-
3rd of July 2025, 8:00pm4th of July 2025, 6:00amM74 NB Jct 2 - Lane 1 Closure
-
3rd of July 2025, 8:00pm4th of July 2025, 5:00amA9 Luncarty SB - Lane Closure
-
3rd of July 2025, 8:00pm11th of July 2025, 6:00amA9 Braes of Nuide Newtonmore - Convoy Works
-
3rd of July 2025, 8:30pm4th of July 2025, 6:00amA720 - WB - Lasswade Onslip - Road Closure
-
3rd of July 2025, 8:30pm5th of July 2025, 6:00amM90 Jct 1 EB to M9 Jct1A EB - Single Lane Running
-
3rd of July 2025, 8:30pm5th of July 2025, 6:00amM9 EB Jct 1A to Newbridge EB Offslip - Lane Closures
-
4th of July 2025, 6:00am4th of July 2025, 7:00pmA75 Halfway House WB - TTL's
-
4th of July 2025, 6:00am4th of July 2025, 7:00pmA75 Halfway House EB - TTL's
-
4th of July 2025, 7:00am4th of July 2025, 7:00pmA887 Dundreggan - Stop/Go Works
-
4th of July 2025, 8:00am4th of July 2025, 4:00pmM74 SB J13-J14 - Hard Shoulder Closure
-
4th of July 2025, 8:00am16th of July 2025, 4:00pm15B Cross St, Fraserburgh - Scaffolding
-
4th of July 2025, 9:00am5th of July 2025, 6:00amA90 Dundee- Lane closure N/B
-
4th of July 2025, 9:00am19th of July 2025, 9:00amA96 Huntly-Keith- MVMS N/B
-
4th of July 2025, 9:30am4th of July 2025, 3:30pmA1 SB - Lane Closure - Wallyford offslip
-
4th of July 2025, 9:30am4th of July 2025, 3:30pmA701 Parkgate SB- TTL
-
4th of July 2025, 9:30am4th of July 2025, 3:30pmA701 Parkgate NB- TTL
-
4th of July 2025, 7:00pm5th of July 2025, 7:00amA9 Latheron NB - TTL
-
4th of July 2025, 7:00pm5th of July 2025, 7:00amA85 Lochawe EB - TTL
-
4th of July 2025, 7:00pm5th of July 2025, 7:00amA85 Lochawe WB - TTL
-
4th of July 2025, 7:00pm5th of July 2025, 7:00amA9 Lynchat South of Kincraig SB - TTL
-
4th of July 2025, 7:00pm5th of July 2025, 7:00amA9 Lynchat South of Kincraig NB - TTL
-
4th of July 2025, 7:00pm5th of July 2025, 7:00amA9 Ralia SB - TTL
-
4th of July 2025, 7:00pm5th of July 2025, 7:00amA9 Ralia NB - TTL
-
4th of July 2025, 7:00pm5th of July 2025, 7:00amA9 Pitlochry SB - TTL
-
4th of July 2025, 7:00pm5th of July 2025, 7:00amA9 Pitlochry NB - TTL
-
4th of July 2025, 7:00pm5th of July 2025, 7:00amA9 Birnam SB - TTL
-
4th of July 2025, 7:00pm5th of July 2025, 7:00amA9 Birnam NB - TTL
-
4th of July 2025, 7:00pm5th of July 2025, 1:00amA737 Dalry Rd NB - Stop / Go Boards
-
4th of July 2025, 7:00pm5th of July 2025, 1:00amA737 Dalry Rd SB - Stop / Go Boards
-
4th of July 2025, 7:00pm5th of July 2025, 7:00amA9 Latheron SB - TTL
-
4th of July 2025, 7:30pm11th of July 2025, 6:30amA90 Willows to Blackhills, Longhaven- Road Closure-N/B
-
4th of July 2025, 7:30pm11th of July 2025, 6:30amA90 Willows to Blackhills, Longhaven- Road Closure-S/B
-
4th of July 2025, 8:00pm5th of July 2025, 6:00amM8 WB Jct 15 on slip from Stirling Rd - Slip Closure
-
4th of July 2025, 8:00pm5th of July 2025, 6:00amM8 WB Jct 15 to Jct 18 offside and adjacent - Lane Closures
-
4th of July 2025, 8:00pm5th of July 2025, 6:00amM8 WB Jct 17 offslip - Slip Closure
-
4th of July 2025, 8:00pm5th of July 2025, 6:00amM8 EB Jct 17 onslip from A82 Great Western Road Slip Closure
-
4th of July 2025, 8:00pm5th of July 2025, 6:00amM8 EB Prior to Jct 17 on slip to Jct 15 - OSL Closure
-
4th of July 2025, 8:00pm5th of July 2025, 6:00amM73 Southbound Junction 2a on-slip - Total Closure
-
4th of July 2025, 8:00pm5th of July 2025, 6:00amM8 EB Jct 15 off slip to Stirling Road/Castle Street - Slip Closure
-
4th of July 2025, 8:00pm5th of July 2025, 6:00amM74 Northbound Junction 5 main line - Offside & adjacent lane closure
-
4th of July 2025, 8:00pm5th of July 2025, 6:00amA8(M) Baillieston Roundabout - Progressive inner & outer ring closures
-
4th of July 2025, 8:00pm5th of July 2025, 6:00amA8 Swinton to Baillieston Rbt Eastbound - Progressive nearside & offside lane closures
-
4th of July 2025, 8:00pm5th of July 2025, 6:00amM73 Southbound Junction 2 off-slip - Progressive nearside & offside lane closures
-
4th of July 2025, 8:00pm5th of July 2025, 6:00amM77 NB Jct 1 to M8 Jct 22- Road Closure
-
4th of July 2025, 8:00pm5th of July 2025, 6:00amM8 Westbound Junction 8 off-slip - Progressive nearside & offside lane closures
-
4th of July 2025, 8:00pm5th of July 2025, 6:00amM77 NB Jct 1 onslip from Dumbreck Road - Slip Closure
-
4th of July 2025, 8:00pm5th of July 2025, 6:00amM73 Northbound Junction 2 off-slip - Progressive nearside & offside lane closures
-
4th of July 2025, 8:00pm5th of July 2025, 6:00amM77 NB Link Road to M8 EB Jct 22 - Closure
-
4th of July 2025, 8:00pm5th of July 2025, 6:00amM77 NB Jct 1 to M8 EB sec c/way- Closure
-
4th of July 2025, 8:00pm5th of July 2025, 6:00amA78 SB Inverkip Road/IBM lane Closures
-
4th of July 2025, 8:00pm5th of July 2025, 6:00amA78 NB Inverkip Road/IBM - Lane Closures
-
4th of July 2025, 8:00pm5th of July 2025, 6:00amA77 North Minishant SB- TTL
-
4th of July 2025, 8:00pm5th of July 2025, 6:00amA77 North Minishant NB- TTL
-
4th of July 2025, 8:00pm5th of July 2025, 6:00amA77 Main St Ballantrae SB- TTL
-
4th of July 2025, 8:00pm5th of July 2025, 6:00amA77 Main St Ballantrae NB- TTL
-
4th of July 2025, 8:00pm11th of July 2025, 6:00amM876 - Jct 2 to M9 Jct 8 - EB - ROAD CLOSURE
-
4th of July 2025, 8:00pm11th of July 2025, 6:00amM876 - Jct 2 EB On Slip - EB - ROAD CLOSURE
-
4th of July 2025, 8:30pm5th of July 2025, 6:00amA720 - WB - Millerhill Onslip - Road Closure
-
4th of July 2025, 11:59pm9th of July 2025, 6:00amM8 EB Jct 5 Off-slip. Road Closure.
-
4th of July 2025, 11:59pm9th of July 2025, 6:00amM8 WB Jct 5 Off-slip. Road Closure.
-
4th of July 2025, 11:59pm7th of July 2025, 6:00amM8 WB Jct 5 On-slip. Road Closure.
-
4th of July 2025, 11:59pm7th of July 2025, 6:00amM8 EB Jct 5 On-slip. Road Closure.
-
5th of July 2025, 12:00am10th of July 2025, 6:00amM74 NB J15-J14 - Single Lane Running / Lane Closure
-
5th of July 2025, 12:00am10th of July 2025, 6:00amM74 NB J15-J14 WIDE LOAD LAYBY - Closure
-
5th of July 2025, 1:00pm5th of July 2025, 2:00pmA83 Tarbert - Planned Event Road Closure
-
5th of July 2025, 7:00pm6th of July 2025, 7:00amA85 Dunira St Comrie EB - TTL
-
5th of July 2025, 7:00pm6th of July 2025, 7:00amA85 Dunira St Comrie WB - TTL
-
5th of July 2025, 8:00pm6th of July 2025, 1:00amA90 Dundee- Div signage N/B
-
6th of July 2025, 8:00am6th of July 2025, 2:00pmA726 WB Queensway East Kilbride - Lane Closures
-
6th of July 2025, 8:00am6th of July 2025, 2:00pmA726 EB Queensway East Kilbride - Lane Closures
-
6th of July 2025, 8:00am6th of July 2025, 2:00pmA725 EB Kingsway East Kilbride - Lane Closures
-
6th of July 2025, 8:00am6th of July 2025, 2:00pmA725 WB Kingsway East Kilbride - Lane Closures
-
6th of July 2025, 7:30pm29th of August 2025, 6:30amA90 Rait Junction to Middlebank Farm - Night time Convoy, day time lane closures - N/B
-
6th of July 2025, 7:30pm29th of August 2025, 6:30amA90 Rait Junction to Middlebank Farm - Night time Convoy, day time lane closures - S/B
-
6th of July 2025, 7:30pm18th of July 2025, 6:30amM90 Broxden- Lane Closure N/B
-
6th of July 2025, 7:30pm18th of July 2025, 6:30amM90 Broxden- Lane Closure S/B
-
6th of July 2025, 8:00pm7th of July 2025, 6:00amM8 EB Jct 10 Offslip - Road Part of a Diversion
-
6th of July 2025, 8:00pm7th of July 2025, 6:00amM8 EB - Lane closure - Near to Dechmont
-
6th of July 2025, 8:00pm7th of July 2025, 6:00amA702 NB - TTL's - Candy Mill
-
6th of July 2025, 8:00pm7th of July 2025, 6:00amA702 SB - TTL's - Candy Mill
-
6th of July 2025, 8:00pm9th of July 2025, 6:00amM8 J25 WB on slip - Total closure
-
6th of July 2025, 8:00pm7th of July 2025, 6:00amM8 Eastbound Junction 10 on-slip - Total closure
-
6th of July 2025, 8:00pm7th of July 2025, 6:00amM8 Eastbound Junction 10 main line -Total closure
-
6th of July 2025, 8:00pm7th of July 2025, 6:00amM8 Westbound Junction 7 Main line - Nearside & adjacent lane closure
-
6th of July 2025, 8:00pm7th of July 2025, 6:00amM8 Westbound Junction 7 Eurocentral on-slip - Total closure
-
6th of July 2025, 8:00pm7th of July 2025, 6:00amM8 Westbound to A725 Southbound Link Road - Total closure
-
6th of July 2025, 8:00pm8th of July 2025, 6:00amA82 SB Stoneymollan Rbt to Lomondgate Rbt - Total Closure
-
6th of July 2025, 8:00pm8th of July 2025, 6:00amA82 SB Off Slip to Renton Rd - Total Closure
-
6th of July 2025, 8:00pm8th of July 2025, 6:00amA82 SB On Slip from Renton Rd - Total Closure
-
6th of July 2025, 8:00pm16th of July 2025, 6:00amA82 NB Lomondgate Rbt to Stoneymollan Rbt - Offside Lane Closure
-
6th of July 2025, 10:30pm8th of July 2025, 5:00amA96 Oyne - Signage only- E/B
-
7th of July 2025, 6:00am26th of September 2025, 9:00pmA90 N/B Finavon Overbridge - Contraflow
-
7th of July 2025, 6:00am26th of September 2025, 9:00pmA90 S/B Finavon Overbridge - Contraflow
-
7th of July 2025, 6:00am10th of July 2025, 8:00pmA76 Main St Kirkconnel NB - TTLS
-
7th of July 2025, 6:00am10th of July 2025, 8:00pmA76 Main St Kirkconnel SB - TTLS
-
7th of July 2025, 7:00am7th of August 2025, 7:00pmA889 Dochaid Abhacain Dalwhinnie SB - TTL
-
7th of July 2025, 7:00am7th of August 2025, 7:00pmA889 Dochaid Abhacain Dalwhinnie NB - TTL
-
7th of July 2025, 7:00am10th of July 2025, 6:00pmA9 Lothmore NB - TTL
-
7th of July 2025, 7:00am10th of July 2025, 6:00pmA9 Lothmore SB - TTL
-
7th of July 2025, 7:00am10th of July 2025, 6:00pmA9 Berridale NB - TTL
-
7th of July 2025, 7:00am10th of July 2025, 6:00pmA9 Berridale SB - TTL
-
7th of July 2025, 7:00am11th of July 2025, 7:00pmA830 Ranochan WB - TTL
-
7th of July 2025, 7:00am11th of July 2025, 7:00pmA830 Ranochan EB - TTL
-
7th of July 2025, 7:00am11th of July 2025, 7:00pmA85 Kilmaronaig East of Connel WB - TTL
-
7th of July 2025, 7:00am11th of July 2025, 7:00pmA85 Kilmaronaig East of Connel EB - TTL
-
7th of July 2025, 7:00am11th of July 2025, 7:00pmA85 St Fillans WB - TTL
-
7th of July 2025, 7:00am11th of July 2025, 7:00pmA85 St Fillans EB - TTL
-
7th of July 2025, 7:00am18th of July 2025, 7:00pmA86 Murlaggan East of Roybridge - Convoy Works
-
7th of July 2025, 8:00am9th of July 2025, 6:00pmA1 - SB - Linkshead - Utilities - TTL's
-
7th of July 2025, 8:00am9th of July 2025, 6:00pmA1 - NB - Linkshead - Utilities - TTL's
-
7th of July 2025, 8:00am31st of August 2025, 6:00pmA75 EB at Glenluce - Road Part of Diversion
-
7th of July 2025, 8:00am31st of August 2025, 6:00pmA75 WB at Glenluce - Road Part of Diversion
-
7th of July 2025, 8:00am9th of July 2025, 4:30pmA85 Monzievaird West of Crieff - Stop/Go Works
-
7th of July 2025, 8:00am11th of July 2025, 6:00pmA96 Skares to Huntly WB - Diversion signage for local road closure
-
7th of July 2025, 8:00am9th of July 2025, 4:30pmA85 Lochawe WB - TTL
-
7th of July 2025, 8:00am9th of July 2025, 4:30pmA85 Lochawe EB - TTL
-
7th of July 2025, 8:00am9th of July 2025, 6:00pmA82 Grotaig South of Drumnadrochit SB - TTL
-
7th of July 2025, 8:00am9th of July 2025, 6:00pmA82 Grotaig South of Drumnadrochit NB - TTL
-
7th of July 2025, 8:00am9th of July 2025, 5:00pmA77 SB Maybole Bypass @ Culzean Rbt - Lane Closure
-
7th of July 2025, 8:00am8th of July 2025, 5:30pmA75 EB at the A751 Jct - TTLs
-
7th of July 2025, 8:00am8th of July 2025, 5:30pmA75 WB at the A751 Jct - TTLs
-
7th of July 2025, 8:00am7th of July 2025, 5:00pmA83 Barr Hill North of Tarbert NB - TTL
-
7th of July 2025, 8:00am7th of July 2025, 5:00pmA83 Barr Hill North of Tarbert SB - TTL
-
7th of July 2025, 8:00am11th of July 2025, 6:00pmA77 Dalrymple St SB - Road As Part Of Diversion
-
7th of July 2025, 8:30am19th of September 2025, 4:30pmA75 E/B Springholm - TTLS
-
7th of July 2025, 8:30am19th of September 2025, 4:30pmA75 W/B Springholm TTLS
-
7th of July 2025, 9:00am22nd of August 2025, 5:00pmA76 SB Between Sanquhar & Mennock - Road Part of Diversion
-
7th of July 2025, 9:00am22nd of August 2025, 5:00pmA76 NB Between Sanquhar & Mennock - Road Part of Diversion
-
7th of July 2025, 9:00am10th of July 2025, 5:00pmA75 WB Dumfries - Route part of Diversion
-
7th of July 2025, 9:00am10th of July 2025, 5:00pmA75 EB Dumfries - Route part of Diversion
-
7th of July 2025, 9:00am11th of July 2025, 5:00pmA75 Crocketford WB - TTLS
-
7th of July 2025, 9:00am11th of July 2025, 5:00pmA75 Crocketford EB - TTLS
-
7th of July 2025, 9:30am9th of July 2025, 3:30pmA702 - SB - South of Hillend - Stop/Go
-
7th of July 2025, 9:30am9th of July 2025, 3:30pmA702 - NB - South of Hillend - Stop/Go
-
7th of July 2025, 9:30am9th of July 2025, 3:30pmA702 - SB - Easter Howgate - Stop/Go
-
7th of July 2025, 9:30am9th of July 2025, 3:30pmA702 - NB - Easter Howgate - Stop/Go
-
7th of July 2025, 9:30am9th of July 2025, 3:30pmA702 - SB - North of Silverburn - Stop/Go
-
7th of July 2025, 9:30am9th of July 2025, 3:30pmA702 - NB - North of Silverburn - Stop/Go
-
7th of July 2025, 9:30am9th of July 2025, 3:30pmA702 - SB - South of Silverburn - Stop/Go
-
7th of July 2025, 9:30am9th of July 2025, 3:30pmA702 - NB - South of Silverburn - Stop/Go
-
7th of July 2025, 9:30am9th of July 2025, 3:30pmA702 - SB - Carlops - Stop/Go
-
7th of July 2025, 9:30am9th of July 2025, 3:30pmA702 - NB - Carlops - Stop/Go
-
7th of July 2025, 9:30am9th of July 2025, 3:30pmA702 - SB - Dolphinton - Stop/Go
-
7th of July 2025, 9:30am9th of July 2025, 3:30pmA702 - NB - Dolphinton - Stop/Go
-
7th of July 2025, 9:30am9th of July 2025, 3:30pmA702 - SB - Candymill - Stop/Go
-
7th of July 2025, 9:30am9th of July 2025, 3:30pmA702 - NB - Candymill - Stop/Go
-
7th of July 2025, 9:30am8th of July 2025, 3:30pmA75 The Glen WB- Mobile Lane Closure
-
7th of July 2025, 9:30am9th of July 2025, 3:30pmA702 - SB - South of Biggar - Stop/Go
-
7th of July 2025, 9:30am8th of July 2025, 3:30pmA75 The Glen EB- Mobile Lane Closure
-
7th of July 2025, 9:30am9th of July 2025, 3:30pmA702 - NB - South of Biggar - Stop/Go
-
7th of July 2025, 9:30am8th of July 2025, 3:30pmA75 Collin Bypass WB- Mobile Lane Closure
-
7th of July 2025, 9:30am9th of July 2025, 3:30pmA702 - SB - Coulter - Stop/Go
-
7th of July 2025, 9:30am8th of July 2025, 3:30pmA75 Collin Bypass EB- Mobile Lane Closure
-
7th of July 2025, 9:30am9th of July 2025, 3:30pmA702 - NB - Coulter - Stop/Go
-
7th of July 2025, 9:30am7th of July 2025, 3:30pmA75 WB after Gretna - Advance Signage
-
7th of July 2025, 9:30am7th of July 2025, 3:30pmA75 EB after Gretna - Advance Signage
-
7th of July 2025, 9:30am7th of July 2025, 3:30pmA77 North of Stenna to Mark Ballantrae SB- Stop & Go
-
7th of July 2025, 9:30am7th of July 2025, 3:30pmA77 North of Stenna to Mark Ballantrae NB- Stop & Go
-
7th of July 2025, 9:30am7th of July 2025, 3:30pmA8 Eastbound Showcase off-slip - Total closure
-
7th of July 2025, 9:30am7th of July 2025, 3:30pmA8 Eastbound Showcase on-slip - Total closure
-
7th of July 2025, 9:30am8th of July 2025, 4:00pmA95 Dalvey Farm, North of Cromdale. N/B TTL's
-
7th of July 2025, 9:30am18th of July 2025, 3:30pmA96 Nairn- TTLS W/B
-
7th of July 2025, 9:30am11th of July 2025, 3:30pmA985 WB Rosyth. Portable Traffic Lights.
-
7th of July 2025, 9:30am7th of July 2025, 3:30pmA96 High Street, Elgin WB - Diversion signage for local road closure
-
7th of July 2025, 9:30am11th of July 2025, 3:30pmA985 EB Rosyth. Portable Traffic Lights.
-
7th of July 2025, 9:30am9th of July 2025, 3:30pmA90/B9033 Jct, Nth of Crimond. N/B TTL's
-
7th of July 2025, 9:30am9th of July 2025, 3:30pmA96 Bainshole, Huntly- TTL E/B
-
7th of July 2025, 1:00pm11th of July 2025, 5:00pmA9 Crubenmore to Slochd NB - TTL
-
7th of July 2025, 1:00pm11th of July 2025, 5:00pmA9 Crubenmore to Slochd SB - TTL
-
7th of July 2025, 7:00pm19th of July 2025, 7:00amA82 Bunloit to Grotaig South of Drumnadrochit NB - TTL
-
7th of July 2025, 7:00pm19th of July 2025, 7:00amA82 Bunloit to Grotaig South of Drumnadrochit SB - TTL
-
7th of July 2025, 7:00pm11th of July 2025, 6:00amA76 Marchburn NB -Convoy
-
7th of July 2025, 7:00pm11th of July 2025, 6:00amA76 Marchburn SB - Convoy
-
7th of July 2025, 7:30pm8th of July 2025, 6:00amM80 - NB- Junction 9 Off-Slip - Slip Closure
-
7th of July 2025, 7:30pm8th of July 2025, 6:00amM80 - NB - Junction 9 - Lane Cosure
-
7th of July 2025, 7:30pm12th of July 2025, 6:00amA1 - SB - Dolphingstone - Lane Closure
-
7th of July 2025, 7:30pm12th of July 2025, 6:00amA1 - SB - Dolphingstone Off-slip - Road Closure
-
7th of July 2025, 7:30pm12th of July 2025, 6:00amA1 - SB - Dolphingstone On-slip - Road Closure
-
7th of July 2025, 7:30pm9th of July 2025, 6:30amM90 Kelty- Lane closure N/B
-
7th of July 2025, 7:30pm9th of July 2025, 6:30amM90 Kelty- Lane closure S/B
-
7th of July 2025, 7:30pm8th of July 2025, 5:30amA90 Laurencekirk- Convoy- N/B
-
7th of July 2025, 7:30pm8th of July 2025, 6:30amA92 Kirkcaldy- Lane closure N/B
-
7th of July 2025, 7:30pm8th of July 2025, 6:30amA92 Crossgates- Lane closure N/B
-
7th of July 2025, 7:30pm9th of July 2025, 6:00amM9 WB Jct 8 to 9. Lane Closure.
-
7th of July 2025, 7:30pm9th of July 2025, 6:00amM9 EB Jct 9 to 8. Lane Closure.
-
7th of July 2025, 8:00pm8th of July 2025, 6:00amA835 Garve WB - Road Closure with Amnesties
-
7th of July 2025, 8:00pm8th of July 2025, 6:00amA835 Garve EB - Road Closure with Amnesties
-
7th of July 2025, 8:00pm8th of July 2025, 6:00amM8 EB - Lane Closure - Near to Sighthill
-
7th of July 2025, 8:00pm8th of July 2025, 6:00amM90 SB - Lane Closure - South of Queensferry
-
7th of July 2025, 8:00pm8th of July 2025, 6:00amA8 Westbound Newhouse to Chapelhall Soth Rbt - Total Closure
-
7th of July 2025, 8:00pm8th of July 2025, 6:00amA8 Westbound Newhouse on-slip - Total closure
-
7th of July 2025, 8:00pm8th of July 2025, 6:00amA8 Chapelhall North to Chapelhall South Rbt link road - total closure
-
7th of July 2025, 8:00pm8th of July 2025, 6:00amA8 Northbound Bo'ness South Rbt to Chapelhall South Rbt -total closure
-
7th of July 2025, 8:00pm14th of July 2025, 6:00amA8 E//B Glen Rbt Lane Closure
-
7th of July 2025, 8:00pm8th of July 2025, 6:00amM74 Northbound to M73 Northbound link road - Total closure
-
7th of July 2025, 8:00pm8th of July 2025, 6:00amM73 Southbound off-slip to Daldowie - Total closure
-
7th of July 2025, 8:00pm8th of July 2025, 6:00amA725 Raith Roundabout - Inner ring closure
-
7th of July 2025, 8:00pm14th of July 2025, 6:00amA8 E/B Bogston to Glen Rbt - Total Closure
-
7th of July 2025, 8:00pm8th of July 2025, 6:00amM8 WB On Slip Jct 15 - Slip Closure
-
7th of July 2025, 8:00pm8th of July 2025, 6:00amM8 WB Jct 15 - Lane Closure
-
7th of July 2025, 8:00pm8th of July 2025, 6:00amM8 WB Jct 14 on slip- Route part of diversion
-
7th of July 2025, 8:00pm8th of July 2025, 6:00amA725 NB Blantyre onslip - Total Closure
-
7th of July 2025, 8:00pm8th of July 2025, 6:00amA724 WB Glasgow Rd - TTLS
-
7th of July 2025, 8:00pm8th of July 2025, 6:00amA724 EB Glasgow Rd - TTLS
-
7th of July 2025, 8:00pm8th of July 2025, 6:00amA725 SB Main St onslip - Total Closure
-
7th of July 2025, 8:00pm8th of July 2025, 6:00amA9 Dalwhinnie NB - TTL
-
7th of July 2025, 8:00pm8th of July 2025, 6:00amA9 Dalwhinnie SB - TTL
-
7th of July 2025, 8:00pm18th of July 2025, 6:00amA90 Fraserburgh- TTL S/B
-
7th of July 2025, 8:00pm8th of July 2025, 6:00amM8 EB J30 Craigton off slip - Slip Closure
-
7th of July 2025, 8:00pm8th of July 2025, 6:00amM898 NB Craigton IC to Erskine Bridge - Lane Closure
-
7th of July 2025, 8:00pm8th of July 2025, 6:00amM898 NB off slip to A726 - Slip Closure
-
7th of July 2025, 8:00pm8th of July 2025, 6:00amM898 NB Spectacles on slip - Slip Closure
-
7th of July 2025, 8:00pm8th of July 2025, 6:00amM898 SB Old toll to Jct 30 slips - lane closure
-
7th of July 2025, 8:00pm8th of July 2025, 6:00amM898 SB A726 off slip safety coning
-
7th of July 2025, 8:00pm8th of July 2025, 6:00amM898 SB onslip from A726 Slip Closure
-
7th of July 2025, 8:00pm8th of July 2025, 6:00amM898 EB off slip to M8 Jct 30 Slip Closure
-
7th of July 2025, 8:00pm8th of July 2025, 6:00amM898 WB off slip to M8 Jct 31 Slip Closure
-
7th of July 2025, 8:00pm8th of July 2025, 6:00amM8 WB Jct 30 off slip Slip Closure
-
7th of July 2025, 8:00pm8th of July 2025, 6:00amM74 Jct 3 to Jct 2A NB - Road As Part Of Diversion
-
7th of July 2025, 8:00pm8th of July 2025, 6:00amM74 Jct 3 to Jct 2A SB - Road As Part Of Diversion
-
7th of July 2025, 8:00pm8th of July 2025, 6:00amA75 Carrutherstown SB - TTLS
-
7th of July 2025, 8:00pm8th of July 2025, 6:00amA75 Carrutherstown NB - TTLS
-
7th of July 2025, 8:30pm12th of July 2025, 6:00amM8 - EB - Jct 3 to jct 2 - Road Closure
-
7th of July 2025, 8:30pm12th of July 2025, 6:00amM8 - EB - Jct 3 on slip - Road Closure
-
7th of July 2025, 8:30pm12th of July 2025, 6:00amM8 - EB - Jct 2 off slip - Road Closure
-
7th of July 2025, 8:30pm9th of July 2025, 6:30amA95 Boat of Garten to Inverallan Rbt, Craggan. N/B rolling TTL's
-
7th of July 2025, 8:30pm9th of July 2025, 6:30amA95 Inverallan Rbt, Craggan to Cromdale. N/B rolling TTL's
-
7th of July 2025, 9:00pm11th of July 2025, 5:00amA68 - NB - Ancrum - Temp lights
-
7th of July 2025, 9:00pm11th of July 2025, 5:00amA68 - SB - Ancrum - Temp lights
-
8th of July 2025, 6:00am10th of July 2025, 7:00pmA76 Marchburn NB - TTLS
-
8th of July 2025, 6:00am10th of July 2025, 7:00pmA76 Marchburn SB - TTLS
-
8th of July 2025, 6:00am8th of July 2025, 6:01amA76 Drumlanrig Street, Thornhill NB - No Obsstruction on CW/FW
-
8th of July 2025, 6:00am8th of July 2025, 6:01amA76 Drumlanrig Street, Thornhill SB - No Obsstruction on CW/FW
-
8th of July 2025, 8:00am14th of July 2025, 11:59pmA92 Dock Street E/B - Lane Closure
-
8th of July 2025, 9:00am8th of July 2025, 9:00pmA75 Castle Douglas WB - Road As Part Of Diversion
-
8th of July 2025, 9:00am8th of July 2025, 9:00pmA75 Castle Douglas EB - Road As Part Of Diversion
-
8th of July 2025, 9:30am8th of July 2025, 9:00pmA75 EB Colin to Carrutherstown- Route part of Diversion
-
8th of July 2025, 9:30am8th of July 2025, 9:00pmA75 WB Colin to Carrutherstown- Route part of Diversion
-
8th of July 2025, 9:30am8th of July 2025, 4:00pmA77 Ballantrae NB - TTLS
-
8th of July 2025, 9:30am11th of July 2025, 3:30pmA96 Colpy- TTL N/B
-
8th of July 2025, 9:30am9th of July 2025, 6:00pmA1 NB Lamberton. Lane Closure
-
8th of July 2025, 9:30am10th of July 2025, 3:30pmM77 SB Jct 1 to 4 - HS closures
-
8th of July 2025, 9:30am10th of July 2025, 3:30pmM77 NB Jct 4 to 1 - HS Closure
-
8th of July 2025, 9:30am10th of July 2025, 3:30pmA96 South of Huntly - TTL's
-
8th of July 2025, 9:30am8th of July 2025, 4:00pmA77 Ballantrae SB - TTLS
-
8th of July 2025, 7:00pm21st of July 2025, 6:00amA9 Blackford- Lane closure S/B
-
8th of July 2025, 7:30pm9th of July 2025, 6:30amA92 Blafarg NB - Temporary traffic signals
-
8th of July 2025, 7:30pm9th of July 2025, 6:30amA90 Tealing- Lane closure S/B
-
8th of July 2025, 7:30pm9th of July 2025, 6:30amA90 Gateside- Lane closure S/B
-
8th of July 2025, 8:00pm9th of July 2025, 6:00amA835 Tarvie WB - Road Closure with Amnesties
-
8th of July 2025, 8:00pm9th of July 2025, 6:00amA835 Tarvie EB - Road Closure with Amnesties
-
8th of July 2025, 8:00pm9th of July 2025, 6:00amA898 NB Erskine Bridge off slip to A82 SB - Total closure
-
8th of July 2025, 8:00pm14th of July 2025, 6:00amA898 SB Erskine Bridge onslip from A82 SB - Total closure
-
8th of July 2025, 8:00pm9th of July 2025, 6:00amM898 SB on slip from A726 - Total closure
-
8th of July 2025, 8:00pm9th of July 2025, 6:00amM9 SB - Lane Closure - Near Bridge of Allan
-
8th of July 2025, 8:00pm9th of July 2025, 6:00amM9 SB - Lane closure - Keir Rbt
-
8th of July 2025, 8:00pm14th of July 2025, 6:00amA9 Luncarty SB - Lane Closure
-
8th of July 2025, 8:00pm14th of July 2025, 6:00amA9 Luncarty Onslip SB - Lane Closure
-
8th of July 2025, 8:00pm9th of July 2025, 6:00amM74 Northbound Junction 3a Daldowie on-slip - Total closure
-
8th of July 2025, 8:00pm9th of July 2025, 6:00amA725 Raith Roundabout - Outer ring closure
-
8th of July 2025, 8:00pm9th of July 2025, 6:00amM74 Northbound Junction 5 off-slip - Offside lane closure
-
8th of July 2025, 8:00pm9th of July 2025, 6:00amA8 Westbound Newhouse on-slip - Total closure
-
8th of July 2025, 8:00pm9th of July 2025, 6:00amA725 NB E Kilbride Expy Whirlies to Mavor merge - Road closure
-
8th of July 2025, 8:00pm9th of July 2025, 6:00amA725 NB C154 Stoneymeadow Rd onslip to A725 - Road closure
-
8th of July 2025, 8:00pm9th of July 2025, 6:00amA725 NB Mavor to Whirlies merge -Lane closure
-
8th of July 2025, 8:00pm9th of July 2025, 6:00amA725 NB Whirlies merge to Bothwell bridge - Lane closure
-
8th of July 2025, 8:00pm9th of July 2025, 6:00amA725 NB Hamilton rd off slip - Slip closure
-
8th of July 2025, 8:00pm9th of July 2025, 6:00amA725 NB Douglas st off slip - Slip closure
-
8th of July 2025, 8:00pm9th of July 2025, 6:00amA725 NB Douglas st on slip - Slip closure
-
8th of July 2025, 8:00pm9th of July 2025, 6:00amA725 NB Main St off slip - Slip closure
-
8th of July 2025, 8:00pm9th of July 2025, 6:00amA725 NB Main St on slip - Slip closure
-
8th of July 2025, 8:00pm9th of July 2025, 6:00amA725 NB Glasgow rd on slip - Slip closure
-
8th of July 2025, 8:00pm9th of July 2025, 6:00amA725 NB Craighead off slip - Slip closure
-
8th of July 2025, 8:00pm9th of July 2025, 6:00amA725 NB Craighead on slip - Slip closure
-
8th of July 2025, 8:00pm9th of July 2025, 6:00amM8 EB Jct 14 Off Slip - Total Closure
-
8th of July 2025, 8:00pm9th of July 2025, 6:00amM8 WB Jct 18 Off slip - Total Closure
-
8th of July 2025, 8:00pm9th of July 2025, 6:00amM8 EB Jct 19 Bothwell St Off Slip - Total Closure
-
8th of July 2025, 8:00pm9th of July 2025, 6:00amM8 EB Jct 20 to Jct 18 - Lane Closure
-
8th of July 2025, 8:00pm9th of July 2025, 6:00amA9 Dalnaspidal NB - TTL
-
8th of July 2025, 8:00pm9th of July 2025, 6:00amA9 Dalnaspidal SB - TTL
-
8th of July 2025, 8:00pm9th of July 2025, 6:00amA9 Aldclune Blair Atholl SB - TTL
-
8th of July 2025, 8:00pm9th of July 2025, 6:00amA9 Aldclune Blair Atholl NB - TTL
-
8th of July 2025, 8:00pm9th of July 2025, 6:00amM77 Jct 1 Off Slip NB - Total Closure
-
8th of July 2025, 8:00pm9th of July 2025, 6:00amM77 Jct 2 - 1 NB - Lane Closure
-
8th of July 2025, 8:30pm11th of July 2025, 6:00amA720 - WB - (150) Water of Leith Bridge - Lane Closure
-
8th of July 2025, 8:30pm11th of July 2025, 6:00amA720 - EB - (150) Water of Leith Bridge - Lane Closure
-
9th of July 2025, 6:01am10th of July 2025, 7:59pmA8 E/B Bogston to Glen - Lane Closure
-
9th of July 2025, 6:01am10th of July 2025, 7:59pmA8 W/B Glen Rbt - Gibshill Rd - Lane Closure
-
9th of July 2025, 8:00am11th of July 2025, 6:00pmA77 SB Dalrymple St, Girvan - Road Closure
-
9th of July 2025, 8:00am11th of July 2025, 6:00pmA77 SB Dalrymple St, Girvan - Route part of Diversion
-
9th of July 2025, 8:00am9th of July 2025, 6:00pmA828 Portnacroish North of Appin SB - TTL
-
9th of July 2025, 8:00am9th of July 2025, 6:00pmA828 Portnacroish North of Appin NB - TTL
-
9th of July 2025, 8:00am11th of July 2025, 5:00pmA96 Keith- Stop/Go W/B
-
9th of July 2025, 9:00am11th of July 2025, 4:00pmA77 Ballantrae NB - Mobile Lane Closures
-
9th of July 2025, 9:00am11th of July 2025, 4:00pmA77 Ballantrae SB - Mobile Lane Closures
-
9th of July 2025, 9:30am9th of July 2025, 3:30pmA83 Cumlodden Church Furnace NB - TTL
-
9th of July 2025, 9:30am9th of July 2025, 3:30pmA83 Cumlodden Church Furnace SB - TTL
-
9th of July 2025, 9:30am9th of July 2025, 4:00pmA84 Strathyre NB - TTL
-
9th of July 2025, 9:30am9th of July 2025, 4:00pmA84 Strathyre SB - TTL
-
9th of July 2025, 9:30am15th of July 2025, 3:30pmA977 NB Kincardine. Portable Traffic Lights.
-
9th of July 2025, 9:30am15th of July 2025, 3:30pmA977 SB Kincardine. Portable Traffic Lights.
-
9th of July 2025, 9:30am9th of July 2025, 3:00pmA85 Lochearnhead - Footway Works
-
9th of July 2025, 7:30pm10th of July 2025, 6:30amA90 Brechin- Lane Closure- N/B
-
9th of July 2025, 7:30pm10th of July 2025, 6:30amA90 Brechin- Lane Closure- S/B
-
9th of July 2025, 7:30pm10th of July 2025, 6:30amA92 Glenrothes- Lane closure N/B
-
9th of July 2025, 7:30pm10th of July 2025, 6:30amA92 Glenrothes- Lane closure N/B
-
9th of July 2025, 8:00pm10th of July 2025, 6:00amA77 Glendoune St Girvan SB - TTLS
-
9th of July 2025, 8:00pm10th of July 2025, 6:00amA77 Glendoune St Girvan NB - TTLS
-
9th of July 2025, 8:00pm10th of July 2025, 6:00amM90 NB - Lane closure - Dunfermline area
-
9th of July 2025, 8:00pm10th of July 2025, 6:00amM90 NB - Lane Closure - Near to Dunfermline
-
9th of July 2025, 8:00pm10th of July 2025, 6:00amA8 Eastbound Bargeddie Rbt to Showcase - Total Closure
-
9th of July 2025, 8:00pm11th of July 2025, 6:00amM73 Southbound to M74 Southbound - Total closure
-
9th of July 2025, 8:00pm11th of July 2025, 6:00amA721 on-slip to M74 Southbound - Total closure
-
9th of July 2025, 8:00pm10th of July 2025, 6:00amA725 Raith Underpass - Total closure
-
9th of July 2025, 8:00pm11th of July 2025, 6:00amA92 Chapel Lane Closure S/B
-
9th of July 2025, 8:00pm10th of July 2025, 6:00amA7071 Bothwell lights to Raith rbt - Progressive nearside & offside lane closures
-
9th of July 2025, 8:00pm10th of July 2025, 6:00amA8 Eastbound Baillieston Lights to Swinton Rbt - Progressive nearside & offside lane closures
-
9th of July 2025, 8:00pm10th of July 2025, 6:00amA725 SB Whistleberry to Whirlies slip - Lane Closure
-
9th of July 2025, 8:00pm10th of July 2025, 6:00amA725 SB Whistleberry Rd off slip - Slip Closure
-
9th of July 2025, 8:00pm10th of July 2025, 6:00amA725 SB Glasgow Rd on slip - Slip Closure
-
9th of July 2025, 8:00pm10th of July 2025, 6:00amA725 SB Main Street off slip - Slip Closure
-
9th of July 2025, 8:00pm10th of July 2025, 6:00amA725 SB Main Street on slip - Slip Closure
-
9th of July 2025, 8:00pm10th of July 2025, 6:00amA725 SB Douglas Street off slip - Slip Closure
-
9th of July 2025, 8:00pm10th of July 2025, 6:00amA725 SB Douglas Street on slip - Slip Closure
-
9th of July 2025, 8:00pm10th of July 2025, 6:00amA725 SB East Kilbride Expressway @ Whirlies off slip - Slip Closure
-
9th of July 2025, 8:00pm10th of July 2025, 6:00amA725 SB Whirlies Bypass to Whim Place on slip - Lane Closure
-
9th of July 2025, 8:00pm10th of July 2025, 6:00amM8 WB Jct 16 to Jct 17 - Lane Closures
-
9th of July 2025, 8:00pm10th of July 2025, 6:00amM8 WB Jct 17 to Jct 19 - Total Closure
-
9th of July 2025, 8:00pm10th of July 2025, 6:00amM8 Jct 17 onslip WB - Total Closure
-
9th of July 2025, 8:00pm10th of July 2025, 6:00amM8 WB Jct 19 to Jct 21 - Lane Closures
-
9th of July 2025, 8:00pm18th of July 2025, 6:00amM8 J25A - J25 Eastbound - Lane closure
-
9th of July 2025, 8:00pm15th of July 2025, 6:00amM8 J25 A EB onlip - Total closure
-
9th of July 2025, 8:00pm10th of July 2025, 6:00amM74 WB Jct 3a to Jct 2a - Route Part of a Diversion
-
9th of July 2025, 8:00pm10th of July 2025, 6:00amM74 EB Jct 3a to Jct 2a - Route Part of a Diversion
-
10th of July 2025, 6:30am10th of July 2025, 8:00pmA828 Duror - Stop/Go Works
-
10th of July 2025, 8:00am16th of July 2025, 5:00pmA7 - SB - Mosspaul House Hotel - TTL's - Utilities
-
10th of July 2025, 8:00am16th of July 2025, 5:00pmA7 - NB - Mosspaul House Hotel - TTL's - Utilities
-
10th of July 2025, 8:00am20th of July 2025, 6:00pmA90 Forfar- Diversion signage N/B
-
10th of July 2025, 8:00am10th of July 2025, 6:00pmA828 Dalnatrat South of Duror NB - TTL
-
10th of July 2025, 8:00am10th of July 2025, 6:00pmA828 Dalnatrat South of Duror SB - TTL
-
10th of July 2025, 8:00am10th of July 2025, 5:00pmA75 EB @ Main Street Jct Twynholm- TTLS
-
10th of July 2025, 8:00am10th of July 2025, 5:00pmA75 WB @ Main Street Jct Twynholm- TTLS
-
10th of July 2025, 9:30am10th of July 2025, 3:30pmA8 Westbound Showcase off-slip - Total closure
-
10th of July 2025, 9:30am10th of July 2025, 3:30pmA8 Westbound Showcase on-slip -Total closure
-
10th of July 2025, 11:30am10th of July 2025, 4:00pmA85 Ardchyle West of Lochearnhead - Convoy Works
-
10th of July 2025, 7:00pm11th of July 2025, 7:00amA9 Pitaldonich House of Bruar SB - TTL
-
10th of July 2025, 7:00pm11th of July 2025, 7:00amA9 Pitaldonich House of Bruar NB - TTL
-
10th of July 2025, 8:00pm11th of July 2025, 6:00amA737 Roadhead Rbt NB - TTLS
-
10th of July 2025, 8:00pm11th of July 2025, 6:00amA737 Roadhead Rbt NB - TTLS
-
10th of July 2025, 8:00pm11th of July 2025, 6:00amA737 Onslip From Linclive Int NB - Total Closure
-
10th of July 2025, 8:00pm11th of July 2025, 6:00amA737 Linclive Int NB - Lane Closure
-
10th of July 2025, 8:00pm11th of July 2025, 6:00amM80 SB Prior to Jct 1 - Lane Closure
-
10th of July 2025, 8:00pm11th of July 2025, 6:00amM80 NB Prior to Jct 1 - Lane Closure
-
10th of July 2025, 8:00pm11th of July 2025, 6:00amM876 WB - Lane Closure - Near to Larbert
-
10th of July 2025, 8:00pm11th of July 2025, 6:00amA8 Westbound Eurocentral to Shawhead - Total closure
-
10th of July 2025, 8:00pm11th of July 2025, 6:00amM74 Southbound Junction 5 on-slip - Total closure
-
10th of July 2025, 8:00pm11th of July 2025, 6:00amM73 Southbound to M74 Northbound - total closure
-
10th of July 2025, 8:00pm12th of July 2025, 6:00amA725 Raith Northbound underpass - Progressive nearside & offside lane closures
-
10th of July 2025, 8:00pm12th of July 2025, 6:00amA725 Raith Southbound Underpass - Progressive nearside & offside lane closures
-
10th of July 2025, 8:00pm11th of July 2025, 6:00amA82 NB Erskine to Dunglass - Lane Closures
-
10th of July 2025, 8:00pm11th of July 2025, 6:00amA82 NB off slip to Erskine Bridge - Slip Closure
-
10th of July 2025, 8:00pm11th of July 2025, 6:00amA898 off slip from Erskine Br to A82 NB - Slip Closure
-
10th of July 2025, 8:00pm11th of July 2025, 6:00amA82 NB Old Kilpatrick off slip - Slip Closure
-
10th of July 2025, 8:00pm11th of July 2025, 6:00amA82 NB Old Kilpatrick on slip - Slip Closure
-
10th of July 2025, 8:00pm11th of July 2025, 6:00amA82 SB Great Western Road from Dunglass Rbt to Erskine - Lane Closure
-
10th of July 2025, 8:00pm11th of July 2025, 6:00amA82 SB off slip to Erskine Bridge - Slip Closure
-
10th of July 2025, 8:00pm11th of July 2025, 6:00amA898 SB on slip to A82 SB Slip Closure
-
10th of July 2025, 8:00pm12th of July 2025, 6:00amM8 WB Jct 21 On slip - Total Closure
-
10th of July 2025, 8:00pm12th of July 2025, 6:00amM8 Jct 22 WB - Total Closure
-
10th of July 2025, 9:00pm24th of July 2025, 6:00amA1-NB-North of Thistly Cross Rbt-Road closure
-
10th of July 2025, 10:00pm11th of July 2025, 6:00amA8 EB Rue End St to Ratho St - Road Part of Diversion
-
10th of July 2025, 10:00pm11th of July 2025, 6:00amA8 WB Rue End St to Ratho St - Road Part of Diversion
-
11th of July 2025, 12:01am24th of July 2025, 11:59pmA9 Queen Vic Jct to Greenloaning. Diversion signage for local road closure
-
11th of July 2025, 6:00am21st of July 2025, 6:00amA835 Garve - Vergeworks
-
11th of July 2025, 6:00am15th of July 2025, 7:30pmA1-NB-North of Thistly Cross Rbt- Lane closure
-
11th of July 2025, 9:30am24th of July 2025, 3:30pmA85 Ochtertyre West of Crieff WB - TTL
-
11th of July 2025, 9:30am24th of July 2025, 3:30pmA85 Ochtertyre West of Crieff EB - TTL
-
11th of July 2025, 9:30am11th of July 2025, 3:30pmA702 - SB - Duneatonfoot Bridge to Abington INT - TTL's
-
11th of July 2025, 9:30am11th of July 2025, 3:30pmA702 - NB - Duneatonfoot Bridge to Abington INT - TTL's
-
11th of July 2025, 8:00pm19th of July 2025, 6:00amA8 B/B Cartsburn Rbt - Cartsdyke Rbt - Lane Closure
-
11th of July 2025, 8:00pm12th of July 2025, 6:00amA82 Stirling Rd NB - Lane Closure
-
11th of July 2025, 8:00pm12th of July 2025, 6:00amA82 Dunglass Rbt SB - Lane Closure
-
11th of July 2025, 8:00pm19th of July 2025, 6:00amA8 W/B Cartsdyke Rbt to Cartsburn Rbt - Total Closure
-
11th of July 2025, 8:00pm16th of July 2025, 6:00amA8 WB Cartsburn Rbt - Lane Closure
-
11th of July 2025, 8:00pm11th of August 2025, 6:00amA898/M898 NB Erskine Bridge - Total closure
-
11th of July 2025, 8:00pm19th of July 2025, 6:00amA8 WB Cartsdyke Rbt N/S - Lane Closure
-
11th of July 2025, 8:00pm11th of August 2025, 6:00amA898 NB Erskine Bridge slip to Great Western Road NB - Total closure
-
11th of July 2025, 8:00pm19th of July 2025, 6:00amA8 WB Approach to Cartsdyke Rbt - Lane Closure
-
11th of July 2025, 8:00pm11th of August 2025, 6:00amA898 NB Erskine Bridge slip to Great Western Road SB- Total closure
-
11th of July 2025, 8:00pm11th of August 2025, 6:00amA898 NB on slip to Erskine Bridge- Total closure
-
11th of July 2025, 8:00pm11th of August 2025, 6:00amA898 SB Erskine Bridge - Lane Closure
-
11th of July 2025, 8:00pm12th of July 2025, 6:00amM74 Northbound Junction 5 on-slip - total closure
-
11th of July 2025, 8:00pm12th of July 2025, 6:00amA7071 freeflow to M74 Northbound link road - Total closure
-
11th of July 2025, 8:00pm12th of July 2025, 6:00amM8 WB J11 off slip - Slip Closure
-
11th of July 2025, 8:00pm12th of July 2025, 6:00amM8 WB J12 off slip - Slip Closure
-
11th of July 2025, 8:00pm12th of July 2025, 6:00amM8 WB J13 off slip - Slip Closure
-
11th of July 2025, 8:00pm12th of July 2025, 6:00amM8 WB J12 to J13 - Lane Closure
-
11th of July 2025, 8:00pm12th of July 2025, 6:00amM8 WB J11 on slip - Slip Closure
-
11th of July 2025, 8:00pm12th of July 2025, 6:00amM8 WB J12 on slip - Slip Closure
-
11th of July 2025, 8:00pm11th of July 2025, 8:01pmA8 W/B Cartsdyke Rbt to Cartsburn Rbt - No obstruction on Cway or Fway
-
11th of July 2025, 8:00pm12th of July 2025, 6:00amA8 Westbound Showcase to Bargeddie Ebt - Total closure
-
11th of July 2025, 8:00pm12th of July 2025, 6:00amA8 Westbound Showcase on-slip Total closure
-
11th of July 2025, 8:00pm12th of July 2025, 6:00amM8 EB J13 onslip - Slip Closure
-
11th of July 2025, 8:00pm12th of July 2025, 6:00amM8 EB J13 to J12 - Lane Closure
-
11th of July 2025, 8:00pm12th of July 2025, 6:00amM8 EB J12 off slip - Slip Closure
-
11th of July 2025, 8:00pm12th of July 2025, 6:00amM8 EB J11 off slip - Slip Closure
-
11th of July 2025, 8:00pm12th of July 2025, 6:00amM8 EB J11 on slip - Slip Closure
-
11th of July 2025, 8:00pm12th of July 2025, 6:00amM8 EB J10 off slip - Slip Closure
-
11th of July 2025, 8:00pm12th of July 2025, 6:00amM8 WB J29 off slip to St James IC - Slip Closure
-
11th of July 2025, 8:00pm12th of July 2025, 6:00amM8 WB J29 on slip St James IC - Slip Closure
-
11th of July 2025, 8:00pm11th of August 2025, 6:00amM8 Jct 30 WB off slip to M898 NB - Total Closure
-
11th of July 2025, 8:00pm12th of July 2025, 6:00amM8 WB Jct 24 Off Slip - Total Closure
-
11th of July 2025, 8:00pm12th of July 2025, 6:00amM8 WB Jct 23 to 24 - Lane Closure
-
11th of July 2025, 8:00pm12th of July 2025, 6:00amM74 Jct 6 Off Slip to Hamilton SB - Road As Part Of Diversion
-
11th of July 2025, 8:00pm12th of July 2025, 6:00amM74 Jct 6 On Slip to Hamilton NB - Road As Part Of Diversion
-
11th of July 2025, 8:30pm22nd of July 2025, 6:00amA720 - WB - Sheriffhall to Lasswade - Closure
-
11th of July 2025, 8:30pm22nd of July 2025, 6:00amA720 - WB - Gilmerton Slip - Closure
-
12th of July 2025, 6:00am11th of August 2025, 6:00amA898 SB on slip to Erskine Bridge - Total Closure
-
12th of July 2025, 6:01am14th of July 2025, 7:59pmA8 W/B Cartsdyke Rbt to Cartsburn Rbt - Lane Closure
-
12th of July 2025, 7:30am14th of July 2025, 4:00pmA90 Kingsway, Dundee- Signage only- N/B
-
13th of July 2025, 7:00pm18th of July 2025, 6:00amA82 Glengarry Invergarry NB - Road Closure with Amnesties
-
13th of July 2025, 7:00pm18th of July 2025, 6:00amA82 Glengarry Invergarry SB - Road Closure with Amnesties
-
13th of July 2025, 7:00pm18th of July 2025, 6:00amA830 Kinloch Eil WB - Road Closure with Amnesties
-
13th of July 2025, 7:00pm18th of July 2025, 6:00amA830 Kinloch Eil EB - Road Closure with Amnesties
-
13th of July 2025, 7:30pm25th of July 2025, 6:30amM90 Mawcarse- Lane Closure N/B
-
13th of July 2025, 7:30pm18th of July 2025, 6:30amA96 Cairnie, Huntly- Road Closure S/B
-
13th of July 2025, 7:30pm18th of July 2025, 6:30amA96 Cairnie, Huntly- Road Closure N/B
-
13th of July 2025, 7:30pm8th of August 2025, 3:30pmA96 Ardesier to Drumine Cottage, East of Inverness Airport Rbt. WB Night Road Closure daytime TTL's
-
13th of July 2025, 7:30pm8th of August 2025, 3:30pmA96 Ardesier to Drumine Cottage, East of Inverness Airport Rbt. EB Night Road Closure daytime TTL's
-
13th of July 2025, 8:00pm14th of July 2025, 6:00amA725 SB E Kilbride Expy - Lane Closure
-
13th of July 2025, 8:00pm14th of July 2025, 6:00amA725 NB E Kilbride Expy - Lane Closure
-
13th of July 2025, 8:00pm14th of July 2025, 6:00amA1 NB - Lane closure - Close to Dunbar
-
13th of July 2025, 8:00pm14th of July 2025, 6:00amA1 SB - Lane Closure - Near East Linton
-
13th of July 2025, 8:00pm18th of July 2025, 6:00amTreeswood Rd over A77 - TTLs
-
13th of July 2025, 8:00pm14th of July 2025, 6:00amM8 Westbound Junction 7a to A725 Southbound link road - Total closure
-
13th of July 2025, 8:30pm23rd of August 2025, 6:00amM8 - WB - Jct 3 to Jct 2. Lane Closures
-
13th of July 2025, 8:30pm23rd of August 2025, 6:00amM8 - EB - Jct 2 to Jct 3. Lane Closures
-
14th of July 2025, 7:00am20th of July 2025, 7:00pmA85 Loch Lubhair EB - TTL
-
14th of July 2025, 7:00am20th of July 2025, 7:00pmA85 Loch Lubhair WB - TTL
-
14th of July 2025, 7:00am20th of July 2025, 7:00pmA85 Auchessan East of Crianlarich EB - TTL
-
14th of July 2025, 7:00am20th of July 2025, 7:00pmA85 Auchessan East of Crianlarich WB - TTL
-
14th of July 2025, 7:00am20th of July 2025, 7:00pmA85 Dalkenneth East of Lochearnhead WB - TTL
-
14th of July 2025, 7:00am20th of July 2025, 7:00pmA85 Dalkenneth East of Lochearnhead EB - TTL
-
14th of July 2025, 8:00am25th of July 2025, 5:00pmA702 - SB - Abbington - Verge works
-
14th of July 2025, 8:00am25th of July 2025, 4:00pmA78 Ardrossan Road Seamill Route Part of a DIversion Route
-
14th of July 2025, 8:00am25th of July 2025, 5:00pmA85 Main Street Crieff - Diversion Signage
-
14th of July 2025, 8:00am16th of July 2025, 11:59pmA95 South of Marypark- TTL N/B
-
14th of July 2025, 8:00am18th of July 2025, 7:00pmA7 - SB - Boleside - TTL's - Utilities
-
14th of July 2025, 8:00am18th of July 2025, 7:00pmA7 - NB - Boleside - TTL's - Utilities
-
14th of July 2025, 8:00am18th of July 2025, 7:00pmA68 - NB - B6400 Jct - Utility works diversion - Signage only
-
14th of July 2025, 8:00am18th of July 2025, 7:00pmA68 - SB - B6400 Jct - Utility works diversion - Signage only
-
14th of July 2025, 9:00am25th of July 2025, 5:00pmB7080 SB Carlisle Road - TTLs
-
14th of July 2025, 9:00am25th of July 2025, 5:00pmB7080 NB Carlisle Road - TTLs
-
14th of July 2025, 9:30am18th of July 2025, 3:30pmA702 - NB - Loaningdale Ave to Toffcombes Lodge Biggar - Utilities - TTL's
-
14th of July 2025, 9:30am18th of July 2025, 3:30pmA702 - SB - Toffcombes Lodge to Loaningdale Ave Biggar - Utilities - TTL's
-
14th of July 2025, 9:30am16th of July 2025, 3:30pmA76 SB North of Sanquhar - TTLs
-
14th of July 2025, 9:30am16th of July 2025, 3:30pmA76 NB North of Sanquhar - TTLs
-
14th of July 2025, 9:30am18th of July 2025, 3:30pmA99 Whaligoe South of Ulbster NB - TTL
-
14th of July 2025, 9:30am18th of July 2025, 3:30pmA99 Whaligoe South of Ulbster SB - TTL
-
14th of July 2025, 9:30am23rd of July 2025, 3:30pmA96 Forres- TTLS E/B
-
14th of July 2025, 9:30am25th of July 2025, 3:30pmA8 Eastbound Eurocentral to Newhouse - Progressive nearside & offside lane closures
-
14th of July 2025, 9:30am25th of July 2025, 3:30pmA8 Westbound Newhouse to Eurocentral - Progressive nearside & offside lane closures
-
14th of July 2025, 9:30am14th of July 2025, 3:30pmA83 Furnace NB - TTL
-
14th of July 2025, 9:30am14th of July 2025, 3:30pmA83 Furnace SB - TTL
-
14th of July 2025, 9:30am14th of July 2025, 3:30pmA78 Greenock Rd Largs SB - TTLS
-
14th of July 2025, 9:30am14th of July 2025, 3:30pmA78 Greenock Rd Largs NB - TTLS
-
14th of July 2025, 7:00pm19th of July 2025, 4:00amA9 Clashmore NB - TTL
-
14th of July 2025, 7:00pm19th of July 2025, 4:00amA9 Clashmore SB - TTL
-
14th of July 2025, 7:30pm20th of July 2025, 6:30amA90 Fowlis Junction, Invergowrie. N/B lane 1 closure
-
14th of July 2025, 7:30pm20th of July 2025, 6:30amC12 Fowlis Road, Invergowrie. N/B council road closure
-
14th of July 2025, 7:30pm15th of July 2025, 6:30amA92 Broughty Ferry Road, Dundee NB - Lane closure
-
14th of July 2025, 7:30pm17th of July 2025, 6:30amA96 Brodie- TTL W/B
-
14th of July 2025, 7:30pm19th of July 2025, 6:00amA1 - SB - Bankton - Lane Closure
-
14th of July 2025, 7:30pm19th of July 2025, 6:00amA1 - SB - Bankton Off-slip - Road Closure
-
14th of July 2025, 7:30pm19th of July 2025, 6:00amA1 - SB - Bankton On-slip - Road Closure
-
14th of July 2025, 8:00pm19th of July 2025, 6:00amA92 Balfarg. S/B TTL's
-
14th of July 2025, 8:00pm15th of July 2025, 6:00amM90 SB - Lane closure - Crossgates
-
14th of July 2025, 8:00pm26th of July 2025, 6:00amM8 Eastbound Junction 11 to Junction 10 - Nearside lane closure
-
14th of July 2025, 8:00pm26th of July 2025, 6:00amM8 Eastbound Junction 10 off-slip - Total closure
-
14th of July 2025, 8:00pm17th of July 2025, 7:00amM9 - EB - Newbridge - Hard Shoulder Closure
-
14th of July 2025, 8:00pm17th of July 2025, 6:00amM9 - WB - Newbridge - Hard Shoulder Closure
-
14th of July 2025, 8:00pm19th of July 2025, 6:00amA76 Drumlanrig Street, Thornhill NB - Road Closure
-
14th of July 2025, 8:00pm19th of July 2025, 6:00amA76 Drumlanrig Street, Thornhill SB - Road Closure
-
14th of July 2025, 8:00pm15th of July 2025, 6:00amM74 SB Jct 7 to Jct 8 - Road closure
-
14th of July 2025, 8:00pm15th of July 2025, 6:00amM74 SB Jct 8 off slip - road closure
-
14th of July 2025, 8:00pm15th of July 2025, 6:00amM74 NB Jct 8 to Jct 7 - Road Closure
-
14th of July 2025, 8:00pm15th of July 2025, 6:00amM74 NB Jct 8 on slip - Slip Closure
-
14th of July 2025, 8:00pm15th of July 2025, 6:00amA726 WB Eaglesham Rbt - Inner Lane Closure
-
14th of July 2025, 8:00pm15th of July 2025, 6:00amA725 WB Birniehill Rbt Lane closure
-
14th of July 2025, 8:00pm19th of July 2025, 6:00amM8 J18 EB Off slip to A804 - Total Closure
-
14th of July 2025, 8:00pm19th of July 2025, 6:00amM8 J18 EB off slip to A82 GWR - Total closure
-
14th of July 2025, 8:00pm19th of July 2025, 6:00amM8 J19 - J18 EB - lane closure
-
14th of July 2025, 8:00pm19th of July 2025, 6:00amM8 J19 EB on slip from North Street- Total Closures
-
14th of July 2025, 8:30pm15th of July 2025, 6:00amM8 - EB - Jct 2 on slip - Road closure
-
14th of July 2025, 8:30pm15th of July 2025, 6:00amM8 - EB - Jct 2 to jct 1 - Road closure
-
14th of July 2025, 8:30pm15th of July 2025, 6:00amM8 - EB - Jct 1 off slip - Road closure
-
14th of July 2025, 10:00pm18th of July 2025, 6:00amA96 Inverness- TTLS E/B
-
15th of July 2025, 8:00am18th of July 2025, 5:00pmA7 - SB - North of Langholm - Lane Narrowing
-
15th of July 2025, 8:00am18th of July 2025, 5:00pmA7 - NB - North of Langholm - Lane Narrowing
-
15th of July 2025, 8:00am15th of July 2025, 7:00pmA9 Bankfoot to Ballinluig NB - Diversion Signage
-
15th of July 2025, 8:00am15th of July 2025, 7:00pmA9 Bankfoot to Ballinluig SB - Diversion Signage
-
15th of July 2025, 8:00am17th of July 2025, 6:00pmA75 EB Valleyfield to Ringford - Route part of Diversion
-
15th of July 2025, 8:00am17th of July 2025, 6:00pmA75 WB Valleyfield to Ringford - Route part of Diversion
-
15th of July 2025, 9:30am15th of July 2025, 3:30pmA75 Palnure Dumfries WB- TTL
-
15th of July 2025, 9:30am15th of July 2025, 3:30pmA75 Palnure Dumfries EB- TTL
-
15th of July 2025, 7:00pm18th of July 2025, 5:30amA82 Loch Uangan South of Fort Augustus NB - TTL
-
15th of July 2025, 7:00pm18th of July 2025, 5:30amA82 Loch Uangan South of Fort Augustus SB - TTL
-
15th of July 2025, 8:00pm16th of July 2025, 6:00amA83 North of Erines NB - TTL
-
15th of July 2025, 8:00pm16th of July 2025, 6:00amA83 North of Erines SB - TTL
-
15th of July 2025, 8:00pm18th of July 2025, 6:00amA876 SB Higgins Neuk Rdbt. to Kilbaggie Rdbt - Road Closure
-
15th of July 2025, 8:00pm18th of July 2025, 6:00amA876 NB Higgins Neuk Rdbt. to Kilbaggie Rdbt - Road Closure
-
15th of July 2025, 8:00pm16th of July 2025, 6:00amM8 EB Jct 19 Off slip to Bothwell St - Slip Road Closure
-
15th of July 2025, 8:00pm16th of July 2025, 6:00amM8 EB Jct 19 Link Road from West St - Slip Road Closure
-
15th of July 2025, 8:00pm16th of July 2025, 6:00amM8 WB Jct 19 Onslip from Clydeside Expy - Slip Road Closure
-
15th of July 2025, 8:00pm17th of July 2025, 6:00amM90 - NB - M9 Jct 1a - M90 Jct 1a - Road Closure
-
15th of July 2025, 8:00pm17th of July 2025, 6:00amA90 - NB - Jct 1 -- Road Closure
-
15th of July 2025, 8:00pm17th of July 2025, 6:00amM90 - NB - Jct 1a off slip - Road Closure
-
15th of July 2025, 8:00pm16th of July 2025, 6:00amM74 SB J1a off slip - Slip Closure
-
15th of July 2025, 8:00pm16th of July 2025, 6:00amM74 SB J1a onslip - Slip Closure
-
15th of July 2025, 8:00pm16th of July 2025, 6:00amM74 NB J2 off slip - Slip Closure
-
15th of July 2025, 8:00pm16th of July 2025, 6:00amM74 NB J2 on slip - Slip Closure
-
15th of July 2025, 8:00pm16th of July 2025, 6:00amM74 NB Jct 12 to 11 Total Closure
-
15th of July 2025, 8:00pm16th of July 2025, 6:00amM74 SB Jct 2a off slip Slip Closure
-
15th of July 2025, 8:00pm16th of July 2025, 6:00amM74 SB Jct 2a on slip Slip Closure
-
16th of July 2025, 9:30am16th of July 2025, 3:30pmA835 Contin WB - TTL
-
16th of July 2025, 9:30am16th of July 2025, 3:30pmA835 Contin EB - TTL
-
16th of July 2025, 9:30am16th of July 2025, 3:30pmA1 - NB - Old Craighall to QMU Int - Lane closure
-
16th of July 2025, 9:30am16th of July 2025, 3:30pmA1 - SB - QMU Int to Old Craighall - Lane closure
-
16th of July 2025, 9:30am24th of July 2025, 3:30pmA82 Invermoriston - Vergeworks
-
16th of July 2025, 9:30am24th of July 2025, 3:30pmA887 Invermoriston - Vergeworks
-
16th of July 2025, 7:00pm17th of July 2025, 4:00amA9 Alness NB - TTL
-
16th of July 2025, 7:00pm17th of July 2025, 4:00amA9 Alness SB - TTL
-
16th of July 2025, 8:00pm20th of July 2025, 6:00amA8 EB Dellingburn St - Cartsburn Rbt - Lane Closure
-
16th of July 2025, 8:00pm17th of July 2025, 5:00amA75 EB Dumfries - TTL
-
16th of July 2025, 8:00pm17th of July 2025, 5:00amA75 WB Dumfries - TTL
-
16th of July 2025, 8:00pm17th of July 2025, 6:00amA720 EB - Lane Closure - South Gyle
-
16th of July 2025, 8:00pm19th of July 2025, 6:00amA8 WB Cartsburn Rbt - Lane Closure
-
16th of July 2025, 8:00pm20th of July 2025, 6:00amA8 WB Cartsburn Rbt to Fire station - Total Closure
-
16th of July 2025, 8:00pm17th of July 2025, 6:00amA77 Coodham to Bellfield I/C NB -Total Closure
-
16th of July 2025, 8:00pm17th of July 2025, 6:00amA82 NB Barloan - Total Closure
-
16th of July 2025, 8:00pm17th of July 2025, 6:00amM74 SB Jct 6 combined slip from Motherwell - Slip Closure
-
16th of July 2025, 8:00pm17th of July 2025, 6:00amM74 SB Jct 6 from Motherwell on slip - Slip Closure
-
16th of July 2025, 8:00pm17th of July 2025, 6:00amM74 NB Jct 6 from Motherwell on Slip - -Slip Closure
-
16th of July 2025, 8:00pm17th of July 2025, 6:00amM74 NB Jct 6 off slip - Slip Closure
-
16th of July 2025, 8:00pm17th of July 2025, 6:00amM74 NB Jct 6 off slip to Hamilton - Slip Closure
-
16th of July 2025, 8:00pm17th of July 2025, 6:00amM74 NB Jct 6 off slip to Motherwell - Slip Closure
-
16th of July 2025, 8:00pm17th of July 2025, 6:00amM74 NB Jct 11 on slip Slip Closure
-
16th of July 2025, 8:00pm17th of July 2025, 6:00amM74 NB Jct 10 off slip Slip Closure
-
16th of July 2025, 8:00pm17th of July 2025, 6:00amM74 SB Jct 10 on slip Slip Closure
-
16th of July 2025, 8:00pm17th of July 2025, 6:00amM74 SB Jct 11 off slip - Slip Closure
-
16th of July 2025, 8:00pm17th of July 2025, 6:00amM74 SB J7 off slip - Slip Closure
-
16th of July 2025, 8:00pm17th of July 2025, 6:00amM74 NB J7 on slip - Slip Closure
-
17th of July 2025, 6:00am20th of July 2025, 8:00pmA8 WB Cartsburn Rbt to Fire station - Lane Closure
-
17th of July 2025, 8:00am17th of July 2025, 5:00pmA96 Huntly- Div signage W/B
-
17th of July 2025, 7:00pm23rd of July 2025, 4:00amA82 Rossdhu House South of Luss NB - TTL
-
17th of July 2025, 7:00pm23rd of July 2025, 4:00amA82 Rossdhu House South of Luss SB - TTL
-
17th of July 2025, 8:00pm18th of July 2025, 6:00amM74 NB J3 off slip - Slip Closure
-
17th of July 2025, 8:00pm18th of July 2025, 6:00amM74 SB J3 on slip - Slip Closure
-
17th of July 2025, 8:00pm18th of July 2025, 6:00amA9 Pitlochry NB - Lane Closure
-
17th of July 2025, 8:00pm18th of July 2025, 6:00amA77 SB Bellfield I/C to Coodham -Total Closure
-
17th of July 2025, 8:00pm18th of July 2025, 6:00amM8 EB Jct 26 to Jct 25A - Total Closure
-
17th of July 2025, 8:00pm18th of July 2025, 6:00amM74 Jct 6 On Slip NB from Hamilton - Slip Closure
-
17th of July 2025, 8:00pm18th of July 2025, 6:00amM74 Jct 6 NB from Hamilton to M74 - Slip Closure
-
17th of July 2025, 8:00pm18th of July 2025, 6:00amM74 Jct 6 SB from Hamilton to M74 - Slip Closure
-
17th of July 2025, 8:00pm18th of July 2025, 6:00amM74 Jct 6 Off Slip SB - Slip Closure
-
17th of July 2025, 8:00pm18th of July 2025, 6:00amM74 Jct 6 off slip to Hamilton SB - Slip Closure
-
17th of July 2025, 8:00pm18th of July 2025, 6:00amM74 Jct 6 off slip to Motherwell SB - Slip Closure
-
17th of July 2025, 8:00pm18th of July 2025, 6:00amM74 SB J9 off slip - Slip Closure
-
18th of July 2025, 7:00am21st of July 2025, 6:00pmA83 Campbeltown Rd Tarbert SB - TTL
-
18th of July 2025, 7:00am21st of July 2025, 6:00pmA83 Campbeltown Rd Tarbert NB - TTL
-
18th of July 2025, 8:00pm19th of July 2025, 6:00amM74 NB J10 to J8 - Road Closure
-
18th of July 2025, 8:00pm19th of July 2025, 6:00amM74 NB J10 on slip - Slip Closure
-
18th of July 2025, 8:00pm19th of July 2025, 6:00amM74 NB J8 off slip - Slip Closure
-
18th of July 2025, 8:00pm19th of July 2025, 6:00amM74 SB J8 to J10 - Road Closure
-
18th of July 2025, 8:00pm19th of July 2025, 6:00amM74 SB J8 on slip - Slip Closure
-
18th of July 2025, 8:00pm19th of July 2025, 6:00amM74 SB J9 off slip - Slip Closure
-
18th of July 2025, 8:30pm19th of July 2025, 6:00amM8 - WB - Jct 1 to Jct 2 - Road closure
-
18th of July 2025, 8:30pm19th of July 2025, 6:00amM8 - WB - Jct 1 Sighthill On slip - Slip closure
-
18th of July 2025, 8:30pm19th of July 2025, 6:00amM8 - WB - Jct 2 Off slip - Slip closure
-
19th of July 2025, 8:00am20th of July 2025, 5:00pmA9 Broom of Dalreoch - Diversion signage- N/B
-
19th of July 2025, 6:30pm2nd of August 2025, 7:00pmA85 Comrie - Event Road Closure
-
19th of July 2025, 8:00pm21st of July 2025, 6:00amA830 Loch Eil West of Corpach WB - TTL
-
19th of July 2025, 8:00pm21st of July 2025, 6:00amA830 Loch Eil West of Corpach EB - TTL
-
19th of July 2025, 8:30pm9th of August 2025, 6:00amA720 - WB - Baberton mainline - Road Closure
-
19th of July 2025, 8:30pm9th of August 2025, 6:00amA720 - WB - Dreghorn onslip - Road Closure
-
19th of July 2025, 8:30pm9th of August 2025, 6:00amA720 - WB - Baberton off slip - Road Closure
-
19th of July 2025, 8:30pm9th of August 2025, 6:00amA720 - WB - Calder off slip - Road Closure
-
19th of July 2025, 8:30pm9th of August 2025, 6:00amA720 - WB - Hermiston off slip - Road Closure
-
19th of July 2025, 10:00pm22nd of July 2025, 6:00amA85 Cruachan EB - TTL
-
19th of July 2025, 10:00pm22nd of July 2025, 6:00amA85 Cruachan WB - TTL
-
20th of July 2025, 7:00am23rd of July 2025, 6:00pmA85 Airds Bay Taynuilt EB - TTL
-
20th of July 2025, 7:00am23rd of July 2025, 6:00pmA85 Airds Bay Taynuilt WB - TTL
-
20th of July 2025, 9:30am20th of July 2025, 3:30pmA77 NB Holmston Rbt Ayr - TTL
-
20th of July 2025, 9:30am20th of July 2025, 3:30pmA77 Holmston Rbt Ayr SB - TTL
-
20th of July 2025, 9:30am20th of July 2025, 3:30pmA77 Holmston Rbt SB Ayr - Lane Closure
-
20th of July 2025, 7:00pm25th of July 2025, 7:00amA82 Glen Orchy Junction South of Bridge of Orchy NB - Road Closure with Amnesties
-
20th of July 2025, 7:00pm25th of July 2025, 7:00amA82 Glen Orchy Junction South of Bridge of Orchy NB - Road Closure with Amnesties
-
20th of July 2025, 7:00pm8th of August 2025, 7:00amA82 Altura South of Letterfindlay NB - TTL
-
20th of July 2025, 7:00pm8th of August 2025, 7:00amA82 Altura South of Letterfindlay SB - TTL
-
20th of July 2025, 7:30pm8th of August 2025, 6:30amM90 Bridge of Earn- Lane Closure N/B
-
20th of July 2025, 7:30pm8th of August 2025, 6:30amM90 Bridge of Earn- Lane Closure S/B
-
20th of July 2025, 7:30pm8th of August 2025, 6:30amM90 Craigend- Lane Closure N/B
-
20th of July 2025, 7:30pm8th of August 2025, 6:30amM90 Craigend- Lane Closure S/B
-
20th of July 2025, 8:00pm26th of July 2025, 6:00amA737 NB Johnstone to Linwood - Total Closure
-
20th of July 2025, 8:00pm26th of July 2025, 6:00amA737 NB Onslip from Johnstone - Total Closure
-
20th of July 2025, 8:00pm26th of July 2025, 6:00amA737 NB offslip to Linwood - Total Closure
-
20th of July 2025, 8:00pm26th of July 2025, 6:00amA737 NB Kilbarchan to Johnstone - Lane Closure
-
20th of July 2025, 10:30pm24th of July 2025, 5:00amA96 Blackburn- Signage only- W/B
-
21st of July 2025, 12:01am23rd of July 2025, 11:59pmA92 Newport-on-Tay- Diversion signage S/B
-
21st of July 2025, 7:00am22nd of July 2025, 7:00pmA86 Craigbeg Moy - Convoy Works
-
21st of July 2025, 7:00am22nd of August 2025, 7:00pmA85 Lix Toll WB - TTL
-
21st of July 2025, 7:00am22nd of August 2025, 7:00pmA85 Lix Toll EB - TTL
-
21st of July 2025, 7:00am25th of July 2025, 7:00pmA85 Crianlarich WB - TTL
-
21st of July 2025, 7:00am25th of July 2025, 7:00pmA85 Crianlarich EB - TTL
-
21st of July 2025, 7:00am24th of July 2025, 6:00pmA85 Falls of Cruachan West of Lochawe EB -TTL
-
21st of July 2025, 7:00am24th of July 2025, 6:00pmA85 Falls of Cruachan West of Lochawe WB -TTL
-
21st of July 2025, 7:00am25th of July 2025, 7:00pmA85 Rose Cottage Lochearnhead WB - TTL
-
21st of July 2025, 7:00am25th of July 2025, 7:00pmA85 Rose Cottage Lochearnhead EB - TTL
-
21st of July 2025, 8:00am21st of July 2025, 5:00pmA68 - SB - Pathhead to Fala Dam - Utilities - TTL's
-
21st of July 2025, 8:00am21st of July 2025, 5:00pmA68 - NB - Fala Dam to Pathhead - Utilities - TTL's
-
21st of July 2025, 8:00am26th of July 2025, 6:00pmA82 North Rd to Lochy Bridge Fort William NB - Rolling TTL
-
21st of July 2025, 8:00am26th of July 2025, 6:00pmA82 North Rd to Lochy Bridge Fort William SB - Rolling TTL
-
21st of July 2025, 8:00am26th of July 2025, 6:00pmA830 Lochy Bridge Fort William WB - Rolling TTL
-
21st of July 2025, 8:00am26th of July 2025, 6:00pmA830 Lochy Bridge Fort William EB - Rolling TTL
-
21st of July 2025, 8:00am30th of July 2025, 6:00pmA9 Bankfoot to Ballinluig NB - Diversion Signage
-
21st of July 2025, 8:00am30th of July 2025, 6:00pmA9 Bankfoot to Ballinluig SB - Diversion Signage
-
21st of July 2025, 8:00am22nd of July 2025, 4:30pmA828 Rosebank North of Appin - Convoy Works
-
21st of July 2025, 9:30am22nd of August 2025, 3:30pmA92 Preston Roundabout NB - Lane closure
-
21st of July 2025, 9:30am22nd of August 2025, 3:30pmA92 Preston Roundabout SB - Lane closure
-
21st of July 2025, 9:30am25th of July 2025, 11:59pmA738 SB Stevenston Rd, Kilwinning - TTL's
-
21st of July 2025, 9:30am25th of July 2025, 11:59pmA738 NB Stevenston Rd, Kilwinning - TTL's
-
21st of July 2025, 7:00pm2nd of August 2025, 7:00amA9 Ralia NB - TTL
-
21st of July 2025, 7:00pm2nd of August 2025, 7:00amA9 Ralia SB - TTL
-
21st of July 2025, 7:00pm23rd of July 2025, 6:00amA77 Carleton Fishery NB - TTL's
-
21st of July 2025, 7:00pm23rd of July 2025, 6:00amA77 Carleton Fishery SB - TTL's
-
21st of July 2025, 7:00pm20th of December 2025, 6:00amA9 Cromarty Bridge - Convoy Works
-
21st of July 2025, 7:30pm25th of July 2025, 6:30amA9 Cairney Braes, Broom of Dalreoch- Lane Closure S/B
-
21st of July 2025, 7:30pm26th of July 2025, 6:00amA1 - SB - Gladsmuir - Lane Closure
-
21st of July 2025, 7:30pm26th of July 2025, 6:00amA1 - SB - Gladsmuir Off-slip - Road Closure
-
21st of July 2025, 7:30pm26th of July 2025, 6:00amA1 - SB - Gladsmuir On-slip - Road Closure
-
21st of July 2025, 8:00pm24th of July 2025, 6:00amM77 NB Jct 5 - 4 - Total closure
-
21st of July 2025, 8:00pm24th of July 2025, 6:00amM77 NB Jct 5 onslip - Total closure
-
21st of July 2025, 8:00pm24th of July 2025, 6:00amM77 NB Jct 6-5 - Lane Closure
-
21st of July 2025, 8:00pm22nd of July 2025, 6:00amM74 SB J2 off slip - Slip Closure
-
21st of July 2025, 8:00pm22nd of July 2025, 6:00amM74 SB J2 on slip - Slip Closure
-
21st of July 2025, 8:00pm22nd of July 2025, 6:00amM74 NB J1a off slip - Slip Closure
-
21st of July 2025, 8:00pm22nd of July 2025, 6:00amM74 NB J1a on slip - Slip Closure
-
21st of July 2025, 8:00pm22nd of July 2025, 6:00amM74 NB J2a on slip - Slip Closure
-
21st of July 2025, 8:00pm22nd of July 2025, 6:00amM74 NB 2a off slip - Slip Closure
-
21st of July 2025, 8:00pm22nd of July 2025, 6:00amM74 NB J1 off slip - Slip Closure
-
21st of July 2025, 8:00pm22nd of July 2025, 6:00amM74 SB J1 on slip - Slip Closure
-
21st of July 2025, 8:00pm22nd of July 2025, 6:00amM8 Kingston Br EB- Lane 1 closure
-
21st of July 2025, 8:00pm26th of July 2025, 6:00amB789 SB Barrochan Rd - Lane Closure
-
21st of July 2025, 8:00pm24th of July 2025, 6:00amA78 Irvine Rd, West Kilbride NB - TTLS
-
21st of July 2025, 8:00pm24th of July 2025, 6:00amA78 Irvine Rd, West Kilbride SB - TTLS
-
21st of July 2025, 10:00pm22nd of July 2025, 6:00amM9 - EB - Jct 1 - Off slips - Alternate lane closures
-
21st of July 2025, 10:00pm22nd of July 2025, 6:00amM9 - EB - Jct 1 - Off slips - Alternate lane closures
-
21st of July 2025, 10:00pm22nd of July 2025, 6:00amM9 - WB - Jct 1 - Off slip - Alternate lane closures
-
21st of July 2025, 10:00pm22nd of July 2025, 6:00amM8 Woodside - M8 WB Jct 16 to 18 (WBIS 14) - Total Closure
-
22nd of July 2025, 9:30am22nd of July 2025, 3:30pmA76 Blackwood Auldgirth SB- TTL
-
22nd of July 2025, 9:30am22nd of July 2025, 3:30pmA76 Blackwood Auldgirth NB- TTL
-
22nd of July 2025, 10:45am22nd of July 2025, 11:15amA83 Inveraray - Event Road Closure
-
22nd of July 2025, 7:00pm16th of August 2025, 5:00amA85 Lochan Lairig Chelle Glenogle WB - Road Closure with Amnesties
-
22nd of July 2025, 7:00pm16th of August 2025, 5:00amA85 Lochan Lairig Chelle Glenogle EB - Road Closure with Amnesties
-
22nd of July 2025, 7:00pm9th of August 2025, 5:00amA83 Barfad Brae Tarbert SB - Road Closure with Amnesties
-
22nd of July 2025, 7:00pm9th of August 2025, 5:00amA83 Barfad Brae Tarbert NB - Road Closure with Amnesties
-
22nd of July 2025, 7:30pm23rd of July 2025, 6:30amM90 Broxden,B9112- Lane Closure S/B
-
22nd of July 2025, 7:30pm23rd of July 2025, 6:30amM90 Broxden,B9112- Lane Closure N/B
-
22nd of July 2025, 7:30pm24th of July 2025, 6:30amM90 Broxden -Lane Closure S/B
-
22nd of July 2025, 7:30pm24th of July 2025, 6:30amM90 Broxden- Lane Closure S/B
-
22nd of July 2025, 7:30pm24th of July 2025, 6:30amM90 Broxden- Lane Closure N/B
-
22nd of July 2025, 8:00pm23rd of July 2025, 6:00amM8 EB Approach to Kingston Br - Lane Closures
-
22nd of July 2025, 8:00pm23rd of July 2025, 6:00amM8 WB on to Kingston Br - Lane Closure
-
22nd of July 2025, 8:00pm23rd of July 2025, 6:00amM74 SB J1 off slip - Lane Closure
-
22nd of July 2025, 8:00pm23rd of July 2025, 6:00amM8 Hillington Rbt inner - lane closure
-
22nd of July 2025, 8:00pm23rd of July 2025, 6:00amM74 Jct 1 SB-Lane 2 closure
-
22nd of July 2025, 8:00pm23rd of July 2025, 6:00amM74 Jct 1 NB-Lane 2 closure
-
22nd of July 2025, 8:00pm23rd of July 2025, 6:00amA725 Southbound Shawhead to Bellziehill - Total closure
-
22nd of July 2025, 8:00pm23rd of July 2025, 6:00amM8 Westbound to A725 Southbound link road - Total closure
-
22nd of July 2025, 8:00pm23rd of July 2025, 6:00amA725 Southbound Diamond on-slip - Total closure
-
22nd of July 2025, 8:30pm26th of July 2025, 6:00amA720 - WB - Lothianburn WB Onslip - Road Closure
-
22nd of July 2025, 8:30pm26th of July 2025, 6:00amA720 - WB - Lothianburn Mainline - Road Closure
-
23rd of July 2025, 8:00am23rd of July 2025, 4:30pmA83 Argyll Hotel Bellochantuy - Convoy Works
-
23rd of July 2025, 8:00am23rd of July 2025, 4:00pmA828 Barcaldine NB - TTL
-
23rd of July 2025, 8:00am23rd of July 2025, 4:00pmA828 Barcaldine SB - TTL
-
23rd of July 2025, 9:30am23rd of July 2025, 3:30pmA85 Methven EB - TTL
-
23rd of July 2025, 9:30am23rd of July 2025, 3:30pmA85 Methven WB - TTL
-
23rd of July 2025, 9:30am23rd of July 2025, 3:30pmA76 Glenarlie to Enterkinfoot SB- TTL
-
23rd of July 2025, 9:30am23rd of July 2025, 3:30pmA76 Glenarlie to Enterkinfoot NB- TTL
-
23rd of July 2025, 7:00pm26th of July 2025, 6:00amA9 Layby 60 North of Calvine - Convoy Works
-
23rd of July 2025, 7:00pm25th of July 2025, 6:00amA830 Collie Chreag East of Ranochan WB - Road Closure with Amnesties
-
23rd of July 2025, 7:00pm25th of July 2025, 6:00amA830 Collie Chreag East of Ranochan EB - Road Closure with Amnesties
-
23rd of July 2025, 7:00pm25th of July 2025, 7:00amA82 Inverarnan NB - TTL
-
23rd of July 2025, 7:00pm25th of July 2025, 7:00amA82 Inverarnan SB - TTL
-
23rd of July 2025, 7:30pm24th of July 2025, 6:30amM90 Broxden Lane Closure S/B
-
23rd of July 2025, 7:30pm25th of July 2025, 6:30amM90 Broxden- Lane Closure S/B
-
23rd of July 2025, 7:30pm25th of July 2025, 6:30amM90 Broxden- Lane Closure N/B
-
23rd of July 2025, 7:30pm25th of July 2025, 6:30amM90 Broxden- lane Closure N/B
-
23rd of July 2025, 7:30pm30th of July 2025, 6:00amA702 - SB - Hillend Junction to Easter Howgate - Road Closure
-
23rd of July 2025, 8:00pm24th of July 2025, 6:00amM8 Jct 18 Off Slip WB - Slip Closure
-
23rd of July 2025, 8:00pm24th of July 2025, 6:00amM8 Jct 16 to Jct 18 WB - Lane Closure
-
23rd of July 2025, 8:00pm24th of July 2025, 6:00amA725 Southbound Bellziehill to Raith Main line - Total closure
-
23rd of July 2025, 8:00pm24th of July 2025, 6:00amA725 Southbound Bellziehill on-slip - Total closure
-
23rd of July 2025, 8:00pm24th of July 2025, 6:00amA725 Southbound Orbiston on-slip - Total closure
-
23rd of July 2025, 8:00pm24th of July 2025, 6:00amA725 Southbound Raith off-slip - Total closure
-
23rd of July 2025, 8:30pm30th of July 2025, 6:00amM8 - EB - Jct 4 on slip - Closure
-
23rd of July 2025, 8:30pm30th of July 2025, 6:00amM8 - WB - Jct 3a on slip - Closure
-
23rd of July 2025, 8:30pm30th of July 2025, 6:00amM8 - EB - Jct 4 to 3A - Closure
-
23rd of July 2025, 8:30pm30th of July 2025, 6:00amM8 - WB - Jct 3a to Jct 4 - Closure
-
23rd of July 2025, 10:00pm24th of July 2025, 6:00amA737 NB Highfield - Route part of Diversion
-
23rd of July 2025, 10:00pm24th of July 2025, 6:00amA737 SB Highfield - Route part of Diversion
-
24th of July 2025, 8:00am24th of July 2025, 4:30pmA83 North Lodge Clachan - Convoy Works
-
24th of July 2025, 8:00am1st of August 2025, 6:00pmA90 Glendoick Signage S/B
-
24th of July 2025, 7:00pm26th of July 2025, 6:00amA9 Layby 66 Drumochter NB - Convoy Works
-
24th of July 2025, 7:30pm30th of July 2025, 6:00amA702 - NB - Easter Howgate to Hillend Junction - Road Closure
-
24th of July 2025, 8:00pm25th of July 2025, 6:00amA725 Northbound Main line Raith to Bellziehill - Total closure
-
24th of July 2025, 8:00pm25th of July 2025, 6:00amA725 Northbound Raith on-slip - Total closure
-
24th of July 2025, 8:00pm25th of July 2025, 6:00amA725 Northbound Orbiston on-slip - Total clousre
-
24th of July 2025, 8:00pm25th of July 2025, 6:00amA725 Northbound Bellziehill off-slip - Total closure
-
25th of July 2025, 10:00am25th of July 2025, 11:30amA702 - SB - Roman Road Cottages - Utilities - TTL's
-
25th of July 2025, 10:00am25th of July 2025, 11:30amA702 - NB - Roman Road Cottages - Utilities - TTL's
-
25th of July 2025, 7:00pm26th of July 2025, 7:00amM74 NB Jct 8 Off slip - Lane Closure
-
25th of July 2025, 8:00pm26th of July 2025, 6:00amA725 Northbound Bellziehill on-slip - Total closure
-
25th of July 2025, 8:00pm26th of July 2025, 6:00amA725 Strathclyde Buisness Park on-slip - Total closure
-
25th of July 2025, 8:00pm26th of July 2025, 6:00amA725 Northbound Bellziehill to Shawhead main line - total closure
-
25th of July 2025, 8:01pm26th of July 2025, 6:00amM9 - EB - Junction 3 to 4 - Road Closure
-
26th of July 2025, 6:01am4th of September 2025, 8:00pmM9 - EB - Junction 3 to 4- Contraflow
-
26th of July 2025, 6:01am4th of September 2025, 8:00pmM9 - WB - Junction 4 to 3 Contraflow
-
26th of July 2025, 1:00pm26th of July 2025, 1:30pmA85 Lochearnhead - Event Road Closure
-
26th of July 2025, 8:00pm25th of August 2025, 6:00amA898 NB Erskine Bridge - Lane Closure
-
26th of July 2025, 8:00pm25th of August 2025, 6:00amA898 SB Erskine Bridge - Lane Closure
-
27th of July 2025, 9:30am27th of July 2025, 3:30pmA77 Glengall Souh Ayrshire SB- TTL
-
27th of July 2025, 9:30am27th of July 2025, 3:30pmA77 Glengall South Ayrshire NB- TTL
-
27th of July 2025, 7:00pm30th of July 2025, 6:00amA86 Inverpattack Lodge Kinloch Laggan WB - Road Closure with Amnesties
-
27th of July 2025, 7:00pm30th of July 2025, 6:00amA86 Inverpattack Lodge Kinloch Laggan EB - Road Closure with Amnesties
-
28th of July 2025, 7:00am29th of July 2025, 7:00pmA9 Stafford Street Helmsdale - Stop/Go Works
-
28th of July 2025, 7:00am1st of August 2025, 7:00pmA85 St Fillans WB - TTL
-
28th of July 2025, 7:00am1st of August 2025, 7:00pmA85 St Fillans EB - TTL
-
28th of July 2025, 7:00am28th of September 2025, 7:00pmA835 Inchbae WB - TTL
-
28th of July 2025, 7:00am28th of September 2025, 7:00pmA835 Inchbae EB - TTL
-
28th of July 2025, 7:00am13th of February 2026, 5:00pmA85 Drummond Arms Crieff - Footway Closure
-
28th of July 2025, 8:00am4th of August 2025, 6:00pmA9 Bankfoot to Ballinluig SB - Diversion Signage
-
28th of July 2025, 8:00am15th of August 2025, 6:00pmA85 Crianlarich EB - TTL
-
28th of July 2025, 8:00am15th of August 2025, 6:00pmA85 Crianlarich WB - TTL
-
28th of July 2025, 8:00am4th of August 2025, 6:00pmA9 Bankfoot to Ballinluig NB - Diversion Signage
-
28th of July 2025, 9:00am15th of September 2025, 4:00pmA7 SB Selkirk, Ettrick Terrace. Portable Traffic Lights.
-
28th of July 2025, 9:00am15th of September 2025, 4:00pmA7 NB Selkirk, Ettrick Terrace. Portable Traffic Lights.
-
28th of July 2025, 9:00am31st of July 2025, 4:00pmA9 Skelbo to Balvaid North of Dornoch - Stop/Go Works
-
28th of July 2025, 9:30am8th of August 2025, 3:30pmA85 Crieff to Quoig West of Crieff - Diversion Signage
-
28th of July 2025, 9:30am29th of July 2025, 3:30pmA96 West Rd Elgin- TTL W/B
-
28th of July 2025, 7:30pm2nd of August 2025, 6:00amA1 - SB - Oaktree - Lane Closure
-
28th of July 2025, 7:30pm2nd of August 2025, 6:00amA1 - SB - Oaktree Off-slip - Road Closure
-
28th of July 2025, 7:30pm2nd of August 2025, 6:00amA1 - SB - Oaktree On-slip - Road Closure
-
28th of July 2025, 8:00pm29th of July 2025, 6:00amA1 - SB - Old Cambus - Convoy
-
28th of July 2025, 8:00pm1st of August 2025, 6:00amM74 SB Jct 6 - 7 Road Part of a Diversion Route
-
28th of July 2025, 8:00pm1st of August 2025, 6:00amM74 NB Jct 7 - 6 Road Part of a Diversion Route
-
28th of July 2025, 8:00pm30th of July 2025, 6:00amA8 E/B Langbank to West Ferry M8 EB Through Jct 31 - Total Closure
-
28th of July 2025, 8:00pm30th of July 2025, 6:00amA8 E/B off to West Ferry - Total Closure
-
28th of July 2025, 8:00pm30th of July 2025, 6:00amA8 Greenock Road Langbank Rbt - Outer Ring Lane Closure
-
28th of July 2025, 8:00pm29th of July 2025, 6:00amA725 Northbound North road - Total closure
-
28th of July 2025, 8:00pm29th of July 2025, 6:00amA8 Westbound Shawhead off-slip - Total closure
-
28th of July 2025, 8:00pm29th of July 2025, 6:00amA8 Eastbound Shawhead Off-slip - Total closure
-
28th of July 2025, 8:00pm29th of July 2025, 6:00amA725 Southbound at Hagmill Road - Total closure
-
28th of July 2025, 8:00pm29th of July 2025, 6:00amB7070 North Road Northbound - Total closure
-
28th of July 2025, 8:00pm1st of August 2025, 6:00amM74 Southbound Junction 5 main line - Nearside & Adjacent lane closure
-
28th of July 2025, 8:00pm1st of August 2025, 6:00amM74 Southbound Junction 5 off-slip - Total closure
-
28th of July 2025, 8:00pm1st of August 2025, 6:00amA725 Raith roundabout - Outer ring closure
-
28th of July 2025, 8:00pm30th of July 2025, 6:00amM8 Jct 12 to Jct 15 WB - Total Closure
-
28th of July 2025, 8:00pm30th of July 2025, 6:00amM8 Jct 12 WB On Slip - Total Closure
-
28th of July 2025, 8:00pm30th of July 2025, 6:00amM8 Jct 13 WB Off Slip - Total Closure
-
28th of July 2025, 8:00pm30th of July 2025, 6:00amM80 Jct 1 to M8 SB - Total Closure
-
28th of July 2025, 8:00pm30th of July 2025, 6:00amM8 Jct 14 on slip WB- Total Closure
-
28th of July 2025, 8:00pm30th of July 2025, 6:00amM8 Jct 15 off slip Stirling rd WB- Total Closure
-
28th of July 2025, 8:00pm30th of July 2025, 6:00amM8 Jct 15 off slip to Castle St WB- Slip Road Closure
-
28th of July 2025, 8:00pm29th of July 2025, 6:00amA1 - NB - Old Cambus - Convoy
-
29th of July 2025, 6:00am31st of July 2025, 7:30pmA7-NB-South of Hawick to Parkdaill-TTLs
-
29th of July 2025, 6:01am8th of August 2025, 8:00pmA1 - NB - Old Cambus - Temp Lights
-
29th of July 2025, 6:01am8th of August 2025, 8:00pmA1 - SB - old Cambus - Temp Lights
-
29th of July 2025, 8:00am1st of August 2025, 6:00pmA90 Glendoick- Div sigange S/B
-
29th of July 2025, 8:00am11th of August 2025, 5:00pmA9 Dunblane- Div signage S/B
-
29th of July 2025, 8:00am11th of August 2025, 5:00pmA9 Dunblane- Div signage N/B
-
29th of July 2025, 8:00am1st of August 2025, 5:00pmA90 Glendoick- Signage only N/B
-
29th of July 2025, 9:30am29th of July 2025, 3:30pmA75 EB at Lochfoot - TTLs
-
29th of July 2025, 9:30am29th of July 2025, 3:30pmA75 WB at Lochfoot - TTLs
-
29th of July 2025, 9:30am29th of July 2025, 4:00pmA76 Auchinleck SB - TTLS
-
29th of July 2025, 9:30am29th of July 2025, 4:00pmA76 Auchinleck NB - TTLS
-
29th of July 2025, 10:00am29th of July 2025, 11:30amA77 SB Between Alloway & Minishant - Road Part of Diversion
-
29th of July 2025, 10:00am29th of July 2025, 11:30amA77 NB Between Alloway & Minishant - Road Part of Diversion
-
29th of July 2025, 7:30pm1st of August 2025, 6:00amA7-NB-South of Hawick-Road closure
-
29th of July 2025, 7:30pm1st of August 2025, 6:00amA7-SB-South of Hawick-Road closure
-
29th of July 2025, 7:30pm15th of August 2025, 6:00amA7 - NB - North of Linhope - Road closure
-
29th of July 2025, 7:30pm15th of August 2025, 6:00amA7 - SB - North of Linhope - Road closure
-
29th of July 2025, 9:25pm1st of August 2025, 5:15amA85 Bridge of Awe EB - TTL
-
29th of July 2025, 9:25pm1st of August 2025, 5:15amA85 Bridge of Awe WB - TTL
-
30th of July 2025, 6:00am31st of July 2025, 7:30pmA7-SB-South of Hawick to Parkdaill-TTLs
-
30th of July 2025, 6:00am5th of August 2025, 7:30pmA7 - NB - North of Linhope - TTLs
-
30th of July 2025, 6:00am5th of August 2025, 7:30pmA7 - SB - North of Linhope - TTLs
-
30th of July 2025, 7:00pm13th of August 2025, 6:00amM9 - EB - Jct 7 - Hard Shoulder Closure
-
30th of July 2025, 7:00pm13th of August 2025, 6:00amM876 - EB - Jct 7 - Slip Road Lane Closure
-
30th of July 2025, 7:00pm6th of August 2025, 6:00amA86 Kinloch Laggan WB - Road Closure with Amnesties
-
30th of July 2025, 7:00pm6th of August 2025, 6:00amA86 Kinloch Laggan EB - Road Closure with Amnesties
-
30th of July 2025, 8:00pm2nd of August 2025, 6:00amA82 SB Between Stoneymollan & Lomondgate Rbts - Total Closure
-
30th of July 2025, 8:00pm31st of July 2025, 6:00amM9 - Jct1a to Jct1b - Hard shoulder closure - Inspection
-
30th of July 2025, 8:00pm31st of July 2025, 6:00amM9 - Jct1b to Jct1a - Hard shoulder closure - Inspection
-
30th of July 2025, 8:00pm31st of July 2025, 6:00amM8 Jct 16 to Jct 19 WB - Total Closure
-
30th of July 2025, 8:00pm31st of July 2025, 6:00amM8 Jct 18 Off Slip WB- Slip Road Closure
-
30th of July 2025, 8:00pm31st of July 2025, 6:00amM8 Jct 17 On Slip WB - Total Closure
-
30th of July 2025, 8:00pm31st of July 2025, 6:00amM9 Jct 19 off slip WB- Slip Road Closure
-
30th of July 2025, 8:00pm2nd of August 2025, 6:00amA82 NB Between Stoneymollan & Lomondgate Rbts - Road Closure
-
31st of July 2025, 8:00pm1st of August 2025, 6:00amM77 Jct 2 to Jct 1 NB - Total Closure
-
31st of July 2025, 8:00pm1st of August 2025, 6:00amM77 Jct 2 On Slip NB - Slip Closure
-
31st of July 2025, 8:00pm1st of August 2025, 6:00amM77 Jct 4 to Jct 5 SB- Lane Closure
-
31st of July 2025, 8:00pm1st of August 2025, 6:00amM8 Jct 29 to Jct 30 WB- Lane Closure
-
31st of July 2025, 8:00pm1st of August 2025, 6:00amA82 Great Western Rd NB- Lane Closure GG16
-
31st of July 2025, 8:00pm1st of August 2025, 6:00amM8 WB Jct 25 Off slip - Slip Closure
-
31st of July 2025, 8:00pm1st of August 2025, 6:00amM8 WB Jct 25 Onslip - Slip Closure
-
31st of July 2025, 8:00pm7th of August 2025, 6:00amA90 - NB - Dalmeny - Road Closure
-
31st of July 2025, 8:00pm7th of August 2025, 6:00amA90 - NB - Craigiehall Onslip - Road Closure
-
31st of July 2025, 8:00pm1st of August 2025, 6:00amM8 EB Jct 25 Onslip - Slip Closure
-
31st of July 2025, 8:00pm7th of August 2025, 6:00amA90 - NB - Dalmeny Off Slip - Road Closure
-
1st of August 2025, 7:30pm14th of August 2025, 6:00amA7-NB-North of Hawick-Road Closure
-
1st of August 2025, 7:30pm14th of August 2025, 6:00amA7-SB-North of Hawick-Road Closure
-
1st of August 2025, 8:00pm2nd of August 2025, 6:00amM77 Jct off slip NB- Slip Closure
-
1st of August 2025, 8:00pm2nd of August 2025, 6:00amM8 Jct 26 to Jct 24 EB -Total Closure
-
1st of August 2025, 8:00pm2nd of August 2025, 6:00amM8 Jct 26 on slip EB- Road Closure
-
1st of August 2025, 8:00pm2nd of August 2025, 6:00amM8 25a on slip EB - Road Closure
-
1st of August 2025, 8:00pm2nd of August 2025, 6:00amM8 Jct 25a on slip EB- Road Closure
-
1st of August 2025, 8:00pm2nd of August 2025, 6:00amM8 25 off slip EB- Road Closure
-
1st of August 2025, 8:00pm2nd of August 2025, 6:00amM8 Jct 25 on slip EB- Road closure
-
1st of August 2025, 8:00pm2nd of August 2025, 6:00amM8 Jct 24 off slip EB Road Closure
-
1st of August 2025, 8:00pm4th of August 2025, 6:00amM74 SB Jct 6 - 7 Road Part of a Diversion Route
-
1st of August 2025, 8:00pm4th of August 2025, 6:00amM74 NB Jct 7 - 6 Road Part of a Diversion Route
-
1st of August 2025, 8:00pm2nd of August 2025, 6:00amM8 EB Jct 25 Off slip- Slip Closure
-
1st of August 2025, 8:00pm4th of August 2025, 6:00amM74 Northbound Junction 5 on-slip - Total closure
-
1st of August 2025, 8:00pm4th of August 2025, 6:00amA7071 to M74 Northbound Freeflow - Total closure
-
1st of August 2025, 8:00pm4th of August 2025, 6:00amA725 Raith Roundabout - Outer ring closure
-
2nd of August 2025, 8:30pm3rd of August 2025, 6:00amM8 EB Jct 3 to 2. Road Closure.
-
2nd of August 2025, 8:30pm3rd of August 2025, 6:00amM8 EB Jct 3 on-slip. Road Closure.
-
2nd of August 2025, 8:30pm3rd of August 2025, 6:00amM8 EB Jct 2 off-slip. Road Closure.
-
2nd of August 2025, 8:30pm3rd of August 2025, 6:00amM8 WB Jct 2 to 3. Road Closure.
-
2nd of August 2025, 8:30pm3rd of August 2025, 6:00amM8 WB Jct 3 off-slip. Road Closure.
-
2nd of August 2025, 8:30pm3rd of August 2025, 6:00amM9 EB Jct 1 to M8 WB Jct 2. Road Closure.
-
3rd of August 2025, 8:00am3rd of August 2025, 4:30pmA737 SB Kilbarchan IC - Elliston IC Johnstone- TTLS
-
3rd of August 2025, 8:00am3rd of August 2025, 4:30pmA737 NB Kilbarchan IC - Elliston IC Johnstone- TTLS
-
3rd of August 2025, 7:00pm15th of August 2025, 6:00amA9 Ramscraigs South of Dunbeath NB - Road Closure with Amnesties
-
3rd of August 2025, 7:00pm15th of August 2025, 6:00amA9 Ramscraigs South of Dunbeath SB - Road Closure with Amnesties
-
3rd of August 2025, 7:00pm6th of August 2025, 7:00amA830 Arienskill East of Lochailort WB - Road Closure with Amnesties
-
3rd of August 2025, 7:00pm6th of August 2025, 7:00amA830 Arienskill East of Lochailort EB - Road Closure with Amnesties
-
3rd of August 2025, 7:30pm22nd of August 2025, 6:30amM90 Glenfarg- Lane Closure N/B
-
3rd of August 2025, 7:30pm22nd of August 2025, 6:30amM90 Glenfarg- Lane Closure S/B
-
3rd of August 2025, 8:00pm27th of August 2025, 6:00amA725 Northbound at Bothwell Rd OB - Total Closure
-
3rd of August 2025, 8:00pm27th of August 2025, 6:00amA725 Northbound on slip from B7012 - Total closure
-
3rd of August 2025, 8:00pm7th of August 2025, 6:00amA725 Northound On slip from A724 - Total closure
-
3rd of August 2025, 8:00pm27th of August 2025, 6:00amA725 Northbound On Slip from local road - Total closure
-
3rd of August 2025, 8:00pm27th of August 2025, 6:00amA725 Northbound off slip to Bellshill Bypass - Total Closure
-
3rd of August 2025, 8:30pm23rd of August 2025, 6:00amM9 WB Junction 9 to Junction 10. Lane Closure.
-
3rd of August 2025, 8:30pm23rd of August 2025, 6:00amM9 - WB - Junction 10 off slip - Slip Closure.
-
4th of August 2025, 6:00am8th of August 2025, 7:30pmA7-NB-North of Hawick-TTLs
-
4th of August 2025, 6:00am8th of August 2025, 7:30pmA7-SB-North of Hawick-TTLs
-
4th of August 2025, 7:00am15th of August 2025, 7:00pmA9 Helmsdale SB - TTL
-
4th of August 2025, 7:00am15th of August 2025, 7:00pmA9 Helmsdale NB - TTL
-
4th of August 2025, 7:00am15th of August 2025, 7:00pmA726 Queensway WB - Road As Part Of Diversion
-
4th of August 2025, 7:00am15th of August 2025, 7:00pmA726 Queensway EB - Road As Part Of Diversion
-
4th of August 2025, 7:00am29th of August 2025, 7:00pmA85 Dalveich East of Lochernhead WB - TTL
-
4th of August 2025, 7:00am29th of August 2025, 7:00pmA85 Dalveich East of Lochernhead EB - TTL
-
4th of August 2025, 8:00am13th of August 2025, 4:00pmA92 Portlethen. Diversion for N/B off slip closure
-
4th of August 2025, 8:00am7th of August 2025, 5:00pmA977 - NB - Longannet Rdbt to Kilbagie Rdbt - Stop and Go
-
4th of August 2025, 8:00am7th of August 2025, 5:00pmA977 - SB - Longannet Rdbt to Kilbagie Rdbt - Stop and Go
-
4th of August 2025, 8:00am8th of August 2025, 4:00pmA83 Rhuanhaorine North of Tayinloan SB - TTL
-
4th of August 2025, 8:00am8th of August 2025, 4:00pmA83 Rhuanhaorine North of Tayinloan NB - TTL
-
4th of August 2025, 9:00am8th of August 2025, 3:30pmA92 Letham- Diversion signage- S/B
-
4th of August 2025, 9:30am31st of August 2025, 5:00pmA898 SB Adjacent to A898 Erskine Bridge - No obstruction on c/way or f/way
-
4th of August 2025, 9:30am31st of August 2025, 5:00pmA898 NB Adjacent to A898 Erskine Bridge - No obstruction on c/way or f/way
-
4th of August 2025, 6:00pm16th of August 2025, 7:00amA76 S/B Lugar Water to Pennylands - Road Closure
-
4th of August 2025, 6:00pm16th of August 2025, 7:00amA76 N/B Lugar Water to Pennylands - Road Closure
-
4th of August 2025, 7:00pm8th of August 2025, 2:00amA9 Rosskeen to Tomich NB - TTL
-
4th of August 2025, 7:00pm8th of August 2025, 2:00amA9 Rosskeen to Tomich SB - TTL
-
4th of August 2025, 7:30pm5th of August 2025, 6:30amA90 Forfar to Bogindollo- Lane Closure N/B
-
4th of August 2025, 7:30pm7th of August 2025, 6:00amA876 - EB - Higgins Neuk Roundabout - Road Closure
-
4th of August 2025, 7:30pm7th of August 2025, 6:00amA823(M) - WB - Road Closure
-
4th of August 2025, 7:30pm7th of August 2025, 6:00amA823(M) - WB - Road Closure
-
4th of August 2025, 7:30pm7th of August 2025, 6:00amA823(M) - EB - Road Closure
-
4th of August 2025, 7:30pm7th of August 2025, 6:00amA823(M) - EB - Road Closure
-
4th of August 2025, 7:30pm9th of August 2025, 6:00amA1 - SB - Abbotsview - Lane Closure
-
4th of August 2025, 8:00pm5th of August 2025, 6:00amM77 SB Jct 4 to Ayr Rd - Total Closure
-
4th of August 2025, 8:00pm5th of August 2025, 6:00amM77 SB Jct 3 - 4 - Lane Closure
-
4th of August 2025, 8:00pm5th of August 2025, 6:00amA9 Lynchat North of Kingussie NB - TTL
-
4th of August 2025, 8:00pm5th of August 2025, 6:00amA9 Lynchat North of Kingussie SB - TTL
-
4th of August 2025, 8:00pm5th of August 2025, 6:00amA9 Glentruim North of Dalwhinnie NB - TTL
-
4th of August 2025, 8:00pm5th of August 2025, 6:00amA9 Glentruim North of Dalwhinnie SB - TTL
-
4th of August 2025, 8:00pm5th of August 2025, 6:00amA9 Granish NB - TTL
-
4th of August 2025, 8:00pm5th of August 2025, 6:00amA9 Granish SB - TTL
-
5th of August 2025, 7:00pm8th of August 2025, 5:00amA83 Port Ann NB - Road Closure with Amnesties
-
5th of August 2025, 7:00pm8th of August 2025, 5:00amA83 Port Ann SB - Road Closure with Amnesties
-
5th of August 2025, 7:30pm6th of August 2025, 6:30amA96 Nairn River Bridge - TTL's
-
5th of August 2025, 8:00pm6th of August 2025, 6:00amM77 Jct 2 - Jct 1 NB - Total Closure
-
5th of August 2025, 8:00pm6th of August 2025, 6:00amM77 Jct 2 NB Onslip - Total Closure
-
5th of August 2025, 8:00pm6th of August 2025, 6:00amM77 Jct 1 NB Offslip - Total Closure
-
5th of August 2025, 8:00pm6th of August 2025, 6:00amM77 NB Prior to Jct 2 - Lane closure
-
5th of August 2025, 8:00pm6th of August 2025, 6:00amM9 Jct 10 NB onslip
-
5th of August 2025, 8:00pm6th of August 2025, 6:00amM9 Jct 10 SB
-
5th of August 2025, 8:00pm6th of August 2025, 6:00amA90 Glendoick Off slip closure N/B
-
5th of August 2025, 8:00pm6th of August 2025, 6:00amA90 Glendoick On slip closure N/B
-
5th of August 2025, 8:00pm6th of August 2025, 6:00amA90 Glendoick Lane closure N/B
-
5th of August 2025, 8:00pm6th of August 2025, 6:00amA9 At Layby 60 North of Calvine NB - TTL
-
5th of August 2025, 8:00pm6th of August 2025, 6:00amA9 At Layby 60 North of Calvine SB - TTL
-
5th of August 2025, 8:00pm6th of August 2025, 6:00amA9 Pitlochry SB - TTL
-
5th of August 2025, 8:00pm6th of August 2025, 6:00amA9 Pitlochry NB - TTL
-
5th of August 2025, 8:00pm6th of August 2025, 6:00amA9 Carrbridge NB - TTL
-
5th of August 2025, 8:00pm6th of August 2025, 6:00amA9 Carrbridge SB - TTL
-
5th of August 2025, 10:00pm6th of August 2025, 6:00amM8 - EB - Jct3 to Jct 2 - Lane closure
-
6th of August 2025, 6:00am7th of August 2025, 8:00pmA9000/FRB SB. Contraflow.
-
6th of August 2025, 6:00am7th of August 2025, 8:00pmA9000/FRB NB. Contraflow.
-
6th of August 2025, 7:00pm8th of August 2025, 6:00amA86 Pattack Falls West of Strathmashie WB - Road Closure with Amnesties
-
6th of August 2025, 7:00pm8th of August 2025, 6:00amA86 Pattack Falls West of Strathmashie EB - Road Closure with Amnesties
-
6th of August 2025, 7:30pm7th of August 2025, 6:30amA92 NB Lochgelly - off slip Closure
-
6th of August 2025, 7:30pm8th of August 2025, 6:00amM9 - NB - Jct 9- On Slip Closure
-
6th of August 2025, 7:30pm10th of October 2025, 6:00amM9 - NB - Jct 10- On Slip Closure
-
6th of August 2025, 7:30pm7th of August 2025, 6:30amA95 Dulnain New Bridge, Speybridge - TTL's
-
6th of August 2025, 7:30pm7th of August 2025, 6:00amA1 - SB - Abbotsview Off-slip - Road Closure
-
6th of August 2025, 7:30pm9th of August 2025, 6:00amA1 - SB - Abbotsview On-slip - Road Closure
-
6th of August 2025, 8:00pm8th of August 2025, 6:00amM9 - SB - Jct 9 - Off Slip Closure
-
6th of August 2025, 8:00pm7th of August 2025, 6:00amA9 Faskally Pitlochry SB - TTL
-
6th of August 2025, 8:00pm7th of August 2025, 6:00amA9 Faskally Pitlochry NB - TTL
-
6th of August 2025, 8:00pm7th of August 2025, 6:00amA9 Kindallachan South of Ballinluig SB - TTL
-
6th of August 2025, 8:00pm7th of August 2025, 6:00amA9 Kindallachan South of Ballinluig NB - TTL
-
6th of August 2025, 8:00pm7th of August 2025, 6:00amA9 Dalmarnock North of Dunkeld NB - TTL
-
6th of August 2025, 8:00pm7th of August 2025, 6:00amA9 Dalmarnock North of Dunkeld SB - TTL
-
6th of August 2025, 10:00pm7th of August 2025, 6:00amM8 - WB - Jct 2 to Jct 3 - Lane closure
-
7th of August 2025, 7:00am29th of August 2025, 6:00pmA985 - EB - Admiralty to Higgins Neuk Rdbt - Stop Go
-
7th of August 2025, 7:00am29th of August 2025, 6:00pmA985 - WB - Admiralty to Higgins Neuk Rdbt - Stop Go
-
7th of August 2025, 8:00pm28th of August 2025, 6:00amA725 Southbound Onslip from Raith I/C - Total closure
-
7th of August 2025, 8:00pm28th of August 2025, 6:00amA725 Southbound off slip to Whistleberry road - Total closure
-
7th of August 2025, 8:00pm8th of August 2025, 6:00amA9 Sth of B9141 Dunning Jct. N/B - NB10 - N/B MLC
-
7th of August 2025, 8:00pm8th of August 2025, 6:00amA9 Nth of Forteviot Jct. S/B - SB03 - S/B MLC
-
7th of August 2025, 8:00pm8th of August 2025, 6:00amA9 Nth of A824 Gleneagles Jct. S/B - SB05 - S/B MLC
-
7th of August 2025, 8:00pm8th of August 2025, 6:00amA90 NB - Lane Closure - Jct 1
-
7th of August 2025, 8:00pm8th of August 2025, 6:00amA90 NB - PTL closure - Jct 1
-
7th of August 2025, 8:00pm14th of August 2025, 6:00amM876 WB Junction 2 On-Slip closure
-
7th of August 2025, 8:00pm14th of August 2025, 6:00amM876 - WB - Jct 2 - lane closure
-
7th of August 2025, 8:00pm28th of August 2025, 6:00amA725 Southbound at Bothwell road OB - Total Closure
-
7th of August 2025, 10:00pm8th of August 2025, 6:00amM8 - EB - Jct 3 to Jct 2 - Lane closure
-
7th of August 2025, 10:00pm8th of August 2025, 6:00amM8 - WB - Jct 2 to Jct 3 - Lane closure
-
8th of August 2025, 8:00am25th of August 2025, 5:00pmA9 Aviemore - Signage Only
-
8th of August 2025, 8:00pm11th of August 2025, 6:00amM9 - EB - Newbridge - Hard Shoulder Closure
-
8th of August 2025, 8:00pm11th of August 2025, 6:00amM9 - WB - Newbridge - Hard Shoulder Closure
-
8th of August 2025, 8:00pm9th of August 2025, 6:00amA9 Sth of A824 Gleneagles Jct. N/B - NB07 - N/B MLC
-
8th of August 2025, 8:00pm9th of August 2025, 6:00amA9 Sth of A824 Aberuthven Jct. N/B - NB09 - N/B MLC
-
8th of August 2025, 8:00pm9th of August 2025, 6:00amA9 Sth of A822 Greenloaning on slip. S/B - SB08 - S/B MLC
-
8th of August 2025, 8:00pm9th of August 2025, 6:00amM9 - EB - Junction 4 to 3 - Road Closure
-
8th of August 2025, 10:00pm9th of August 2025, 3:00amA85 Orchy Bridge to Taynuilt WB - Road Closure
-
8th of August 2025, 10:00pm9th of August 2025, 3:00amA85 Orchy Bridge to Taynuilt WB - Road Closure
-
10th of August 2025, 7:00pm14th of August 2025, 6:00amA86 Tullochrome West of Kinloch Laggan WB - Road Closure with Amnesties
-
10th of August 2025, 7:00pm16th of August 2025, 5:00amA83 Achnaba Port Ann SB - Road Closure with Amnesties
-
10th of August 2025, 7:00pm16th of August 2025, 5:00amA83 Achnaba Port Ann NB - Road Closure with Amnesties
-
10th of August 2025, 7:00pm14th of August 2025, 6:00amA86 Tullochrome West of Kinloch Laggan EB - Road Closure with Amnesties
-
10th of August 2025, 7:30pm5th of September 2025, 6:30amA92 Cowdenbeath to Denburn Br - NB Lane 2 closures
-
10th of August 2025, 7:30pm5th of September 2025, 6:30amA92 Denburn Br to Cowdenbeath - SB Lane 2 closures
-
11th of August 2025, 6:00am15th of August 2025, 8:00pmM8 EB Jct 11 - Hardshoulder Closure
-
11th of August 2025, 6:00am29th of August 2025, 6:00pmM74 SB Jct 9 Off Slip - Hard Shoulder Closure
-
11th of August 2025, 7:00am15th of August 2025, 7:00pmA82 Butterbridge South of Rest and Be Thankful SB - TTL
-
11th of August 2025, 7:00am15th of August 2025, 7:00pmA82 Butterbridge South of Rest and Be Thankful NB - TTL
-
11th of August 2025, 9:00am13th of August 2025, 4:00pmA92 Portlethen. N/B off slip closure
-
11th of August 2025, 9:30am15th of August 2025, 3:30pmA1 S/B Thistly Cross Roundabout. Lane Closure
-
11th of August 2025, 7:00pm23rd of August 2025, 7:00amA82 Stronaba to Letterfindlay NB - TTL
-
11th of August 2025, 7:00pm23rd of August 2025, 7:00amA82 Stronaba to Letterfindlay SB - TTL
-
11th of August 2025, 7:00pm11th of August 2025, 11:59pmA84 Main St Callander NB - TTL
-
11th of August 2025, 7:00pm11th of August 2025, 11:59pmA84 Main St Callander SB - TTL
-
11th of August 2025, 8:00pm13th of August 2025, 6:00amM8 EB Jct 20 West St On slip Total Closure
-
11th of August 2025, 8:00pm16th of August 2025, 6:00amM8 EB Jct 11 - Lane 1 Closure
-
11th of August 2025, 8:00pm12th of August 2025, 6:00amA82 NB Stirling Road Greenhead Road - Round Riding Road- Lane Closures
-
11th of August 2025, 8:00pm23rd of August 2025, 6:00amM8 J25 WB off slip to Fifty Pitches - Total Closure
-
11th of August 2025, 8:00pm23rd of August 2025, 6:00amM8 Westbound J24-J25 - Lane closure
-
11th of August 2025, 8:00pm23rd of August 2025, 6:00amM8 J24 WB on slip - Total closure
-
11th of August 2025, 8:00pm12th of August 2025, 6:00amA77 NB Whitlets to Sandyford - Road closure
-
11th of August 2025, 8:00pm12th of August 2025, 6:00amA77 NB Sandyford to Dutchhouse - Road closure
-
11th of August 2025, 8:00pm12th of August 2025, 6:00amA77 SB Dutchhouse to Sandyford - Road Closure
-
11th of August 2025, 8:00pm12th of August 2025, 6:00amA77 SB Sandyford to Whitletts - Road Closure
-
11th of August 2025, 8:00pm12th of August 2025, 6:00amA78 NB Dutchhouse to Monktonhead - Lane1 Closure
-
11th of August 2025, 8:00pm12th of August 2025, 6:00amA78 SB Monktonhead to Dutchhouse - Lane Closure
-
11th of August 2025, 8:00pm15th of August 2025, 4:30amM9 - WB - Jct 5 - On-Slip. Road Closure
-
11th of August 2025, 9:00pm23rd of August 2025, 6:00amA82 Fort Augustus - Aberchalder SB - TTL
-
11th of August 2025, 9:00pm23rd of August 2025, 6:00amA82 Fort Augustus - Aberchalder NB - TTL
-
12th of August 2025, 6:00am30th of September 2025, 7:00pmA9 Dalguise to Dowally North of Dunkeld - Vergeworks
-
12th of August 2025, 8:00am8th of September 2025, 5:00pmA95 Mulben- TTLS N/B
-
12th of August 2025, 9:30am15th of August 2025, 3:30pmA96 Elgin- TTLS W/B
-
12th of August 2025, 7:00pm15th of August 2025, 6:00amA830 Ranochan Loch Eilt WB - Road Closure with Amnesties
-
12th of August 2025, 7:00pm15th of August 2025, 6:00amA830 Ranochan Loch Eilt EB - Road Closure with Amnesties
-
12th of August 2025, 7:00pm20th of August 2025, 7:00amA830 Loch Eil Side Station East of Kinlocheil WB - Road Closure with Amnesties
-
12th of August 2025, 7:00pm20th of August 2025, 7:00amA830 Loch Eil Side Station East of Kinlocheil EB - Road Closure with Amnesties
-
12th of August 2025, 7:00pm30th of September 2025, 6:00amA9 Dalguise to Dowally North of Dunkeld NB - TTL
-
12th of August 2025, 7:00pm30th of September 2025, 6:00amA9 Dalguise to Dowally North of Dunkeld SB - TTL
-
12th of August 2025, 8:00pm14th of August 2025, 6:00amA82 NB Dumbarton Road - Greenhead Road - Lane Closures
-
12th of August 2025, 8:00pm14th of August 2025, 6:00amA82 SB Greenhead Road Dumbarton Road- Lane Closures
-
12th of August 2025, 8:00pm14th of August 2025, 6:00amA82 SB Stirling Road - Round Riding Road - Greenhead Road - Lane Closures
-
12th of August 2025, 8:00pm13th of August 2025, 6:00amA77 NB Dutchouse Rbt to Bellfield IC - Closure
-
12th of August 2025, 8:00pm13th of August 2025, 6:00amA77 NB Symington off slip - Closure
-
12th of August 2025, 8:00pm13th of August 2025, 6:00amA77 NB Symington on slip - Closure
-
12th of August 2025, 8:00pm13th of August 2025, 6:00amA77 NB Bogend off slip - Closure
-
12th of August 2025, 8:00pm13th of August 2025, 6:00amA77 NB Bogend on slip - Closure
-
12th of August 2025, 8:00pm13th of August 2025, 6:00amA77 NB Spitallhill off slip - Closure
-
12th of August 2025, 8:00pm13th of August 2025, 6:00amA77 NB Bellfield IC off slip - Closure
-
13th of August 2025, 8:00am15th of August 2025, 5:00pmA737 NB Howwood - TTL's
-
13th of August 2025, 8:00am15th of August 2025, 5:00pmA737 SB Howwood - TTL's
-
13th of August 2025, 8:00pm15th of August 2025, 6:00amM8 WB Jct 19 Waterloo Street on slip - Slip Closure
-
13th of August 2025, 8:00pm15th of August 2025, 6:00amM8 WB Jct 19 Kingston Bridge - Lane Closure
-
13th of August 2025, 8:00pm14th of August 2025, 6:00amA77 NB Bellfield IC to Meiklewood - Closure
-
13th of August 2025, 8:00pm14th of August 2025, 6:00amA77 NB Bellfield IC on slip - Closure
-
13th of August 2025, 8:00pm14th of August 2025, 6:00amA77 NB Grassyards off slip - Closure
-
13th of August 2025, 8:00pm14th of August 2025, 6:00amA77 NB Grassyards on slip - Closure
-
13th of August 2025, 8:00pm14th of August 2025, 6:00amA77 NB Meiklewood off slip - road closure
-
13th of August 2025, 8:00pm14th of August 2025, 4:30amM9 - WB - Jct 5 off-slip. Lane Closure
-
13th of August 2025, 8:00pm15th of August 2025, 6:00amM8 WB Jct 19 Link Road from Stobcross on slip - Closure
-
14th of August 2025, 8:00am29th of August 2025, 8:00pmM90 Bridge of Earn Off slip closure- N/B
-
14th of August 2025, 7:00pm20th of August 2025, 6:00amA86 Tulloch West of Roughburn EB - Road Closure with Amnesties
-
14th of August 2025, 7:00pm20th of August 2025, 6:00amA86 Tulloch West of Roughburn WB - Road Closure with Amnesties
-
14th of August 2025, 7:30pm20th of August 2025, 6:00amA7-NB-North of Ashkirk-Road closure
-
14th of August 2025, 7:30pm19th of August 2025, 6:00amA7-SB-North of Ashkirk-Road closure
-
14th of August 2025, 7:30pm16th of August 2025, 6:00amM9 - SB - Jct 11 - Jct 9 - Closure
-
14th of August 2025, 7:30pm16th of August 2025, 6:00amM9 - SB - Jct 10 - Off Slip Closure
-
14th of August 2025, 7:30pm16th of August 2025, 6:00amM9 - NB - Jct 9 - Jct 11 - Closure
-
14th of August 2025, 7:30pm16th of August 2025, 6:00amM9 - NB - Jct 10- On Slip Closure
-
14th of August 2025, 8:00pm19th of August 2025, 6:00amA82 SB Stirling Rd at Milton - Lane Closure
-
14th of August 2025, 8:00pm19th of August 2025, 6:00amA82 NB Stirling Rd at Milton - Lane Closure
-
14th of August 2025, 8:00pm16th of August 2025, 6:00amM9 - WB - Jct 9 to Jct 11 - Road closure
-
14th of August 2025, 8:00pm16th of August 2025, 6:00amM9 - WB - Jct 9 on slip - slip closure
-
14th of August 2025, 8:00pm16th of August 2025, 6:00amM80 - WB - Jct 9 on slip - slip closure
-
14th of August 2025, 8:00pm16th of August 2025, 6:00amM9 - WB - Jct 10 off slip - slip closure
-
14th of August 2025, 8:00pm16th of August 2025, 6:00amM9 - WB - Jct 10 on slip - slip closure
-
14th of August 2025, 8:00pm16th of August 2025, 6:00amM9 - EB - Jct 11 to Jct 9 - Road closure
-
14th of August 2025, 8:00pm16th of August 2025, 6:00amM9 - EB - Jct 10 off slip - Road closure
-
14th of August 2025, 8:00pm16th of August 2025, 6:00amM9 - EB - Jct 10 on slip - Road closure
-
14th of August 2025, 8:00pm16th of August 2025, 6:00amM9 - EB - Jct 9 on slip - Road closure
-
14th of August 2025, 8:00pm16th of August 2025, 6:00amM80 - EB - Jct 9 - Road closure
-
14th of August 2025, 8:00pm18th of October 2025, 6:00amM80 - WB - Jct 9 on slip - slip closure
-
14th of August 2025, 8:00pm15th of August 2025, 6:00amA77 SB - Meiklewood to Bellfield IC - Closure
-
14th of August 2025, 8:00pm15th of August 2025, 6:00amA77 SB - Meiklewood on slip Closure
-
14th of August 2025, 8:00pm15th of August 2025, 6:00amA77 SB - Grassyards off slip - Closure
-
14th of August 2025, 8:00pm15th of August 2025, 6:00amA77 SB - Grassyards on slip - Closure
-
14th of August 2025, 8:00pm15th of August 2025, 6:00amA77 SB - Bellfield IC off slip - Closure
-
15th of August 2025, 7:00pm16th of August 2025, 6:30amA985 - EB - Limekilns - Road Closure
-
15th of August 2025, 7:00pm16th of August 2025, 6:30amA985 - WB - Limekilns - Road Closure
-
15th of August 2025, 7:30pm19th of August 2025, 6:30amA985 - Layby - Crombie - Closure
-
15th of August 2025, 7:30pm19th of August 2025, 6:30amA985 - WB - Crombie - Road Closure
-
15th of August 2025, 7:30pm19th of August 2025, 6:30amA985 - EB - Crombie - Road Closure
-
15th of August 2025, 8:00pm16th of August 2025, 6:00amA77 SB - Bellfield IC to Dutchouse Rbt - Road Closure
-
15th of August 2025, 8:00pm16th of August 2025, 6:00amA77 SB - Bellfield IC on slip - Slip Closure
-
15th of August 2025, 8:00pm16th of August 2025, 6:00amA77 SB - Spitalhill on slip - Slip Closure
-
15th of August 2025, 8:00pm16th of August 2025, 6:00amA77 SB - Bogend off slip Tarbolton Road - Slip Closure
-
15th of August 2025, 8:00pm16th of August 2025, 6:00amA77 SB - Bogend on slip Tarbolton Road - Slip Closure
-
15th of August 2025, 8:00pm16th of August 2025, 6:00amA77 SB - Symington off slip - Slip Closure
-
15th of August 2025, 8:00pm16th of August 2025, 6:00amA77 SB - Symington on slip - Slip Closure
-
16th of August 2025, 1:30pm16th of August 2025, 2:00pmA83 Ardrishaig - Event Road Closure
-
16th of August 2025, 8:30pm23rd of August 2025, 6:00amM8 - EB - Jct 4 on slip - Closure
-
16th of August 2025, 8:30pm23rd of August 2025, 6:00amM8 - WB - Jct 3a on slip - Closure
-
16th of August 2025, 8:30pm23rd of August 2025, 6:00amM8 - EB - Jct 4 to 3A - Closure
-
16th of August 2025, 8:30pm23rd of August 2025, 6:00amM8 - WB - Jct 3a to Jct 4 - Closure
-
17th of August 2025, 8:00am31st of October 2025, 8:00amA985 WB Kincardine Bridge. Portable Traffic Lights
-
17th of August 2025, 8:00am31st of October 2025, 8:00amA985 EB Kincardine Bridge. Portable Traffic Lights
-
17th of August 2025, 7:00pm20th of August 2025, 5:00amA85 Quoig West of Crieff WB - Road Closure with Amnesties
-
17th of August 2025, 7:00pm20th of August 2025, 5:00amA85 Quoig West of Crieff EB - Road Closure with Amnesties
-
17th of August 2025, 7:00pm23rd of August 2025, 6:00amA82 Tarbet - Convoy Works
-
17th of August 2025, 7:00pm23rd of August 2025, 6:00amA83 Tarbet - Convoy Works
-
17th of August 2025, 7:00pm27th of August 2025, 5:00amA83 Rhunahaorine North of Tayinloan SB - Road Closure with Amnesties
-
17th of August 2025, 7:00pm27th of August 2025, 5:00amA83 Rhunahaorine North of Tayinloan NB - Road Closure with Amnesties
-
17th of August 2025, 7:00pm3rd of September 2025, 6:00amA9 Luncarty NB - Convoy Works
-
17th of August 2025, 7:00pm6th of September 2025, 6:00amA9 Luncarty NB Off Slip - Full Slip Closure
-
17th of August 2025, 7:00pm6th of September 2025, 6:00amA9 Luncarty NB On Slip - Full Slip Closure
-
17th of August 2025, 8:00pm18th of August 2025, 6:00amM8 EB Jct 15 Off slip - Advance Warning Signage
-
18th of August 2025, 7:00am16th of September 2025, 7:00pmA85 Gilmerton to Abercairney - Diversion Signage
-
18th of August 2025, 7:00am5th of September 2025, 7:00pmA83 Clachan SB - TTL
-
18th of August 2025, 7:00am5th of September 2025, 7:00pmA83 Clachan NB - TTL
-
18th of August 2025, 8:00am22nd of August 2025, 6:00pmA90 Peterhead NB - Diversion signage for local road closure
-
18th of August 2025, 8:00pm23rd of August 2025, 6:00amM77 - Junction 5 to Junction 8 SB Total closure
-
18th of August 2025, 8:00pm19th of August 2025, 6:00amA76 Newbridge SB- TTL
-
18th of August 2025, 8:00pm19th of August 2025, 6:00amA76 Newbridge NB- TTL
-
18th of August 2025, 8:00pm19th of August 2025, 6:00amA75 Ramhill WB-TTL
-
18th of August 2025, 8:00pm19th of August 2025, 6:00amA75 Ramhill EB-TTL
-
18th of August 2025, 8:00pm19th of August 2025, 6:00amA78 SB Montfode Rbt to Chapelhill Rbt - Road Closure
-
18th of August 2025, 8:00pm19th of August 2025, 6:00amA78 SB Chapelhill Rbt to Sharphill Rbt - Road Closure
-
18th of August 2025, 8:00pm19th of August 2025, 6:00amA78 SB Sharphill Rbt to Pennyburn Rbt -Road Closure
-
18th of August 2025, 8:00pm19th of August 2025, 6:00amA78 SB Pennyburn Rbt to Eglinton IC Road Closure
-
18th of August 2025, 8:00pm19th of August 2025, 6:00amA78 SB Eglinton off slip - Slip Closure
-
18th of August 2025, 8:00pm20th of August 2025, 6:00amM876 - EB - M80 to Jct 2 - Road Closure
-
18th of August 2025, 8:00pm22nd of August 2025, 4:30amM8- EB- On Slip - Hard Shoulder closure - Newbridge
-
18th of August 2025, 8:00pm22nd of August 2025, 4:30amM8- EB- Onslip - lane 1 closure - Newbridge
-
18th of August 2025, 8:00pm20th of August 2025, 6:00amM876 - EB - M80 to Jct 2 - Road Closure
-
18th of August 2025, 8:00pm20th of August 2025, 6:00amM876 - EB - Jct 1 - Slip Road Closure
-
18th of August 2025, 8:00pm8th of September 2025, 6:00amM8 WB Jct 29 Onslip - Slip Closure
-
19th of August 2025, 7:30pm20th of August 2025, 6:00amA985 - EB - West of Cairneyhill - Road Closure
-
19th of August 2025, 7:30pm20th of August 2025, 6:00amA985 - WB - West of Cairneyhill - Road Closure.
-
19th of August 2025, 8:00pm20th of August 2025, 6:00amA75 Creebridge WB- TTL
-
19th of August 2025, 8:00pm20th of August 2025, 6:00amA75 Creebridge EB- TTL
-
19th of August 2025, 8:00pm20th of August 2025, 6:00amA75 Shennanton WB- TTL
-
19th of August 2025, 8:00pm20th of August 2025, 6:00amA75 Shennanton EB- TTL
-
19th of August 2025, 8:00pm20th of August 2025, 6:00amA78 NB Onslip Irvine Bypass Slip Closure
-
19th of August 2025, 8:00pm20th of August 2025, 6:00amA78 NB Eglinton IC to Pennyburn Rbt - Road Closure
-
19th of August 2025, 8:00pm20th of August 2025, 6:00amA78 NB Pennyburn Rbt to Sharphill Rbt - Road Closure
-
19th of August 2025, 8:00pm20th of August 2025, 6:00amA78 NB Sharphill Rbt to Chapelhill Rbt - Road Closure
-
19th of August 2025, 8:00pm20th of August 2025, 6:00amA78 NB Chapelhill Rbt to Montfode Rbt - Road closure
-
20th of August 2025, 8:00am8th of September 2025, 6:00pmA887 Torgyle West of Dundreggan EB - TTL
-
20th of August 2025, 8:00am8th of September 2025, 6:00pmA887 Torgyle West of Dundreggan WB - TTL
-
20th of August 2025, 9:30am20th of August 2025, 3:30pmA76 Blackwood Auldgirth SB- TTL
-
20th of August 2025, 9:30am20th of August 2025, 3:30pmA76 Blackwood Auldgirth NB- TTL
-
20th of August 2025, 7:00pm30th of August 2025, 6:00amA85 Quoig West of Crieff - Convoy Works
-
20th of August 2025, 7:00pm1st of September 2025, 7:00amA830 Mhuidhe East West of Glenfinnan WB - Road Closure with Amnesties
-
20th of August 2025, 7:00pm1st of September 2025, 7:00amA830 Mhuidhe East West of Glenfinnan EB - Road Closure with Amnesties
-
20th of August 2025, 7:00pm3rd of September 2025, 7:00amA9 Dalmore - Convoy Works
-
20th of August 2025, 7:00pm3rd of September 2025, 6:00amA86 Meall Doire Roybridge WB - Road Closure with Amnesties
-
20th of August 2025, 7:00pm3rd of September 2025, 6:00amA86 Meall Doire Roybridge EB - Road Closure with Amnesties
-
20th of August 2025, 7:30pm21st of August 2025, 6:00amA985 - EB - Gowerfield Crossroads - Road Closure
-
20th of August 2025, 7:30pm21st of August 2025, 6:00amA985 - WB - Gowerfield Crossroads - Road Closure
-
20th of August 2025, 7:30pm27th of August 2025, 6:00amA1 - Wallyford to old craighall - Northbound - Closure
-
20th of August 2025, 7:30pm27th of August 2025, 6:00amA1 - Wallyford on slip - Northbound - Closure
-
20th of August 2025, 7:30pm27th of August 2025, 6:00amA1 - Old Craighall - Northbound - Closure
-
20th of August 2025, 8:00pm21st of August 2025, 6:00amM8 WB Jct 29 St James IC to 29a Lane Closure
-
20th of August 2025, 8:00pm21st of August 2025, 6:00amM8 EB Jct 29a Bishopton to Jct 29 Lane Closure
-
20th of August 2025, 8:00pm21st of August 2025, 6:00amA78 NB - Monktonhead Rbt to Meadowhead Rbt - Road closure
-
20th of August 2025, 8:00pm21st of August 2025, 6:00amA78 NB - Loans off slip - Slip Closure
-
20th of August 2025, 8:00pm21st of August 2025, 6:00amA78 NB - Loans on slip - Slip Closure
-
20th of August 2025, 8:00pm21st of August 2025, 6:00amA78 NB - Barassie off slip - Slip closure
-
20th of August 2025, 8:00pm21st of August 2025, 6:00amA78 SB Eglinton IC to Meadowhead Rbt -Road Closure
-
20th of August 2025, 8:00pm21st of August 2025, 6:00amA78 SB Eglinton IC on slip - Slip Closure
-
20th of August 2025, 8:00pm21st of August 2025, 6:00amA78 SB Warrix IC off slip - Slip Closure
-
20th of August 2025, 8:00pm21st of August 2025, 6:00amA78 SB Warrix IC on slip - Slip Closure
-
20th of August 2025, 8:00pm21st of August 2025, 6:00amA78 SB Newhouse off slip- Slip Closure
-
20th of August 2025, 8:00pm21st of August 2025, 6:00amA78 SB Newhouse IC on slip - Slip Closure
-
20th of August 2025, 8:00pm21st of August 2025, 6:00amM876 - WB - Jct 1 - Slip Closure
-
20th of August 2025, 8:00pm21st of August 2025, 6:00amM876 - WB - Jct 1 - Slip Closure
-
21st of August 2025, 8:00am21st of August 2025, 5:00pmA92 Cupar- Signage S/B
-
21st of August 2025, 7:30pm23rd of August 2025, 6:00amA985 - EB - Devilla Forest - Closure
-
21st of August 2025, 7:30pm23rd of August 2025, 6:00amA985 - WB - Devilla Forest - Closure
-
21st of August 2025, 8:00pm22nd of August 2025, 6:00amA78 NB Meadowhead Rbt to Eglinton IC - Road Closure
-
21st of August 2025, 8:00pm22nd of August 2025, 6:00amA78 NB Newhouse offslip - Closure
-
21st of August 2025, 8:00pm22nd of August 2025, 6:00amA78 NB Newhouse IC onslip - Closure
-
21st of August 2025, 8:00pm22nd of August 2025, 6:00amA78 NB Warrix IC off slip - Closure
-
21st of August 2025, 8:00pm22nd of August 2025, 6:00amA78 NB Warrix IC on slip - Closure
-
21st of August 2025, 8:00pm22nd of August 2025, 6:00amA78 SB Meadowhead Rbt to Monktonhead Rbt- Closure
-
21st of August 2025, 8:00pm22nd of August 2025, 6:00amA78 SB Auchengate Onslip - Slip Closure
-
21st of August 2025, 8:00pm22nd of August 2025, 6:00amA78 SB Loans off slip - Slip Closure
-
21st of August 2025, 8:00pm22nd of August 2025, 6:00amA78 SB Loans on slip - Slip Closure
-
22nd of August 2025, 8:00am4th of September 2025, 5:00pmA830 Back of Keppoch West of Arisaig to Morar - Diversion Signage
-
22nd of August 2025, 7:00pm23rd of August 2025, 5:00amA85 Quoig West of Crieff - Convoy Works
-
22nd of August 2025, 8:00pm23rd of August 2025, 6:00amA82 NB Barloan to Stoneymollan Rbt - Total Closure
-
22nd of August 2025, 8:00pm23rd of August 2025, 6:00amA82 NB offslip to Renton Rd - Total Closure
-
22nd of August 2025, 8:00pm23rd of August 2025, 6:00amA82 S/B Stoneymollan to Barloan – Total Closure
-
22nd of August 2025, 8:00pm23rd of August 2025, 6:00amA82 S/B Renton On Slip - Total Closure
-
22nd of August 2025, 8:00pm23rd of August 2025, 6:00amA82 S/B Renton Off Slip - Total Closure
-
23rd of August 2025, 7:00am8th of December 2025, 6:30amA96 Keith to Fochabers. Diversion signage for local road closure
-
23rd of August 2025, 12:00pm23rd of August 2025, 2:00pmA95 Granish Jct SB - Event - Road Closure
-
24th of August 2025, 6:30am29th of August 2025, 3:30pmA68 - SB - Blainslie to Birkenside - TTL's
-
24th of August 2025, 6:30am29th of August 2025, 3:30pmA68 - NB - Birkenside to Blainslie - TTL's
-
24th of August 2025, 9:30am24th of August 2025, 3:30pmA77 Glengall Souh Ayrshire SB- TTL
-
24th of August 2025, 9:30am24th of August 2025, 3:30pmA77 Glengall Souh Ayrshire NB- TTL
-
24th of August 2025, 7:00pm29th of August 2025, 5:00amA9 Inshes to Tore NB - MLC
-
24th of August 2025, 7:00pm29th of August 2025, 5:00amA9 Inshes to Tore SB - MLC
-
24th of August 2025, 7:30pm5th of September 2025, 6:30amA90 Bullionfield NB - Lane closure
-
24th of August 2025, 7:30pm5th of September 2025, 6:30amA90 Bullionfield SB - Lane closure
-
25th of August 2025, 9:00am7th of November 2025, 10:00pmA85 Gilmerton to Lix Toll - Diversion Signage
-
25th of August 2025, 9:30am29th of August 2025, 3:30amA9 Gleneagles. S/B lane 1 closure
-
25th of August 2025, 8:00pm26th of August 2025, 6:00amM77 - Junction 5 to DBFO Boundary SB Total closure
-
25th of August 2025, 8:00pm26th of August 2025, 6:00amA82 NB Barloan to Stoneymollan Rbt - Total Closure
-
25th of August 2025, 8:00pm26th of August 2025, 6:00amA82 NB offslip to Renton Rd - Total Closure
-
25th of August 2025, 8:00pm26th of August 2025, 6:00amA82 S/B Stoneymollan to Barloan – Total Closure
-
25th of August 2025, 8:00pm26th of August 2025, 6:00amA82 S/B Renton On Slip - Total Closure
-
25th of August 2025, 8:00pm26th of August 2025, 6:00amA82 S/B Renton Off Slip - Total Closure
-
25th of August 2025, 8:00pm26th of August 2025, 6:00amM77 SB Jct 4 off slip - Lane Closure
-
26th of August 2025, 8:00am26th of August 2025, 5:00pmA90 Forfar- Diversion signage- S/B
-
26th of August 2025, 8:00am28th of August 2025, 5:00pmA9 Aberuthven to Perth- Diversion signage- N/B
-
26th of August 2025, 8:00pm29th of August 2025, 6:00amM77 - Meiklewood off-slip to Junction 5 Maidenhill - NB Total closure
-
26th of August 2025, 8:00pm27th of August 2025, 6:00amM8 WB Jct 27 to 29 - Lane Closure
-
26th of August 2025, 8:00pm27th of August 2025, 6:00amM8 WB Jct 27 off slip - Slip Closure
-
26th of August 2025, 8:00pm27th of August 2025, 6:00amM8 WB Jct 27 on slip - Slip Closure
-
26th of August 2025, 8:00pm27th of August 2025, 6:00amM8 WB Jct 28 of slip - Slip Closure
-
26th of August 2025, 8:00pm27th of August 2025, 6:00amM8 WB Jct 28a to A737 Linwood onslip - Closure
-
26th of August 2025, 8:00pm27th of August 2025, 6:00amA737 SB St James IC to Linclive IC - Closure
-
26th of August 2025, 8:00pm27th of August 2025, 6:00amA737 SB Linclive IC to Barrochan IC offslip Closure
-
26th of August 2025, 8:00pm27th of August 2025, 6:00amA737 NB - Linwood to M8 Jct 28a on slip - Slip Closure
-
26th of August 2025, 8:00pm27th of August 2025, 6:00amA737 NB - Linwood on slip - Slip closure
-
26th of August 2025, 8:00pm27th of August 2025, 6:00amA737 NB St James off slip - Slip closure
-
26th of August 2025, 8:00pm27th of August 2025, 6:00amM8 EB J28a to J27 - L1 closure
-
26th of August 2025, 8:00pm27th of August 2025, 6:00amM8 EB J28 on slip - Slip closure
-
26th of August 2025, 8:00pm27th of August 2025, 6:00amM8 EB J27 off slip- slip closure
-
26th of August 2025, 8:30pm29th of August 2025, 6:00amM8 WB Junction 4 Whitburn to 4A Off-Slip
-
26th of August 2025, 8:30pm29th of August 2025, 6:00amM8 WB Junction 4A Off-Slip
-
26th of August 2025, 8:30pm29th of August 2025, 6:00amM8 WB Junction 4 On-Slip
-
27th of August 2025, 8:00am27th of August 2025, 5:00pmA9 Crossgates- Signage only- S/B
-
27th of August 2025, 9:30am10th of September 2025, 3:30pmA96 Nairn TTL W/B
-
27th of August 2025, 7:00pm29th of August 2025, 6:00amA83 Tayinloan - Convoy Works
-
27th of August 2025, 7:30pm30th of August 2025, 6:00amA1 - NB - Old Craighall Roundabout - Lane Closure
-
27th of August 2025, 8:00pm29th of August 2025, 6:00amM74 SB Jct 9 Off Slip - Slip Closure
-
27th of August 2025, 8:00pm28th of August 2025, 6:00amM8 EB J29 off slip to St James IC - Slip Closure
-
27th of August 2025, 8:00pm28th of August 2025, 6:00amM8 EB J29 onslip St James IC - Slip closure
-
27th of August 2025, 8:00pm28th of August 2025, 6:00amA737 NB Barrochan IC to Linwood IC - Lane Closure
-
27th of August 2025, 8:00pm28th of August 2025, 6:00amA737 NB Kilbarchan IC on slip - Slip Closure
-
27th of August 2025, 8:00pm28th of August 2025, 6:00amA737 NB Barrochan IC On slip Johnstone - Slip Closure
-
27th of August 2025, 8:00pm28th of August 2025, 6:00amA737 NB Barrochan IC Offslip Johnstone -Slip Closure
-
27th of August 2025, 8:00pm28th of August 2025, 6:00amA737 NB Linclive IC Offslip Linwood - Slip Closure
-
27th of August 2025, 8:00pm28th of August 2025, 6:00amA737 SB Linclive Interchange to Kilbarchan Rd- Lane Closure
-
27th of August 2025, 8:00pm28th of August 2025, 6:00amA737 SB Linclive IC onslip linwood - Slip Closure
-
27th of August 2025, 8:00pm28th of August 2025, 6:00amA737 SB Barrochan IC onslip Johnstone - Slip Closure
-
27th of August 2025, 8:00pm28th of August 2025, 6:00amA737 SB Barrochan IC offslip Johnstone - Slip Closure
-
27th of August 2025, 8:00pm28th of August 2025, 6:00amA737 SB Kilbarchan IC off slip - Slip Closure
-
27th of August 2025, 8:30pm30th of August 2025, 6:00amA1 - NB - Old Craighall Offslip - Road Closure
-
27th of August 2025, 8:30pm30th of August 2025, 6:00amA1 - NB - Old Craighall Mainline - Road Closure
-
27th of August 2025, 8:30pm30th of August 2025, 6:00amA1 - SB - Old Craighall SB Offslip - Lane Closure
-
27th of August 2025, 8:30pm30th of August 2025, 6:00amA720 - EB - Old Craighall Approach - Lane Closure
-
27th of August 2025, 8:30pm30th of August 2025, 6:00amA1 - SB - Old Craighall Approach - Lane Closure
-
28th of August 2025, 8:00pm29th of August 2025, 6:00amA8 WB - M8 J31 to Woodhall Rbt - Lane Closures
-
28th of August 2025, 8:00pm29th of August 2025, 6:00amM8 WB onslip from J31 - Lane Closure
-
28th of August 2025, 8:00pm29th of August 2025, 6:00amA8 WB Greenock Road Woodhall Rbt to Newark Rbt - Road Closure
-
28th of August 2025, 8:00pm29th of August 2025, 6:00amA8 WB, Parklea Rd on slip - Slip Closure
-
28th of August 2025, 8:00pm29th of August 2025, 6:00amA8 WB, Parklea Rd off slip - Slip Closure
-
28th of August 2025, 8:00pm29th of August 2025, 6:00amA8 B789 WB Langbank off slip -Slip Closure
-
28th of August 2025, 8:00pm29th of August 2025, 6:00amA8 WB Langbank on slip - Slip Closure
-
28th of August 2025, 8:00pm29th of August 2025, 6:00amA8 EB Greenock Road - Newark Rbt to Woodhall Rbt - Road closure
-
28th of August 2025, 8:00pm29th of August 2025, 6:00amA8 EB Greenock Road - Woodhall Rbt to West Ferry IC - Lane Closure
-
28th of August 2025, 8:00pm29th of August 2025, 6:00amM8 EB - JCT 31 off slip - lane closures
-
28th of August 2025, 8:00pm29th of August 2025, 6:00amA8 WB Greenock Rd Port Glasgow - Mobile Lane Closure
-
28th of August 2025, 8:00pm29th of August 2025, 6:00amA8 EB Greenock Rd Port Glasgow - Mobile Lane Closure
-
28th of August 2025, 8:00pm29th of August 2025, 6:00amM8 WB Jct 31 Westferry Offslip - Closure
-
28th of August 2025, 8:00pm29th of August 2025, 6:00amM8 EB Jct 31 Westferry on slip to M8 EB - Closure
-
28th of August 2025, 10:00pm29th of August 2025, 6:00amA78 NB Shore Rd, Wemyss Bay - Road Closure
-
28th of August 2025, 10:00pm29th of August 2025, 6:00amA78 SB Shore Rd, Wemyss Bay - Road Closure
-
28th of August 2025, 10:00pm29th of August 2025, 6:00amA78 NB Wemyss Bay to A8 EB Port Glasgow - Route part of diversion
-
28th of August 2025, 10:00pm29th of August 2025, 6:00amA8 WB Port Glasgow to A78 SB Wemyss Bay - Route part of diversion
-
28th of August 2025, 10:00pm29th of August 2025, 6:00amA737 SB Johnstone to Beith - Route part of diversion
-
28th of August 2025, 10:00pm29th of August 2025, 6:00amA737 NB Beith to Johnstone - Route part of diversion
-
28th of August 2025, 10:00pm29th of August 2025, 6:00amA78 NB Largs to Wemyss Bay - Route part of diversion
-
28th of August 2025, 10:00pm29th of August 2025, 6:00amA78 SB Largs to Wemyss Bay - Route part of diversion
-
29th of August 2025, 9:30am29th of August 2025, 3:30pmA78 SB St Phillans to Netherhall - Route part of Diversion
-
29th of August 2025, 9:30am29th of August 2025, 3:30pmA78 NB St Phillans to Netherhall - Route part of Diversion
-
29th of August 2025, 7:00pm30th of August 2025, 5:00amA83 Rhunahaorine North of Tayinloan - Convoy Works
-
29th of August 2025, 8:00pm30th of August 2025, 6:00amA726 GSO - Maidenhill to Belle Craig Roundabout total eb closure
-
30th of August 2025, 12:30pm30th of August 2025, 2:30pmA85 Oban - Event Road Closure
-
31st of August 2025, 7:00pm4th of September 2025, 6:00amA9 Approaching Inveralmond Rnbt Perth SB - Convoy Works
-
31st of August 2025, 7:00pm9th of September 2025, 7:00amA87 Bun Loyne WB - Road Closure
-
31st of August 2025, 7:00pm9th of September 2025, 7:00amA87 Bun Loyne EB - Road Closure
-
31st of August 2025, 7:00pm13th of September 2025, 5:00amA83 Kilkenzie to Westport North of Campbeltown SB - Road Closure with Amnesties
-
31st of August 2025, 7:00pm13th of September 2025, 5:00amA83 Kilkenzie to Westport North of Campbeltown NB - Road Closure with Amnesties
-
31st of August 2025, 7:30pm10th of October 2025, 6:30amA90 St Madoes to Glendoick - Lane Closure N/B
-
31st of August 2025, 7:30pm10th of October 2025, 6:30amA90 St Madoes to Glendoick - Lane Closure S/B
-
1st of September 2025, 7:00am12th of September 2025, 7:00pmA82 Inveruglas NB - TTL
-
1st of September 2025, 7:00am12th of September 2025, 7:00pmA82 Inveruglas SB - TTL
-
1st of September 2025, 7:00am26th of September 2025, 7:00pmA9 Drumochter SB - Lane Closure
-
1st of September 2025, 7:00am21st of December 2025, 7:00pmA9 River Spey Bridge North of Kingussie NB - TTL
-
1st of September 2025, 7:00am21st of December 2025, 7:00pmA9 River Spey Bridge North of Kingussie SB - TTL
-
1st of September 2025, 7:00am26th of September 2025, 7:00pmA87 Drumuie Borve WB - TTL
-
1st of September 2025, 7:00am26th of September 2025, 7:00pmA87 Drumuie Borve EB - TTL
-
1st of September 2025, 8:00am3rd of September 2025, 6:00pmA78 SB Ardrossan Road/Kinnin Brae Seamill TTLS
-
1st of September 2025, 8:00am3rd of September 2025, 6:00pmA78 NB Ardrossan Road/Kinnin Brae Seamill TTLS
-
1st of September 2025, 8:00am12th of September 2025, 5:00pmA78 Irvine Rd Largs SB - TTLS
-
1st of September 2025, 8:00am12th of September 2025, 5:00pmA78 Irvine Rd Largs NB - TTLS
-
1st of September 2025, 8:00am3rd of October 2025, 6:00pmA82 Glen Falloch Inverarnan NB - TTL
-
1st of September 2025, 8:00am3rd of October 2025, 6:00pmA82 Glen Falloch Inverarnan SB - TTL
-
1st of September 2025, 8:00am1st of September 2025, 6:00pmA9 Faskally to Ballinluig SB - Diverion Signage
-
1st of September 2025, 8:00am1st of September 2025, 6:00pmA9 Faskally to Ballinluig NB - Diverion Signage
-
1st of September 2025, 9:00am4th of September 2025, 5:00pmA95 Haughs Road, Keith - TTL's
-
1st of September 2025, 9:00am1st of September 2025, 4:00pmA86 Biallidbeg West of Newtonmore - Stop/Go Works
-
1st of September 2025, 9:30am1st of September 2025, 3:30pmA78 Skelmorlie NB - TTLS
-
1st of September 2025, 9:30am1st of September 2025, 3:30pmA78 Skelmorlie SB - TTLS
-
1st of September 2025, 9:30am1st of September 2025, 3:30pmA77 Main Rd Kirkoswald SB - TTLS
-
1st of September 2025, 9:30am1st of September 2025, 3:30pmA77 Main Rd Kirkoswald NB - TTLS
-
1st of September 2025, 9:30am1st of September 2025, 3:30pmA78 Castle Kennedy to Glenluce EB - Road As Part Of Diversion
-
1st of September 2025, 9:30am1st of September 2025, 3:30pmA78 Castle Kennedy to Glenluce WB - Road As Part Of Diversion
-
1st of September 2025, 7:00pm30th of September 2025, 7:00amA9 Jubilee Bridge North of Dunkeld NB - TTL
-
1st of September 2025, 7:00pm30th of September 2025, 7:00amA9 Jubilee Bridge North of Dunkeld SB - TTL
-
1st of September 2025, 7:30pm13th of September 2025, 6:00amA1 - SB - Old Craighall to River Esk - Road Closure
-
1st of September 2025, 7:30pm13th of September 2025, 6:00amA1 - SB - Old Craighall Offslip - Road Closure
-
1st of September 2025, 7:30pm13th of September 2025, 6:00amA1 - SB - Old Craighall Onslip - Road Closure
-
1st of September 2025, 7:30pm20th of September 2025, 6:00amA7-NB-South of Canonbie-Road Closure
-
1st of September 2025, 7:30pm20th of September 2025, 6:00amA7-SB-South of Canonbie-Road Closure
-
1st of September 2025, 8:00pm2nd of September 2025, 6:00amA726 GSO - Belle Craig to Philipshill EB Total closure
-
1st of September 2025, 8:00pm2nd of September 2025, 6:00amM9 WB Jct 1 to 1A. Closure
-
1st of September 2025, 8:00pm2nd of September 2025, 6:00amM8 EB J26 to J24 - Lane Closure
-
1st of September 2025, 8:00pm2nd of September 2025, 6:00amM8 EB J26 off slip - Slip Closure
-
1st of September 2025, 8:00pm2nd of September 2025, 6:00amM8 EB J25 off slip - Slip Closure
-
1st of September 2025, 8:00pm2nd of September 2025, 6:00amM8 EB J24 off slip - Slip Closure
-
1st of September 2025, 8:00pm2nd of September 2025, 6:00amM8 EB J26 on slip - Slip Closure
-
1st of September 2025, 8:00pm2nd of September 2025, 6:00amM8 EB J25a on slip - Slip Closure
-
1st of September 2025, 8:00pm2nd of September 2025, 6:00amM8 EB J25 on slip - Slip Closure
-
1st of September 2025, 8:00pm2nd of September 2025, 6:00amM8 WB J15 on slip from Springburn Expressway - Slip Closure
-
1st of September 2025, 8:00pm2nd of September 2025, 6:00amM8 WB J15 to J16 - Lane Closure
-
1st of September 2025, 8:00pm2nd of September 2025, 6:00amM80 SB Jct 1 Link Road to M8 WB - Closure
-
1st of September 2025, 8:00pm2nd of September 2025, 6:00amM8 WB Jct 13 to Jct 15 - Lane 1 & 2 Closure
-
1st of September 2025, 8:00pm2nd of September 2025, 6:00amM8 WB Jct 15 offslip to Stirling Road - Slip Closure
-
1st of September 2025, 8:30pm3rd of September 2025, 6:00amM8 - EB - Jct 6 on slip - Road Clsoure
-
1st of September 2025, 8:30pm3rd of September 2025, 6:00amM8 - EB - Jct 6 - 5 - Road Clsoure
-
1st of September 2025, 8:30pm3rd of September 2025, 6:00amM8 - EB - Jct 5 off slip - Closure
-
1st of September 2025, 8:30pm18th of September 2025, 6:00amM8 - WB - Jct 2 to Jct 3 - Road Closure
-
1st of September 2025, 8:30pm18th of September 2025, 6:00amM8 - WB - Junction 2 WB On-slip - Road Closure
-
2nd of September 2025, 8:00am4th of September 2025, 5:00pmA9 Aberuthven, Perth- Diversion signage N/B
-
2nd of September 2025, 8:00pm3rd of September 2025, 6:00amM8 WB Jct 24 - 25 - Lane Closure
-
2nd of September 2025, 8:00pm3rd of September 2025, 6:00amM8 WB Jct 24 on slip from Helen Street -Slip Closure
-
2nd of September 2025, 8:00pm3rd of September 2025, 6:00amM8 WB Junction 25 Off Slip - Slip Closure
-
2nd of September 2025, 8:00pm3rd of September 2025, 6:00amM8 WB Jct 25 to Jct 26 - Lane Closure
-
2nd of September 2025, 8:00pm3rd of September 2025, 6:00amM8 WB Jct 25 On Slip - Slip Closure
-
2nd of September 2025, 8:00pm3rd of September 2025, 6:00amM8 WB Jct 25a Offslip To Braehead - Slip Closure
-
2nd of September 2025, 8:00pm3rd of September 2025, 6:00amM8 WB Jct 26 Offslip - Slip Closure
-
2nd of September 2025, 8:00pm3rd of September 2025, 6:00amA737 SB Kilbarchan IC to Howwood Road Closure
-
2nd of September 2025, 8:00pm3rd of September 2025, 6:00amA737 NB Howwood to Kilbarchan IC Road Closure
-
2nd of September 2025, 8:00pm5th of September 2025, 6:00amA726 GSO - Philipshill to Belle Craig WB total closure
-
2nd of September 2025, 8:00pm3rd of September 2025, 6:00amM9 WB Jct 1 on-slip. Closure.
-
2nd of September 2025, 8:00pm5th of September 2025, 6:00amM9 WB Jct 1A off-slip. Closure.
-
2nd of September 2025, 8:00pm5th of September 2025, 6:00amM90 SB Jct 1 to M9 Jct 1A WB. Closure
-
2nd of September 2025, 8:00pm5th of September 2025, 6:00amM9 WB Jct 1B off-slip. Closure
-
2nd of September 2025, 8:00pm5th of September 2025, 6:00amM9 WB Jct 1A to Jct 4 . Closure
-
2nd of September 2025, 8:00pm5th of September 2025, 6:00amM9 WB Jct 1B on-slip . Closure
-
2nd of September 2025, 8:00pm5th of September 2025, 6:00amM9 WB Jct 2 on-slip . Closure
-
2nd of September 2025, 8:00pm5th of September 2025, 6:00amM9 WB Jct 4 off-slip . Closure
-
2nd of September 2025, 8:00pm5th of September 2025, 6:00amM9 WB Jct 3 off-slip . Closure
-
3rd of September 2025, 6:00am16th of September 2025, 6:00pmA85 Gilmerton to Tibbermore - Diversion Signage
-
3rd of September 2025, 8:00am4th of September 2025, 6:00pmA92 Tay Bridge- Signage only- N/B
-
3rd of September 2025, 9:00am3rd of September 2025, 4:00pmA86 Creagdhu East of Balgowan - Stop/Go Works
-
3rd of September 2025, 9:30am5th of September 2025, 3:30pmA85 Dollerie Terrace to Leadenflower Street Crieff - Diversion Signage
-
3rd of September 2025, 7:00pm11th of September 2025, 6:00amA86 Monessie East of Roybridge EB - Road Closure with Amnesties
-
3rd of September 2025, 7:00pm11th of September 2025, 6:00amA86 Monessie East of Roybridge WB - Road Closure with Amnesties
-
3rd of September 2025, 8:00pm4th of September 2025, 6:00amM8 EB Jct 24 to Jct 22 - Lane Closure
-
3rd of September 2025, 8:00pm4th of September 2025, 6:00amM8 EB Jct 24 on slip from Helen Street - Slip Closure
-
3rd of September 2025, 8:00pm4th of September 2025, 6:00amM8 EB Jct 23 on slip from Dumbreck Road - Slip Closure
-
3rd of September 2025, 8:00pm4th of September 2025, 6:00amM8 EB Jct 22 to M74 Jct 1 - Closure
-
3rd of September 2025, 8:00pm4th of September 2025, 6:00amM8 EB Jct 22 to Jct 20 - Lane 1 Closure
-
3rd of September 2025, 8:00pm4th of September 2025, 6:00amM8 EB Jct 22 off slip Seaward St - Slip Closure
-
3rd of September 2025, 8:00pm4th of September 2025, 6:00amM8 WB Jct 22 Seward Street- Slip Closure
-
3rd of September 2025, 8:00pm4th of September 2025, 6:00amM8 WB Jct 22 link Road to M77 Merge - Lane 1 Closure
-
3rd of September 2025, 8:00pm4th of September 2025, 6:00amM80 SB J2 off slip - Slip Closure
-
3rd of September 2025, 8:00pm4th of September 2025, 6:00amM80 NB J2 on slip - Slip Closure
-
3rd of September 2025, 8:00pm4th of September 2025, 6:00amM80 SB J2 on slip - Slip Closure
-
3rd of September 2025, 8:00pm4th of September 2025, 6:00amM80 SB J1 off slip - Slip Closure
-
3rd of September 2025, 8:00pm4th of September 2025, 6:00amM8 WB Jct 26 on slip from Hillington IC - Slip Closure
-
3rd of September 2025, 8:00pm4th of September 2025, 6:00amM9 - EB - Junction 4 to 3 - Road Closure
-
3rd of September 2025, 8:00pm4th of September 2025, 6:00amM9 - WB - Junction 3 to 4 - Road Closure
-
4th of September 2025, 12:00am6th of September 2025, 11:59pmA77 Meiklewood to Turnberry - Airshow Embargo
-
4th of September 2025, 12:00am6th of September 2025, 11:59pmA77 Meiklewood to Turnberry - Airshow Embargo
-
4th of September 2025, 12:00am6th of September 2025, 11:59pmA78 Eglinton to Dutchhouse - Airshow Embargo
-
4th of September 2025, 12:00am6th of September 2025, 11:59pmA78 Eglinton to Dutchhouse - Airshow Embargo
-
4th of September 2025, 8:00pm5th of September 2025, 6:00amM8 EB Jct 18 onslip from Charing Cross - Closure
-
4th of September 2025, 8:00pm5th of September 2025, 6:00amM8 EB Jct 16 onslip from Craighall Closure
-
4th of September 2025, 8:00pm5th of September 2025, 6:00amM8 EB Jct 15 onslip from Castle Street - Closure
-
4th of September 2025, 8:00pm5th of September 2025, 6:00amM8 EB Jct 15 onslip from Stirling Road - Closure
-
4th of September 2025, 8:00pm5th of September 2025, 6:00amM8 EB Jct 15 offslip to Springburn Expressway - Closure
-
4th of September 2025, 8:00pm5th of September 2025, 6:00amM8 EB Jct 14 offslip to Viewpark Avenue - Closure
-
4th of September 2025, 8:00pm5th of September 2025, 6:00amM8 EB Jct 18 to Jct 13 - Lane Closure
-
4th of September 2025, 8:00pm5th of September 2025, 6:00amM8 EB Jct 13 Link Road to M80 NB Jct 2 - Closure
-
4th of September 2025, 8:00pm5th of September 2025, 6:00amM80 NB Jct 1 on slip from Blochairn Road - Slip Closure
-
4th of September 2025, 8:00pm5th of September 2025, 6:00amM80 NB Jct 2 offslip to Robroyston Link Road - Slip Closure
-
4th of September 2025, 8:00pm5th of September 2025, 6:00amM8 WB Jct 21 onslip from Carnoustie St on slip - Slip Closure
-
4th of September 2025, 8:00pm5th of September 2025, 6:00amM8 WB Jct 21 to Jct 22 Lane 3 & 4 Closure
-
4th of September 2025, 8:00pm5th of September 2025, 6:00amM8 WB M74 Jct 1 - 22 Sec Cway - Closure
-
4th of September 2025, 8:00pm5th of September 2025, 6:00amM8 WB Jct 23 offslip to Dumbreck Road - Slip Closure
-
4th of September 2025, 8:00pm5th of September 2025, 6:00amM8 WB Jct 24 Offslip to Helen Street - Slip Closure
-
4th of September 2025, 8:00pm5th of September 2025, 6:00amM8 WB Jct 22 - HS Closure
-
4th of September 2025, 8:00pm5th of September 2025, 6:00amM9 - WB - Junction 3 to 4 - lane closure
-
4th of September 2025, 8:00pm5th of September 2025, 6:00amM9 - EB - Junction 4 to 3 - lane closure
-
5th of September 2025, 8:00am7th of September 2025, 5:00pmA96 Church Rd, Keith. W/B TTL's
-
5th of September 2025, 8:00pm11th of September 2025, 6:00amA726 GSO - Belle Craig to Maidenhill
-
5th of September 2025, 8:00pm6th of September 2025, 6:00amM8 WB Jct 15 on slip from Stirling Rd - Slip Closure
-
5th of September 2025, 8:00pm6th of September 2025, 6:00amM8 WB Jct 15 to Jct 18 offside and adjacent - Lane Closures
-
5th of September 2025, 8:00pm6th of September 2025, 6:00amM8 WB Jct 17 offslip - Slip Closure
-
5th of September 2025, 8:00pm6th of September 2025, 6:00amM8 EB Jct 17 onslip from A82 Great Western Road - Slip Closure
-
5th of September 2025, 8:00pm6th of September 2025, 6:00amM8 EB Prior to Jct 17 on slip to Jct 15 - OSL Closure
-
5th of September 2025, 8:00pm6th of September 2025, 6:00amM8 EB Jct 15 off slip to Stirling Road/Castle Street - Slip Closure
-
5th of September 2025, 8:00pm6th of September 2025, 6:00amM77 NB Jct 1 to M8 Jct 22- Road Closure
-
5th of September 2025, 8:00pm6th of September 2025, 6:00amM77 NB Jct 1 onslip from Dumbreck Road - Slip Closure
-
5th of September 2025, 8:00pm6th of September 2025, 6:00amM77 NB Link Road to M8 EB Jct 22 - Closure
-
5th of September 2025, 8:00pm6th of September 2025, 6:00amM77 NB Jct 1 to M8 EB sec c/way- Closure
-
5th of September 2025, 8:00pm6th of September 2025, 6:00amA78 SB Inverkip Road - Lane Closures
-
5th of September 2025, 8:00pm6th of September 2025, 6:00amA78 NB Inverkip Road - Lane Closures
-
5th of September 2025, 8:00pm8th of September 2025, 6:00amM9 - EB - Newbridge - Hard Shoulder Closure
-
5th of September 2025, 8:00pm8th of September 2025, 6:00amM9 - WB - Newbridge - Hard Shoulder Closure
-
5th of September 2025, 8:00pm6th of September 2025, 6:00amM9 WB Jct 4 to Jct 5 . Closure
-
5th of September 2025, 8:00pm6th of September 2025, 6:00amM9 WB Jct 4 on-slip. Closure
-
5th of September 2025, 8:00pm6th of September 2025, 6:00amM9 WB Jct 5 off-slip. Closure
-
7th of September 2025, 7:00am15th of September 2025, 7:00pmA86 Laggan - Convoy Works
-
7th of September 2025, 7:00pm10th of September 2025, 7:00amA828 Lettermore South of Ballachulish SB - Road Closure with Amnesties
-
7th of September 2025, 7:00pm10th of September 2025, 7:00amA828 Lettermore South of Ballachulish NB - Road Closure with Amnesties
-
8th of September 2025, 7:00am15th of November 2025, 6:00amA78 Main Rd @ Fairlie Parish Church SB - TTLS
-
8th of September 2025, 7:00am15th of November 2025, 6:00amA78 Main Rd @ Fairlie Parish Church NB - TTLS
-
8th of September 2025, 8:00am30th of January 2026, 6:00pmA95 Aberlour NB - Temporary traffic signals
-
8th of September 2025, 9:30am8th of September 2025, 6:00pmA84 Stirling Rd Callander SB - TTL
-
8th of September 2025, 9:30am8th of September 2025, 6:00pmA84 Stirling Rd Callander NB - TTL
-
8th of September 2025, 8:00pm9th of September 2025, 6:00amM8 WB J11 off slip - Slip Closure
-
8th of September 2025, 8:00pm9th of September 2025, 6:00amM8 WB J12 off slip - Slip Closure
-
8th of September 2025, 8:00pm9th of September 2025, 6:00amM8 WB J13 off slip - Slip Closure
-
8th of September 2025, 8:00pm9th of September 2025, 6:00amM8 WB J12 to J13 - Lane Closure
-
8th of September 2025, 8:00pm9th of September 2025, 6:00amM8 WB J11 on slip - Slip Closure
-
8th of September 2025, 8:00pm9th of September 2025, 6:00amM8 WB J12 on slip - Slip Closure
-
8th of September 2025, 8:00pm9th of September 2025, 6:00amM8 EB J13 onslip - Slip Closure
-
8th of September 2025, 8:00pm9th of September 2025, 6:00amM8 EB J13 to J12 - Lane Closure
-
8th of September 2025, 8:00pm9th of September 2025, 6:00amM8 EB J12 off slip - Slip Closure
-
8th of September 2025, 8:00pm9th of September 2025, 6:00amM8 EB J11 off slip - Slip Closure
-
8th of September 2025, 8:00pm9th of September 2025, 6:00amM8 EB J11 on slip - Slip Closure
-
8th of September 2025, 8:00pm9th of September 2025, 6:00amM8 EB J10 off slip - Slip Closure
-
8th of September 2025, 8:00pm9th of September 2025, 6:00amM8 WB J29 off slip to St James IC - Slip Closure
-
8th of September 2025, 8:00pm9th of September 2025, 6:00amM8 WB J29 on slip St James IC - Slip Closure
-
8th of September 2025, 8:00pm10th of September 2025, 6:00amM9 WB Jct 5 to Jct 7. Closure
-
8th of September 2025, 8:00pm10th of September 2025, 6:00amM9 WB Jct 5 on-slip. Closure
-
8th of September 2025, 8:00pm10th of September 2025, 6:00amM9 WB Jct 6 on-slip. Closure
-
8th of September 2025, 8:00pm10th of September 2025, 6:00amM9 WB Jct 7 off-slip. Closure
-
8th of September 2025, 8:00pm9th of September 2025, 6:00amM8 WB Jct 14 onslip from Viewpark - Slip Closure
-
9th of September 2025, 8:00am22nd of September 2025, 5:00pmA85 Comrie to Crieff - Diversion Signage
-
9th of September 2025, 9:30am9th of September 2025, 6:00pmA82 Kenneth St Inverness NB - TTL
-
9th of September 2025, 9:30am9th of September 2025, 6:00pmA82 Kenneth St Inverness SB - TTL
-
9th of September 2025, 8:00pm11th of September 2025, 6:00amM9 - SB - Jct 11 - Jct 9 - Closure
-
9th of September 2025, 8:00pm11th of September 2025, 6:00amM9 - SB - Jct 10 - Off Slip Closure
-
9th of September 2025, 8:00pm11th of September 2025, 6:00amM9 - NB - Jct 9 - Jct 11 - Closure
-
9th of September 2025, 8:00pm11th of September 2025, 6:00amM9 - NB - Jct 10- On Slip Closure
-
9th of September 2025, 8:00pm10th of September 2025, 6:00amA725 NB E Kilbride Expy Whirlies to Mavor merge - Road closure
-
9th of September 2025, 8:00pm10th of September 2025, 6:00amA725 NB C154 Stoneymeadow Rd onslip to A725 - Road closure
-
9th of September 2025, 8:00pm10th of September 2025, 6:00amA725 NB Mavor to Whirlies merge -Lane closure
-
9th of September 2025, 8:00pm10th of September 2025, 6:00amA725 NB Whirlies merge to Bothwell bridge - Lane closure
-
9th of September 2025, 8:00pm10th of September 2025, 6:00amA725 NB Hamilton rd off slip - Slip closure
-
9th of September 2025, 8:00pm10th of September 2025, 6:00amA725 NB Douglas st off slip - Slip closure
-
9th of September 2025, 8:00pm10th of September 2025, 6:00amA725 NB Douglas st on slip - Slip closure
-
9th of September 2025, 8:00pm10th of September 2025, 6:00amA725 NB Main St off slip - Slip closure
-
9th of September 2025, 8:00pm10th of September 2025, 6:00amA725 NB Main St on slip - Slip closure
-
9th of September 2025, 8:00pm10th of September 2025, 6:00amA725 NB Glasgow Road on slip - Slip closure
-
9th of September 2025, 8:00pm10th of September 2025, 6:00amA725 NB Craighead off slip - Slip closure
-
9th of September 2025, 8:00pm10th of September 2025, 6:00amA725 NB Craighead on slip - Slip closure
-
10th of September 2025, 7:00am23rd of September 2025, 7:00pmA82 Highbridge South of Spean Bridge - Convoy Works
-
10th of September 2025, 8:00pm11th of September 2025, 6:00amA725 SB Whistleberry to Whirlies slip - Lane Closure
-
10th of September 2025, 8:00pm11th of September 2025, 6:00amA725 SB Whistleberry Rd off slip - Slip Closure
-
10th of September 2025, 8:00pm11th of September 2025, 6:00amA725 SB Glasgow Rd on slip - Slip Closure
-
10th of September 2025, 8:00pm11th of September 2025, 6:00amA725 SB Main Street off slip - Slip Closure
-
10th of September 2025, 8:00pm11th of September 2025, 6:00amA725 SB Main Street on slip - Slip Closure
-
10th of September 2025, 8:00pm11th of September 2025, 6:00amA725 SB Douglas Street off slip - Slip Closure
-
10th of September 2025, 8:00pm11th of September 2025, 6:00amA725 SB Douglas Street on slip - Slip Closure
-
10th of September 2025, 8:00pm11th of September 2025, 6:00amA725 SB East Kilbride Expressway @ Whirlies off slip - Slip Closure
-
10th of September 2025, 8:00pm11th of September 2025, 6:00amA725 SB Whirlies Bypass to Whim Place on slip - Lane Closure
-
10th of September 2025, 8:00pm11th of September 2025, 6:00amM9 WB Jct 7 to Jct 8. Lane Closures
-
11th of September 2025, 9:30am11th of September 2025, 3:30pmA84 Kilmahog to Callander - Diversion Signage
-
11th of September 2025, 8:00pm12th of September 2025, 6:00amA726 Queensway - Philipshill to West Mains EB Total closure
-
11th of September 2025, 8:00pm12th of September 2025, 6:00amA82 NB Erskine to Dunglass - Lane Closures
-
11th of September 2025, 8:00pm12th of September 2025, 6:00amA82 NB off slip to Erskine Bridge - Slip Closure
-
11th of September 2025, 8:00pm12th of September 2025, 6:00amA898 off slip from Erskine Br to A82 NB - Slip Closure
-
11th of September 2025, 8:00pm12th of September 2025, 6:00amA82 NB Old Kilpatrick off slip - Slip Closure
-
11th of September 2025, 8:00pm12th of September 2025, 6:00amA82 NB Old Kilpatrick on slip - Slip Closure
-
11th of September 2025, 8:00pm16th of September 2025, 6:00amM9 WB Jct 8 to Jct 9. Closure.
-
11th of September 2025, 8:00pm12th of September 2025, 6:00amA82 SB Great Western Road from Dunglass Rbt to Erskine - Lane Closure
-
11th of September 2025, 8:00pm16th of September 2025, 6:00amM9 WB Jct 9 off-slip. Closure.
-
11th of September 2025, 8:00pm12th of September 2025, 6:00amA82 SB off slip to Erskine Bridge - Slip Closure
-
11th of September 2025, 8:00pm12th of September 2025, 6:00amA898 SB on slip to A82 SB Slip Closure
-
12th of September 2025, 8:00pm13th of September 2025, 6:00amM8 EB J30 Craigton off slip - Slip Closure
-
12th of September 2025, 8:00pm13th of September 2025, 6:00amM898 NB Craigton IC to Erskine Bridge - Lane Closure
-
12th of September 2025, 8:00pm13th of September 2025, 6:00amM898 NB off slip to A726 - Slip Closure
-
12th of September 2025, 8:00pm13th of September 2025, 6:00amM898 NB Spectacles on slip - Slip Closure
-
12th of September 2025, 8:00pm13th of September 2025, 6:00amM898 SB Old toll to Jct 30 slips - lane closure
-
12th of September 2025, 8:00pm13th of September 2025, 6:00amM898 SB A726 off slip safety coning
-
12th of September 2025, 8:00pm13th of September 2025, 6:00amM898 SB onslip from A726 Slip Closure
-
12th of September 2025, 8:00pm13th of September 2025, 6:00amM898 EB off slip to M8 Jct 30 Slip Closure
-
12th of September 2025, 8:00pm13th of September 2025, 6:00amM898 WB off slip to M8 Jct 31 Slip Closure
-
12th of September 2025, 8:00pm13th of September 2025, 6:00amM8 WB Jct 30 off slip Slip Closure
-
13th of September 2025, 8:30pm20th of September 2025, 6:00amM8 - EB - Jct 4 on slip - Closure
-
13th of September 2025, 8:30pm20th of September 2025, 6:00amM8 - WB - Jct 3a on slip - Closure
-
13th of September 2025, 8:30pm20th of September 2025, 6:00amM8 - EB - Jct 4 to 3A - Closure
-
13th of September 2025, 8:30pm20th of September 2025, 6:00amM8 - WB - Jct 3a to Jct 4 - Closure
-
13th of September 2025, 11:00pm16th of September 2025, 6:00amA76 Auchinleck SB - Road As Part Of Diversion
-
13th of September 2025, 11:00pm16th of September 2025, 6:00amA76 Auchinleck NB - Road As Part Of Diversion
-
14th of September 2025, 6:00am12th of October 2025, 4:00pmA1 - NB - Dunglass - Temp Lights
-
14th of September 2025, 6:00am12th of October 2025, 4:00pmA1 - SB - Dunglass - Temp Lights
-
14th of September 2025, 7:30pm24th of October 2025, 6:30amM90 Glenfarg to Kintillo- Lane Closure N/B
-
14th of September 2025, 7:30pm24th of October 2025, 6:30amM90 Glenfarg to Kintillo- Lane Closure S/B
-
14th of September 2025, 7:30pm30th of September 2025, 6:30amA95 Marypark, Nth of Bridge of Avon. N/B Convoy
-
14th of September 2025, 7:30pm30th of September 2025, 6:30amA90 Ellon. S/B Road closure
-
14th of September 2025, 7:30pm30th of September 2025, 6:30amA90 Ellon. N/B Road closure
-
15th of September 2025, 7:00am3rd of October 2025, 7:00pmA85 Glenogle WB - TTL
-
15th of September 2025, 7:00am3rd of October 2025, 7:00pmA85 Glenogle EB - TTL
-
15th of September 2025, 9:30am15th of September 2025, 3:30pmA76 SB Barburgh Mill -TTL's
-
15th of September 2025, 9:30am15th of September 2025, 3:30pmA76 NB Barburgh Mill -TTL's
-
15th of September 2025, 9:30am28th of September 2025, 3:30pmA9 Bankfoot to Ballinluig NB - Diversion Signage
-
15th of September 2025, 9:30am28th of September 2025, 3:30pmA9 Bankfoot to Ballinluig SB - Diversion Signage
-
15th of September 2025, 9:30am3rd of October 2025, 3:30pmA84 Drumviach to Burn of Cambus North of Doune SB - TTL
-
15th of September 2025, 9:30am3rd of October 2025, 3:30pmA84 Drumviach to Burn of Cambus North of Doune NB - TTL
-
15th of September 2025, 9:30am15th of September 2025, 3:30pmA85 Methven to Tibbermore - Diversion Signage
-
15th of September 2025, 8:00pm16th of September 2025, 6:00amM90 NB Jct 2A off slip - Slip Road Closure
-
15th of September 2025, 8:00pm16th of September 2025, 6:00amM74 SB Jct 7 to Jct 8 - Road closure
-
15th of September 2025, 8:00pm16th of September 2025, 6:00amM74 SB Jct 8 off slip - road closure
-
15th of September 2025, 8:00pm16th of September 2025, 6:00amM74 NB Jct 8 to Jct 7 Road Closure
-
15th of September 2025, 8:00pm16th of September 2025, 6:00amM74 NB Jct 8 on slip - Slip Closure
-
15th of September 2025, 8:00pm26th of September 2025, 4:30amM8- EB -on slip - Lane 1 closure
-
15th of September 2025, 10:00pm28th of September 2025, 10:00pmA90 Dundee to Longforgan Lane Closure S/B
-
15th of September 2025, 10:00pm20th of September 2025, 6:00amA90 Invergowrie Slips- Road Closure S/B
-
16th of September 2025, 8:00pm19th of September 2025, 6:00amM9 WB Jct 9 to Jct 10. Closure.
-
16th of September 2025, 8:00pm19th of September 2025, 6:00amM9 WB Jct 9 on-slip. Closure.
-
16th of September 2025, 8:00pm19th of September 2025, 6:00amM9 WB Jct 10 off-slip. Closure.
-
16th of September 2025, 8:00pm19th of September 2025, 6:00amM80 WB Jct 9 to M9. Closure.
-
16th of September 2025, 8:00pm17th of September 2025, 6:00amM90 SB - Road closure - Jct2 offslip from A92
-
16th of September 2025, 8:00pm19th of September 2025, 6:00amM9 WB Jct 9 to Jct 10. Closure.
-
16th of September 2025, 8:00pm19th of September 2025, 6:00amM9 WB Jct 9 on-slip. Closure.
-
16th of September 2025, 8:00pm19th of September 2025, 6:00amM9 WB Jct 10 off-slip. Closure.
-
16th of September 2025, 8:00pm19th of September 2025, 6:00amM80 WB Jct 9 to M9. Closure.
-
16th of September 2025, 8:00pm17th of September 2025, 6:00amM74 SB J1a off slip - Slip Closure
-
16th of September 2025, 8:00pm17th of September 2025, 6:00amM74 SB J1a onslip - Slip Closure
-
16th of September 2025, 8:00pm17th of September 2025, 6:00amM74 NB J2 off slip - Slip Closure
-
16th of September 2025, 8:00pm17th of September 2025, 6:00amM74 NB J2 on slip - Slip Closure
-
16th of September 2025, 8:00pm17th of September 2025, 6:00amM74 SB Jct 2a off slip Slip Closure
-
16th of September 2025, 8:00pm17th of September 2025, 6:00amM74 SB Jct 2a on slip Slip Closure
-
17th of September 2025, 8:00pm23rd of September 2025, 6:00amM8 Junction 4 On-Slip Westbound
-
17th of September 2025, 8:00pm23rd of September 2025, 6:00amM8 Junction 4 to Junction 4A Mainline Carriageway Westbound
-
17th of September 2025, 8:00pm23rd of September 2025, 6:00amM8 Junction 4A Off-Slip Westbound
-
17th of September 2025, 8:00pm18th of September 2025, 6:00amM74 SB Jct 6 combined slip from Motherwell Slip Closure
-
17th of September 2025, 8:00pm18th of September 2025, 6:00amM74 SB Jct 6 from Motherwell on slip - Slip Closure
-
17th of September 2025, 8:00pm18th of September 2025, 6:00amM74 NB Jct 6 from Motherwell on Slip - -Slip Closure
-
17th of September 2025, 8:00pm18th of September 2025, 6:00amM74 NB Jct 6 off slip Slip Closure
-
17th of September 2025, 8:00pm18th of September 2025, 6:00amM74 NB Jct 6 off slip to Hamilton Slip Closure
-
17th of September 2025, 8:00pm18th of September 2025, 6:00amM74 NB Jct 6 off slip to Motherwell Slip Closure
-
17th of September 2025, 8:00pm18th of September 2025, 6:00amM74 NB Jct 11 on slip- Slip Closure
-
17th of September 2025, 8:00pm18th of September 2025, 6:00amM74 NB Jct 10 off slip -Slip Closure
-
17th of September 2025, 8:00pm18th of September 2025, 6:00amM74 SB Jct 10 on slip - Slip Closure
-
17th of September 2025, 8:00pm18th of September 2025, 6:00amM74 SB Jct 11 off slip - Slip Closure
-
17th of September 2025, 8:00pm18th of September 2025, 6:00amM74 SB J7 off slip - Slip Closure
-
17th of September 2025, 8:00pm18th of September 2025, 6:00amM74 NB J7 on slip - Slip Closure
-
18th of September 2025, 8:00pm19th of September 2025, 6:00amM74 SB J9 off slip - Slip Closure
-
18th of September 2025, 8:00pm19th of September 2025, 6:00amM74 NB J3 off slip - Slip Closure
-
18th of September 2025, 8:00pm19th of September 2025, 6:00amM74 SB J3 on slip - Slip Closure
-
18th of September 2025, 8:00pm19th of September 2025, 6:00amA90 NB - Lane Closure - Jct 1
-
18th of September 2025, 8:00pm19th of September 2025, 6:00amA90 NB - PTL closure - Jct 1
-
18th of September 2025, 8:00pm19th of September 2025, 6:00amM74 Jct 6 On Slip NB from Hamilton - Slip Closure
-
18th of September 2025, 8:00pm19th of September 2025, 6:00amM74 Jct 6 NB from Hamilton to M74 - Slip Closure
-
18th of September 2025, 8:00pm19th of September 2025, 6:00amM74 Jct 6 SB from Hamilton to M74 - Slip Closure
-
18th of September 2025, 8:00pm19th of September 2025, 6:00amM74 Jct 6 Off Slip SB - Slip Closure
-
18th of September 2025, 8:00pm19th of September 2025, 6:00amM74 Jct 6 off slip to Hamilton SB - Slip Closure
-
18th of September 2025, 8:00pm19th of September 2025, 6:00amM74 Jct 6 off slip to Motherwell SB - Slip Closure
-
19th of September 2025, 8:00pm20th of September 2025, 6:00amM74 NB J10 to J8 - Road Closure
-
19th of September 2025, 8:00pm20th of September 2025, 6:00amM74 NB J10 on slip - Slip Closure
-
19th of September 2025, 8:00pm20th of September 2025, 6:00amM74 NB J8 off slip - Slip Closure
-
19th of September 2025, 8:00pm20th of September 2025, 6:00amM74 SB J8 to J10 - Road Closure
-
19th of September 2025, 8:00pm20th of September 2025, 6:00amM74 SB J8 on slip - Slip Closure
-
19th of September 2025, 8:00pm20th of September 2025, 6:00amM74 SB J9 off slip - Slip Closure
-
19th of September 2025, 8:00pm23rd of September 2025, 6:00amM9 WB Jct 10 to Jct 11. Closure.
-
19th of September 2025, 8:00pm23rd of September 2025, 6:00amM9 WB Jct 10 on slip Closure.
-
21st of September 2025, 7:00pm25th of September 2025, 7:00amA87 Bun Loyne WB - Road Closure
-
21st of September 2025, 7:00pm25th of September 2025, 7:00amA87 Bun Loyne EB - Road Closure
-
22nd of September 2025, 8:00am26th of September 2025, 5:00pmA876 15 Haughs O'Airth
-
22nd of September 2025, 8:00am26th of September 2025, 5:00pmA876 15 Haughs O'Airth
-
22nd of September 2025, 6:30pm31st of October 2025, 6:30amA96 Huntly to Keith- TTL W/B
-
22nd of September 2025, 8:00pm23rd of September 2025, 6:00amM74 SB J2 off slip - Slip Closure
-
22nd of September 2025, 8:00pm23rd of September 2025, 6:00amM74 SB J2 on slip - Slip Closure
-
22nd of September 2025, 8:00pm23rd of September 2025, 6:00amM74 NB J1a off slip - Slip Closure
-
22nd of September 2025, 8:00pm23rd of September 2025, 6:00amM74 NB J1a on slip - Slip Closure
-
22nd of September 2025, 8:00pm23rd of September 2025, 6:00amM74 NB J2a on slip - Slip Closure
-
22nd of September 2025, 8:00pm23rd of September 2025, 6:00amM74 NB 2a off slip - Slip Closure
-
22nd of September 2025, 8:00pm23rd of September 2025, 6:00amM74 NB J1 off slip - Slip Closure
-
22nd of September 2025, 8:00pm23rd of September 2025, 6:00amM74 SB J1 on slip - Slip Closure
-
22nd of September 2025, 8:00pm23rd of September 2025, 6:00amM8 Kingston Br EB- Lane 1 closure
-
22nd of September 2025, 8:00pm25th of September 2025, 6:00amA1 - NB - North of Spott RBT - NB Closure
-
22nd of September 2025, 10:00pm25th of September 2025, 6:00amA90 Dundee to Longforgan Lane Closure N/B
-
22nd of September 2025, 10:00pm24th of September 2025, 6:00amA90 Longforgan off Slip- Road Closure N/B
-
23rd of September 2025, 8:00am23rd of September 2025, 6:00pmA985 - WB - Longannet Rbt to B9037 Jct - Off network
-
23rd of September 2025, 8:00am23rd of September 2025, 6:00pmA985 - EB - Longannet Rbt to B9037 Jct - Off network
-
23rd of September 2025, 8:00pm24th of September 2025, 6:00amM8 EB Approach to Kingston Br - Lane Closures
-
23rd of September 2025, 8:00pm24th of September 2025, 6:00amM8 WB on to Kingston Br - Lane Closure
-
23rd of September 2025, 8:00pm24th of September 2025, 6:00amM74 SB J1 off slip - Lane Closure
-
23rd of September 2025, 8:00pm24th of September 2025, 6:00amM8 Hillington Rbt inner - lane closure
-
23rd of September 2025, 8:00pm24th of September 2025, 6:00amM74 Jct 1 SB-Lane 2 closure
-
23rd of September 2025, 8:00pm24th of September 2025, 6:00amM74 Jct 1 NB-Lane 2 closure
-
23rd of September 2025, 8:00pm25th of September 2025, 6:00amM9 EB Jct 11 to Jct 10 Closure.
-
23rd of September 2025, 8:00pm25th of September 2025, 6:00amM9 EB Jct 11 to Jct 10 Closure.
-
23rd of September 2025, 8:30pm9th of October 2025, 6:00amM8 Jct3A - Jct2 Road Closure
-
23rd of September 2025, 8:30pm9th of October 2025, 6:00amM8 Jct3A EB Onslip - Slip Closure
-
23rd of September 2025, 8:30pm9th of October 2025, 6:00amM8 Jct3 EB Onslip - Road Closure
-
23rd of September 2025, 8:30pm9th of October 2025, 6:00amM8 Jct 3 Onslip - Road Closure
-
23rd of September 2025, 8:30pm9th of October 2025, 6:00amM8 Jct2 EB Onslip - Road Closure
-
23rd of September 2025, 10:00pm25th of September 2025, 6:00amA90 Longforgan on Slip- Road Closure N/B
-
24th of September 2025, 9:30am24th of September 2025, 3:30pmA76 Blackwood Auldgirth SB- TTL
-
24th of September 2025, 9:30am24th of September 2025, 3:30pmA76 Blackwood Auldgirth NB- TTL
-
24th of September 2025, 7:00pm3rd of October 2025, 7:00amA86 Roybridge WB - Road Closure with Amnesties
-
24th of September 2025, 7:00pm3rd of October 2025, 7:00amA86 Roybridge EB - Road Closure with Amnesties
-
25th of September 2025, 8:00am25th of September 2025, 6:00pmA85 Methven to Fowlis Wester - Diversion Signage
-
25th of September 2025, 7:00pm26th of September 2025, 7:00amA87 Feith Ghrianach East of Bun Loyne WB - Road Closure
-
25th of September 2025, 7:00pm26th of September 2025, 7:00amA87 Feith Ghrianach East of Bun Loyne EB - Road Closure
-
25th of September 2025, 7:30pm27th of September 2025, 6:00amA1 - NB - North of Cockburnspath - Road Closure
-
25th of September 2025, 7:30pm27th of September 2025, 6:00amA1 - SB - North of Cockburnspath - Road Closure
-
25th of September 2025, 8:00pm27th of September 2025, 6:00amM9 EB Jct 10 to Jct 9 Closure.
-
25th of September 2025, 8:00pm27th of September 2025, 6:00amM9 EB Jct 10 on slip Closure.
-
25th of September 2025, 8:00pm27th of September 2025, 6:00amM9 EB Jct 9 off slip Closure.
-
25th of September 2025, 8:00pm27th of September 2025, 6:00amM9 EB Jct 9 off slip to M80 Closure.
-
25th of September 2025, 10:00pm28th of September 2025, 10:00pmA90 Longforgan on Slip- Road Closure S/B
-
27th of September 2025, 10:30pm29th of September 2025, 6:30amA90 Glendoick to Grange. Diversion signage for local road closure
-
28th of September 2025, 9:30am28th of September 2025, 3:30pmA77 Glengall South Ayrshire SB- TTL
-
28th of September 2025, 9:30am28th of September 2025, 3:30pmA77 Glengall South Ayrshire NB- TTL
-
28th of September 2025, 7:00pm2nd of October 2025, 6:00amA82 Borelum Drumnadrochit SB - Road Closure with Amnesties
-
28th of September 2025, 7:00pm2nd of October 2025, 6:00amA82 Borelum Drumnadrochit NB - Road Closure with Amnesties
-
28th of September 2025, 8:00pm5th of April 2026, 6:00amA725 Southbound Diamond main line - Total closure
-
28th of September 2025, 8:00pm5th of April 2026, 6:00amA725 Northbound Daimond Main line - Offside lane closure
-
28th of September 2025, 8:00pm5th of April 2026, 6:00amA725 Northbound Diamond main line - Contraflow
-
28th of September 2025, 8:00pm5th of April 2026, 6:00amA725 Southbound Diamond Main line - Contraflow
-
29th of September 2025, 7:00am8th of November 2025, 7:00pmA82 Altura South of Letterfindlay NB - TTL
-
29th of September 2025, 7:00am8th of November 2025, 7:00pmA82 Altura South of Letterfindlay SB - TTL
-
29th of September 2025, 7:30pm1st of October 2025, 6:00amA1 - NB - Cedar Café - Road Closure
-
29th of September 2025, 7:30pm1st of October 2025, 6:00amA1 - SB - Cedar Café - Road Closure
-
29th of September 2025, 8:00pm1st of October 2025, 6:00amA90 S/B Glendoick - Lane Closures
-
29th of September 2025, 8:00pm1st of October 2025, 6:00amA90 S/B Glendoick - Slip Closure
-
29th of September 2025, 8:00pm2nd of October 2025, 6:00amM9 EB Jct 9 to Jct 7 Closure.
-
29th of September 2025, 8:00pm2nd of October 2025, 6:00amM9 EB Jct 9 on slip Closure.
-
29th of September 2025, 8:00pm2nd of October 2025, 6:00amM876 EB Jct 2 to M9 merge Closure.
-
29th of September 2025, 8:00pm2nd of October 2025, 6:00amM876 EB M9 merge to jct 3 Closure.
-
29th of September 2025, 8:00pm2nd of October 2025, 6:00amM876 EB jct 3 off slip Closure.
-
29th of September 2025, 9:00pm1st of October 2025, 6:00amA90 Longforgan SB - Lane closure
-
30th of September 2025, 8:00am3rd of October 2025, 6:00pmA96 Elgin to Alves WB - Diversion signage for local road closure
-
1st of October 2025, 7:00pm2nd of October 2025, 7:00amA82 Tyndrum - Convoy Works
-
1st of October 2025, 7:00pm8th of October 2025, 6:00amA835 Conon Bridge - Convoy Works
-
1st of October 2025, 7:00pm3rd of October 2025, 7:00amA87 Cluanie Inn Glen Moriston EB - Road Closure with Amnesties
-
1st of October 2025, 7:00pm2nd of October 2025, 5:00amA87 Braes Jnct East of Portree WB - Road Closure with Amnesties
-
1st of October 2025, 7:00pm2nd of October 2025, 5:00amA87 Braes Jnct East of Portree EB - Road Closure with Amnesties
-
1st of October 2025, 8:00pm4th of October 2025, 6:00amA720 - WB - Millerhill WB Onslip - Road Closure
-
1st of October 2025, 8:00pm4th of October 2025, 6:00amA720 - WB - Millerhill Mainline - Road Closure
-
1st of October 2025, 8:00pm4th of October 2025, 6:00amA68 - NB - Millerhill Junction - Lane Closure
-
1st of October 2025, 9:00pm4th of October 2025, 6:00amA90 Inchture SB - Lane closure
-
2nd of October 2025, 7:00pm10th of October 2025, 7:00amA82 Cattle Ranch South of Spean Bridge NB - Road Closure with Amnesties
-
2nd of October 2025, 7:00pm10th of October 2025, 7:00amA82 Cattle Ranch South of Spean Bridge SB - Road Closure with Amnesties
-
2nd of October 2025, 7:00pm3rd of October 2025, 7:00amA87 Cluanie Inn Glen Moriston WB - Road Closure with Amnesties
-
2nd of October 2025, 8:00pm3rd of October 2025, 6:00amM9 EB Jct 8 to Jct 7. Lane Closures.
-
3rd of October 2025, 8:00pm7th of October 2025, 6:00amM9 EB Jct 7 to Jct 6. Road Closure.
-
3rd of October 2025, 8:00pm7th of October 2025, 6:00amM876 EB Jct 3 to M9 EB Jct 7. Road Closure.
-
3rd of October 2025, 8:00pm7th of October 2025, 6:00amM9 EB Jct 6 off-slip. Road Closure.
-
5th of October 2025, 7:30pm24th of October 2025, 6:30amA9 Stockbridge- Lane Closure N/B
-
5th of October 2025, 7:30pm24th of October 2025, 6:30amA9 Stockbridge- Lane Closure S/B
-
6th of October 2025, 7:00am7th of November 2025, 7:00pmA82 Onich NB - TTL
-
6th of October 2025, 7:00am26th of December 2025, 7:00pmA82 Meeting of 3 Waters South of Glencoe NB - TTL
-
6th of October 2025, 7:00am7th of November 2025, 7:00pmA82 Onich SB - TTL
-
6th of October 2025, 7:00am26th of December 2025, 7:00pmA82 Meeting of 3 Waters South of Glencoe SB - TTL
-
6th of October 2025, 9:30am17th of October 2025, 3:30pmA84 Blair Drummond NB - TTL
-
6th of October 2025, 9:30am17th of October 2025, 3:30pmA84 Blair Drummond SB - TTL
-
6th of October 2025, 7:00pm11th of October 2025, 7:00amA87 Breakish East of Broadford WB - Road Closure with Amnesties
-
6th of October 2025, 7:00pm11th of October 2025, 7:00amA87 Breakish East of Broadford EB - Road Closure with Amnesties
-
6th of October 2025, 7:30pm23rd of October 2025, 6:00amA7-NB-South of Selkirk-Road closure
-
6th of October 2025, 7:30pm23rd of October 2025, 6:00amA7-SB-South of Selkirk-Road closure
-
6th of October 2025, 8:00pm8th of October 2025, 6:00amM8 WB Jct 9 to Jct 11 - Offside Lane Closure
-
6th of October 2025, 8:00pm8th of October 2025, 6:00amM8 EB Jct 12 to Jct 10 - Offside and Adjacent Lane Closures
-
6th of October 2025, 8:00pm8th of October 2025, 6:00amM9 - EB - Newbridge - Hard Shoulder Closure
-
6th of October 2025, 8:00pm9th of October 2025, 6:00amM9 - WB - Newbridge - Hard Shoulder Closure
-
6th of October 2025, 8:00pm7th of October 2025, 6:00amM8 Jct 27 onslip WB - Total Closure
-
6th of October 2025, 8:00pm7th of October 2025, 6:00amM8 Jct 27 to Jct 28 WB - Nearside Lane Closure
-
6th of October 2025, 8:00pm7th of October 2025, 6:00amM8 Jct 28 offslip WB - Total Closure
-
6th of October 2025, 8:00pm7th of October 2025, 6:00amM8 Jct 28 onslip EB - Total Closure
-
6th of October 2025, 8:00pm7th of October 2025, 6:00amM8 Jct 28 to Jct 27 EB - Nearside Lane Closure
-
6th of October 2025, 8:00pm7th of October 2025, 6:00amM8 Jct 27 offslip EB - Total Closure
-
6th of October 2025, 8:00pm7th of October 2025, 6:00amA737 Linwood onslip NB - Total Closure
-
6th of October 2025, 8:00pm7th of October 2025, 6:00amA737 Linwood to St James' NB - Nearside Lane Closure
-
6th of October 2025, 8:30pm9th of October 2025, 6:00amA720 - EB - Calder EB Onslip - Road Closure
-
6th of October 2025, 8:30pm9th of October 2025, 6:30amA720 - EB - Calder EB Mainline - Lane Closure
-
6th of October 2025, 8:30pm9th of October 2025, 6:00amA71 - WB - Calder Junction - Lane Closure
-
6th of October 2025, 9:00pm7th of October 2025, 6:00amA90 Errol NB - Lane closure
-
6th of October 2025, 9:00pm16th of October 2025, 6:00amA78 Irvine Rd Fairlie NB - TTLS
-
6th of October 2025, 9:00pm16th of October 2025, 6:00amA78 Irvine Rd Fairlie SB - TTLS
-
7th of October 2025, 8:00pm8th of October 2025, 6:00amM9 EB Jct 6-5. Road Closure.
-
7th of October 2025, 8:00pm8th of October 2025, 6:00amM9 EB Jct 5 off-slip. Road Closure.
-
7th of October 2025, 8:00pm8th of October 2025, 6:00amM8 Jct 11 onslip WB -Road Part of Diversion Route
-
7th of October 2025, 8:00pm8th of October 2025, 6:00amM8 Jct 11 onslip EB -Road Part of a Diversion Route
-
7th of October 2025, 9:00pm10th of October 2025, 6:00amA90 Kinfauns to St Madoes NB - Lane closure
-
8th of October 2025, 7:00pm16th of October 2025, 6:00amA835 Conon Bridge - Convoy Works
-
8th of October 2025, 7:30pm10th of October 2025, 6:00amM9 - SB - Jct 11 - Jct 9 - Closure
-
8th of October 2025, 7:30pm10th of October 2025, 6:00amM9 - SB - Jct 10 - Off Slip Closure
-
8th of October 2025, 7:30pm10th of October 2025, 6:00amM9 - NB - Jct 9 - Jct 11 - Closure
-
8th of October 2025, 7:30pm10th of October 2025, 6:00amM9 - SB - Jct 9 - Off Slip Closure
-
8th of October 2025, 7:30pm10th of October 2025, 6:00amM9 - NB - Jct 9- On Slip Closure
-
8th of October 2025, 8:00pm9th of October 2025, 6:00amM9 EB Jct 5 to Jct 2. Road Closure.
-
8th of October 2025, 8:00pm9th of October 2025, 6:00amM9 EB Jct 5 on-slip. Road Closure.
-
8th of October 2025, 8:00pm9th of October 2025, 6:00amM9 EB Jct 4 off-slip. Road Closure.
-
8th of October 2025, 8:00pm9th of October 2025, 6:00amM9 EB Jct 4 off-slip. Road Closure.
-
8th of October 2025, 8:00pm9th of October 2025, 6:00amM9 EB Jct 3 on-slip. Road Closure.
-
8th of October 2025, 8:00pm9th of October 2025, 6:00amM9 EB Jct off-slip. Road Closure.
-
8th of October 2025, 8:00pm9th of October 2025, 6:00amM80 SB slip to the M8 WB - Total Closure
-
8th of October 2025, 8:00pm9th of October 2025, 6:00amM8 Jct 27 onslip EB - Total Closure
-
8th of October 2025, 8:00pm9th of October 2025, 6:00amM8 Jct 12 onslip EB - Total Closure
-
8th of October 2025, 8:30pm18th of October 2025, 6:00amM8 EB Jct3A-3 - Road Closure
-
8th of October 2025, 8:30pm18th of October 2025, 6:00amM8 Jct3A EB Onslip - Road Clsoure
-
8th of October 2025, 8:30pm18th of October 2025, 6:00amM8 Jct3 EB Offslip - Road Closure
-
9th of October 2025, 7:30pm16th of October 2025, 6:00amA7-NB-North of Langholm-Road Closure
-
9th of October 2025, 7:30pm16th of October 2025, 6:00amA7-SB-North of Langholm-Road Closure
-
9th of October 2025, 8:00pm10th of October 2025, 6:00amM74 NB Jct 6 onslip from Hamilton - Total Closure
-
9th of October 2025, 8:00pm10th of October 2025, 6:00amM74 SB Jct 6 onslip from Hamilton - Total Closure
-
9th of October 2025, 8:00pm10th of October 2025, 6:00amM74 NB Jct 1a to Jct 1 - Hard Shoulder Closure
-
9th of October 2025, 8:00pm10th of October 2025, 6:00amM74 SB Jct 1 to Jct 1a - Hard Shoulder Closure
-
9th of October 2025, 8:00pm10th of October 2025, 6:00amM8 Jct 20 West St onslip EB - Total Closure
-
10th of October 2025, 6:00am10th of October 2025, 7:30pmA7-NB-North of Langholm-TTLs
-
10th of October 2025, 6:00am10th of October 2025, 7:30pmA7-SB-North of Langholm-TTLs
-
10th of October 2025, 8:00pm11th of October 2025, 6:00amM8 Jct 19 Stobcross onramp WB - Total Closure
-
10th of October 2025, 8:00pm11th of October 2025, 6:00amM8 Jct 19 Waterloo St onramp WB - Total Closure
-
10th of October 2025, 8:00pm11th of October 2025, 6:00amM8 Jct 20 West St offslip WB - Total Closure
-
10th of October 2025, 8:00pm11th of October 2025, 6:00amM8 Jct 19 to Jct 20 WB - Lane Closures
-
10th of October 2025, 8:00pm11th of October 2025, 6:00amM8 Jct 19 Newton St onslip WB - Total Closure
-
11th of October 2025, 12:01am19th of December 2025, 11:59pmA86 Murlaggan East of Roybridge EB - TTL
-
11th of October 2025, 12:01am19th of December 2025, 11:59pmA86 Murlaggan East of Roybridge WB - TTL
-
12th of October 2025, 7:00pm21st of October 2025, 7:00amA82 Loch Linnhe Picnic Area North of Corran NB - Road Closure with Amnesties
-
12th of October 2025, 7:00pm21st of October 2025, 7:00amA82 Loch Linnhe Picnic Area North of Corran SB - Road Closure with Amnesties
-
12th of October 2025, 7:00pm21st of October 2025, 6:00amA9 Roadside Georgemass NB - Road Closure with Amnesties
-
12th of October 2025, 7:00pm21st of October 2025, 6:00amA9 Roadside Georgemass SB - Road Closure with Amnesties
-
13th of October 2025, 7:00am17th of October 2025, 7:00pmA82 Abriachan North of Drumnadrochit NB - TTL
-
13th of October 2025, 7:00am17th of October 2025, 7:00pmA82 Abriachan North of Drumnadrochit SB - TTL
-
13th of October 2025, 7:00pm18th of October 2025, 7:00amA87 Glenvarragil South of Portree WB - Road Closure with Amnesties
-
13th of October 2025, 7:00pm18th of October 2025, 7:00amA87 Glenvarragil South of Portree EB - Road Closure with Amnesties
-
13th of October 2025, 7:30pm14th of October 2025, 6:00amM90 Bridge of Earn slip to Broxden Rbt. N/B off slip closure
-
13th of October 2025, 7:30pm14th of October 2025, 6:00amM90 Bridge of Earn to A912 Edinburgh Rd, Perth. N/B off Slip closure
-
13th of October 2025, 8:00pm15th of October 2025, 6:00amM9 EB Jct 2 to 1A Road Closure.
-
13th of October 2025, 8:00pm15th of October 2025, 6:00amM9 EB Jct 1B off slip Road Closure.
-
13th of October 2025, 8:00pm15th of October 2025, 6:00amM9 EB Jct 1B on slip Road Closure.
-
13th of October 2025, 8:00pm15th of October 2025, 6:00amM9 EB Jct 1A off slip Road Closure.
-
13th of October 2025, 8:00pm14th of October 2025, 6:00amM74 NB Jct 6 offslip to Hamilton - Total Closure
-
13th of October 2025, 8:00pm14th of October 2025, 6:00amM74 NB Jct 6 offslip to Motherwell - Total Closure
-
13th of October 2025, 8:00pm14th of October 2025, 6:00amM8 Jct 15 Loop U onslip WB - Total Closure
-
13th of October 2025, 8:00pm14th of October 2025, 6:00amM8 Jct 17 onslip WB - Total Closure
-
13th of October 2025, 8:00pm14th of October 2025, 6:00amM8 Jct 19 Argyle St offslip WB - Total Closure
-
13th of October 2025, 8:00pm14th of October 2025, 6:00amM8 Jct 15 Castle St offslip WB - Total Closure
-
13th of October 2025, 8:00pm18th of October 2025, 4:30amM8- EB Main line- Hard shoulder - After Jct2
-
13th of October 2025, 8:00pm14th of October 2025, 6:00amM8 Jct 15 to Jct 19 WB - Nearside and Adjacent lane closure
-
13th of October 2025, 8:00pm18th of October 2025, 4:30amM8 - EB Main line - Lane 1 closure - After Jct2
-
14th of October 2025, 7:30pm15th of October 2025, 6:30amM90 Broxden Rbt to Edinburgh S/B on slip. Slip closure
-
14th of October 2025, 8:00pm15th of October 2025, 6:00amM74 SB Jct 6 onslip from Motherwell - Total Closure
-
14th of October 2025, 8:00pm15th of October 2025, 6:00amM74 NB Jct 6 onslip from Motherwell - Total Closure
-
14th of October 2025, 8:00pm16th of October 2025, 6:00amM8 Jct 19 Anderston onslip EB - Total Closure
-
14th of October 2025, 8:00pm16th of October 2025, 6:00amM8 Jct 18 offslip to GWR/St Georges Rd EB - Total Closure
-
14th of October 2025, 8:00pm16th of October 2025, 6:00amM8 Jct 16 onslip EB - Total Closure
-
14th of October 2025, 8:00pm16th of October 2025, 6:00amM8 Jct 15 Springburn offslip EB - Total Closure
-
14th of October 2025, 8:00pm16th of October 2025, 6:00amM8 Jct 21 to 15 EB - Nearside and Adjacent Lane Closure
-
14th of October 2025, 8:00pm16th of October 2025, 6:00amM8 Jct 18 Charing Cross onslip EB - Total Closure
-
15th of October 2025, 7:30pm16th of October 2025, 6:30amM90 from A912 Edinburgh Rd to S/B on slip. Slip closure
-
15th of October 2025, 7:30pm16th of October 2025, 6:30amM90 Friarton Bridge to S/B on slip from A912. S/B Lane closures
-
15th of October 2025, 7:30pm16th of October 2025, 6:30amM90 Craigend to N/B on slip from Broxden. N/B Lane closures
-
15th of October 2025, 7:30pm16th of October 2025, 6:30amM90 Broxden Rbt to Friarton N/B on slip. Slip closure
-
15th of October 2025, 8:00pm16th of October 2025, 6:00amM9 EB Jct 1A to 1 Road Closure.
-
15th of October 2025, 8:00pm16th of October 2025, 6:00amM9 EB Queensferry to jct 1A Road Closure.
-
15th of October 2025, 8:00pm16th of October 2025, 6:00amM9 EB Jct 1 off slip Road Closure.
-
15th of October 2025, 8:00pm16th of October 2025, 6:00amM74 SB Jct 6 offslip to Motherwell - Total Closure
-
15th of October 2025, 8:00pm16th of October 2025, 6:00amM74 SB Jct 6 offslip to Hamilton - Total Closure
-
15th of October 2025, 8:00pm16th of October 2025, 6:00amM74 SB Jct 6 - Nearside Lane Closure
-
16th of October 2025, 7:30pm22nd of October 2025, 6:00amA7-NB-South of Teinside-Road Closure
-
16th of October 2025, 7:30pm22nd of October 2025, 6:00amA7-SB-South of Teinside-Road Closure
-
16th of October 2025, 7:30pm17th of October 2025, 6:30amM90 Friarton to Broxden Rbt. N/B on slip. Slip closure
-
16th of October 2025, 8:00pm17th of October 2025, 6:00amM74 SB Jct 6 onslip from Hamilton - Total Closure
-
16th of October 2025, 8:00pm17th of October 2025, 6:00amM74 SB Jct 6 between the slips - Nearside Lane Closure
-
16th of October 2025, 8:00pm17th of October 2025, 6:00amM74 NB Jct 6 offslip to Hamilton - Total Closure
-
16th of October 2025, 8:00pm17th of October 2025, 6:00amM74 NB Jct 6 offslip to Motherwell - Total Closure
-
16th of October 2025, 8:00pm17th of October 2025, 6:00amM74 NB Jct 6 between the slips - Nearside Lane Closure
-
16th of October 2025, 8:00pm17th of October 2025, 6:00amM74 NB Jct 6 onslip from Motherwell - Total Closure
-
17th of October 2025, 6:00am17th of October 2025, 7:30pmA7-NB-South of Teinside-TTLs
-
17th of October 2025, 6:00am17th of October 2025, 7:30pmA7-SB-South of Teinside-TTLs
-
17th of October 2025, 8:00pm18th of October 2025, 6:00amM9 - WB - Jct 9 to Jct 11 - Road closure
-
17th of October 2025, 8:00pm18th of October 2025, 6:00amM9 - WB - Jct 9 on slip - slip closure
-
17th of October 2025, 8:00pm18th of October 2025, 6:00amM9 - WB - Jct 10 off slip - slip closure
-
17th of October 2025, 8:00pm18th of October 2025, 6:00amM9 - WB - Jct 10 on slip - slip closure
-
17th of October 2025, 8:00pm18th of October 2025, 6:00amM9 - EB - Jct 11 to Jct 9 - Road closure
-
17th of October 2025, 8:00pm18th of October 2025, 6:00amM9 - EB - Jct 10 off slip - Road closure
-
17th of October 2025, 8:00pm18th of October 2025, 6:00amM9 - EB - Jct 10 on slip - Road closure
-
17th of October 2025, 8:00pm18th of October 2025, 6:00amM9 - EB - Jct 9 on slip - Road closure
-
17th of October 2025, 8:00pm18th of October 2025, 6:00amM80 - EB - Jct 9 - Road closure
-
19th of October 2025, 7:00pm22nd of October 2025, 6:00amA82 Lon Na Fola South of Drumnadrochit NB - Road Closure with Amnesties
-
19th of October 2025, 7:00pm22nd of October 2025, 6:00amA82 Lon Na Fola South of Drumnadrochit SB - Road Closure with Amnesties
-
20th of October 2025, 7:00pm25th of October 2025, 7:00amA87 Peinmore South of Portree WB - Road Closure with Amnesties
-
20th of October 2025, 7:00pm25th of October 2025, 7:00amA87 Peinmore South of Portree EB - Road Closure with Amnesties
-
20th of October 2025, 7:30pm23rd of October 2025, 6:00amM80 NB Jct. 7 - 9 Road closure
-
20th of October 2025, 7:30pm23rd of October 2025, 6:00amM876 EB M80 to Jct. 1 Road Closure
-
20th of October 2025, 7:30pm23rd of October 2025, 6:00amM80 Jct. 9 NB Offslip - Slip Closure
-
20th of October 2025, 7:30pm23rd of October 2025, 6:00amM80 Jct. 7 Onslip
-
20th of October 2025, 7:30pm23rd of October 2025, 6:00amM876 Jct. 1 EB Offslip
-
20th of October 2025, 8:00pm21st of October 2025, 6:00amM8 WB Jct 14 onslip - Total Closure
-
20th of October 2025, 8:00pm21st of October 2025, 6:00amM8 WB Jct 14 to Jct 15 Stirling Rd offslip - Nearside Lane Closure
-
20th of October 2025, 8:00pm21st of October 2025, 6:00amM8 WB Jct 15 Loop U onslip - Total Closure
-
20th of October 2025, 8:00pm21st of October 2025, 6:00amAlexandra Parade - Nearside Lane Closure
-
20th of October 2025, 8:00pm21st of October 2025, 6:00amM8 EB Jct 18 offslip to Great Western Rd - Total Closure
-
20th of October 2025, 8:00pm21st of October 2025, 6:00amM90 - NB - Jct 1B to 2 - Road closure
-
20th of October 2025, 8:00pm21st of October 2025, 6:00amM90 - NB - Jct 1B on slip - Road closure
-
20th of October 2025, 8:00pm21st of October 2025, 6:00amM90 - NB - Jct 1c off slip - Road closure
-
20th of October 2025, 8:00pm21st of October 2025, 6:00amM90 - NB - Jct 1c on slip - Road closure
-
20th of October 2025, 8:00pm21st of October 2025, 6:00amM90 - NB - Jct 2 off slip - Road closure
-
20th of October 2025, 8:00pm25th of October 2025, 4:30amM8- WB- Main line- hard shoulder closure -
-
20th of October 2025, 8:00pm25th of October 2025, 4:30amM8- WB- Main line- lane 1 closure
-
21st of October 2025, 7:00pm30th of October 2025, 7:00amA82 Inchree North of Corran NB - Road Closure with Amnesties
-
21st of October 2025, 7:00pm30th of October 2025, 7:00amA82 Inchree North of Corran SB - Road Closure with Amnesties
-
21st of October 2025, 8:00pm22nd of October 2025, 6:00amM8 EB Jct 25a to Jct 25 - Offside and Adjacent Lane Closure
-
21st of October 2025, 8:00pm22nd of October 2025, 6:00amM8 WB Jct 24 to Jct 25 - Offside Lane Closure
-
21st of October 2025, 8:00pm22nd of October 2025, 6:00amA739 Berryknowes Rd slip to Cardonald Interchange - Total Closure
-
21st of October 2025, 8:00pm22nd of October 2025, 6:00amA739 NB - Total Closure
-
21st of October 2025, 8:00pm22nd of October 2025, 6:00amM8 EB Jct 24 onslip - Total Closure
-
21st of October 2025, 8:00pm22nd of October 2025, 6:00amM8 EB Jct 23 onslip - Total Closure
-
21st of October 2025, 8:00pm22nd of October 2025, 6:00amM8 EB Jct 24 to Sec c/way Jct 22 - Nearside Lane Closure
-
21st of October 2025, 8:00pm24th of October 2025, 6:00amM90 - NB - jct 2 to jct 3 - road closure
-
21st of October 2025, 8:00pm24th of October 2025, 6:00amM90 - NB - jct 2 on slip - road closure
-
21st of October 2025, 8:00pm24th of October 2025, 6:00amM90 - NB - A92 on slip - road closure
-
21st of October 2025, 8:00pm24th of October 2025, 6:00amM90 - NB - jct 3 off slip - road closure
-
22nd of October 2025, 7:30pm25th of October 2025, 6:00amA7-NB-Boleside-Road Closure
-
22nd of October 2025, 7:30pm25th of October 2025, 6:00amA7-SB-Boleside-Road Closure
-
22nd of October 2025, 8:00pm23rd of October 2025, 6:00amM8 EB Jct 21 to Jct 18 - Offside and Adjacent Lane Closure
-
22nd of October 2025, 8:00pm23rd of October 2025, 6:00amM8 EB Jct 19 Anderston onslip - Total Closure
-
22nd of October 2025, 8:00pm23rd of October 2025, 6:00amM8 EB Jct 19 to Jct 18 - Total Closure
-
22nd of October 2025, 8:00pm23rd of October 2025, 6:00amM8 WB Jct 17 to Jct 22 - Offside Lane Closure
-
23rd of October 2025, 6:00am24th of October 2025, 7:30pmA7-NB-Boleside-TTLs
-
23rd of October 2025, 6:00am24th of October 2025, 7:30pmA7-SB-Boleside-TTLs
-
23rd of October 2025, 8:00pm24th of October 2025, 6:00amM74 NB Jct 1a to M8 Sec c/way Jct 22 - Nearside Lane Closure
-
23rd of October 2025, 8:00pm24th of October 2025, 6:00amM74 NB Jct 1 offslip - Total Closure
-
23rd of October 2025, 8:00pm24th of October 2025, 6:00amM8 WB Sec c/way Seaward St onslip - Total Closure
-
23rd of October 2025, 8:00pm24th of October 2025, 6:00amM77 SB from M8 Jct 22 - Total Closure
-
23rd of October 2025, 8:00pm24th of October 2025, 6:00amM8 EB Jct 22 to West St - Nearside and Adjacent Lane Closure
-
24th of October 2025, 8:00pm30th of October 2025, 6:00amM90 - SB - Jct 3 to Jct 2 - Road Closure
-
24th of October 2025, 8:00pm30th of October 2025, 6:00amM90 - SB - Jct 3 on slip - Road Closure
-
24th of October 2025, 8:00pm30th of October 2025, 6:00amM90 - SB - A92 on slip - Road Closure
-
24th of October 2025, 8:00pm30th of October 2025, 6:00amM90 - SB - Jct 2 off slip - Road Closure
-
24th of October 2025, 8:30pm30th of October 2025, 6:30amA92 S/B Access to M90 - Road Closure
-
26th of October 2025, 7:30pm14th of November 2025, 6:30amM90 Glenfarg- Lane Closure N/B
-
26th of October 2025, 7:30pm14th of November 2025, 6:30amM90 Glenfarg- Lane Closure S/B
-
27th of October 2025, 7:30pm1st of November 2025, 6:00amA1 - NB - Lamberton - Road Closure
-
27th of October 2025, 7:30pm1st of November 2025, 6:00amA1 - SB - Lamberton - Road Closure
-
27th of October 2025, 8:00pm28th of October 2025, 6:00amA75 Cuckoo Bridge Rbt - Inner and Middle Ring Lane Closures
-
27th of October 2025, 8:00pm28th of October 2025, 6:00amA76 SB Glasgow Rd approach to Cuckoo Bridge Rbt - Lane Closures
-
27th of October 2025, 8:00pm28th of October 2025, 6:00amA76 Glasgow Rd NB approach to Cuckoo Bridge Rbt - Lane Closures
-
27th of October 2025, 8:00pm28th of October 2025, 6:00amA75 EB approach to Cuckoo Bridge Rbt - Lane Closures
-
27th of October 2025, 8:00pm28th of October 2025, 6:00amA75 WB approach to Cuckoo Bridge Rbt - Lane Closures
-
27th of October 2025, 8:00pm28th of October 2025, 6:00amA75 Bloomfield Rbt - 4-way TTL
-
27th of October 2025, 8:00pm28th of October 2025, 6:00amA75 Bloomfield Rbt - 4-way TTL
-
27th of October 2025, 8:00pm28th of October 2025, 6:00amA75 Bloomfield Rbt - 4-way TTL
-
27th of October 2025, 8:00pm28th of October 2025, 6:00amA75 Bloomfield Rbt - 4-way TTL
-
28th of October 2025, 8:00pm31st of October 2025, 6:00amM8 Jct 15 to Jct 13 EB - Offside Lane Closure
-
28th of October 2025, 8:00pm31st of October 2025, 6:00amM8 Jct 12 to Jct 15 WB - Offside Lane Closure
-
29th of October 2025, 7:00pm7th of November 2025, 7:00amA82 Belford Rd Fort William NB - Road Closure with Amnesties
-
29th of October 2025, 7:00pm7th of November 2025, 7:00amA82 Belford Rd Fort William SB - Road Closure with Amnesties
-
29th of October 2025, 7:30pm8th of November 2025, 6:00amA702 - NB - Dolphinton - Closure
-
29th of October 2025, 7:30pm8th of November 2025, 6:00amA702 - SB - Dolphinton - Closure
-
29th of October 2025, 8:00pm30th of October 2025, 6:00amm90 - SB - Jct 2 to Jct 1B - Road Closure
-
29th of October 2025, 8:00pm30th of October 2025, 6:00amM90 - SB - Jct 2 on slip - Road Closure
-
29th of October 2025, 8:00pm30th of October 2025, 6:00amM90 - SB - Jct 1c off slip - Road Closure
-
29th of October 2025, 8:00pm30th of October 2025, 6:00amM90 - SB - Jct 1c on slip - Road Closure
-
29th of October 2025, 8:00pm30th of October 2025, 6:00amM90 - SB - Jct 1B on slip - Road Closure
-
30th of October 2025, 8:00pm1st of November 2025, 6:00amM9 - SB - Jct 11 - Jct 9 - Closure
-
30th of October 2025, 8:00pm1st of November 2025, 6:00amM9 - SB - Jct 10 - Off Slip Closure
-
30th of October 2025, 8:00pm1st of November 2025, 6:00amM9 - NB - Jct 9 - Jct 11 - Closure
-
30th of October 2025, 8:00pm1st of November 2025, 6:00amM9 - NB - Jct 10- On Slip Closure
-
30th of October 2025, 8:00pm4th of November 2025, 6:00amM90 - SB - Jct 1a to M9 jct 1a - Road closure
-
30th of October 2025, 8:00pm4th of November 2025, 6:00amM90 - SB - Jct 1a on slip - Road closure
-
30th of October 2025, 8:00pm4th of November 2025, 6:00amM90 - SB - Jct 1a to M9 jct 1a - Road closure
-
2nd of November 2025, 7:30pm14th of November 2025, 6:30amM90 Rhynd Road- Lane Closure N/B
-
2nd of November 2025, 7:30pm14th of November 2025, 6:30amM90 Rhynd Road- Lane Closure S/B
-
3rd of November 2025, 7:30pm4th of November 2025, 6:00amA1 - NB - Lamberton Jct - Road Closure
-
3rd of November 2025, 7:30pm4th of November 2025, 6:00amA1 - SB - Lamberton Jct - Road Closure
-
3rd of November 2025, 8:00pm6th of November 2025, 6:00amM8 Jct 14 to Jct 12 EB - Offside Lane Closure
-
3rd of November 2025, 8:00pm6th of November 2025, 6:00amM8 Jct 11 to Jct 13 WB - Offside Lane Closure
-
4th of November 2025, 7:30pm29th of November 2025, 6:00amA1 - NB - Gladsmuir to Bankton - Road Closure
-
4th of November 2025, 7:30pm29th of November 2025, 6:00amA1 - NB - Gladsmuir NB On slip - Road Closure
-
4th of November 2025, 7:30pm29th of November 2025, 6:00amA1 - NB - Bankton NB Offslip - Road Closure
-
6th of November 2025, 8:00pm12th of November 2025, 6:00amM8 Jct 12 to Jct 10 EB - Offside Lane Closure
-
6th of November 2025, 8:00pm12th of November 2025, 6:00amM8 Jct 9 to Jct 12 WB - Offside Lane Closure
-
9th of November 2025, 7:00pm13th of November 2025, 7:00amA82 Beinn Odhar Auch NB - Road Closure with Amnesties
-
9th of November 2025, 7:00pm13th of November 2025, 7:00amA82 Beinn Odhar Auch SB - Road Closure with Amnesties
-
10th of November 2025, 12:00am28th of November 2025, 3:30pmA78 Inverkip Village - TTLs
-
10th of November 2025, 12:00am28th of November 2025, 3:30pmA78 Inverkip Village - TTLs
-
10th of November 2025, 8:00pm21st of November 2025, 6:00amM9 Jct4-3 SB - Road Closure
-
10th of November 2025, 8:00pm21st of November 2025, 6:00amM9 Jct4 SB Onslip - Road Closure
-
10th of November 2025, 8:00pm23rd of November 2025, 4:30amM8 WB - HS Closure - Jct2 Onslip
-
10th of November 2025, 8:00pm22nd of November 2025, 4:30amM8 WB - Lane Closure - Jct 2 Onslip
-
11th of November 2025, 7:00pm12th of November 2025, 5:00amA85 West of Ross Bridge Comrie WB - Road Closure with Amnesties
-
11th of November 2025, 7:00pm12th of November 2025, 5:00amA85 West of Ross Bridge Comrie EB - Road Closure with Amnesties
-
12th of November 2025, 8:00pm28th of November 2025, 6:00amM8 EB Jct 26 to Jct 21 - Progressive Offside Lane Closures
-
12th of November 2025, 8:00pm28th of November 2025, 6:00amM8 WB Jct 18 to Jct 26 - Progressive Offside Lane Closures
-
13th of November 2025, 7:00pm19th of November 2025, 7:00amA82 Clachaig Inn Glencoe NB - Road Closure with Amnesties
-
13th of November 2025, 7:00pm19th of November 2025, 7:00amA82 Clachaig Inn Glencoe SB - Road Closure with Amnesties
-
19th of November 2025, 8:00am21st of November 2025, 11:00pmA90 Gateside NB - Diversion signage for local road closure
-
20th of November 2025, 8:30pm27th of November 2025, 6:00amM8 Jct2-3 - Road Closure
-
20th of November 2025, 8:30pm27th of November 2025, 6:00amM8 Jct2 WB Onslip - Road Closure
-
20th of November 2025, 8:30pm27th of November 2025, 6:00amM8 Jct3 WB Offslip - Road Closure
-
23rd of November 2025, 7:00pm28th of November 2025, 6:00amA82 Strone North of Urquhart Castle Drumnardochit NB - Road Closure with Amnesties
-
23rd of November 2025, 7:00pm28th of November 2025, 6:00amA82 Strone North of Urquhart Castle Drumnardochit SB - Road Closure with Amnesties
-
23rd of November 2025, 8:00pm25th of November 2025, 6:00amA85 George St Oban WB - Road Closure with Amnesties
-
24th of November 2025, 7:00pm5th of December 2025, 7:00amA9 Evanton - Convoy Works
-
27th of November 2025, 8:30pm2nd of December 2025, 6:00amM8 Prior to Junction 4 WB - Full Closure
-
27th of November 2025, 8:30pm2nd of December 2025, 6:00amM8 Junction 3a Westbound On Slip - Road Closure
-
27th of November 2025, 8:30pm2nd of December 2025, 6:00amM8 Junction 3a Westbound On slip - Road Closure
-
27th of November 2025, 8:30pm2nd of December 2025, 6:00amM8 Mainline from Junction 3a Westbound - Full Closure
-
27th of November 2025, 8:30pm2nd of December 2025, 6:00amStarlaw West Roundabout - Outer Lane Closure
-
27th of November 2025, 8:30pm28th of November 2025, 6:00amM8 Jct3A-4 - Road Closure
-
27th of November 2025, 8:30pm28th of November 2025, 6:00amM8 Jct3A Onslip - Road Closure
-
27th of November 2025, 8:30pm28th of November 2025, 6:00amM8 Jct4 Offslip - Road Closure
-
28th of November 2025, 7:30pm3rd of December 2025, 6:00amA1 - NB - Bankton NB Onslip - Slip Closure
-
28th of November 2025, 7:30pm3rd of December 2025, 6:00amA1 - NB - Bankton NB Onslip - Mainline Closure
-
28th of November 2025, 7:30pm3rd of December 2025, 6:00amA1 - NB - Bankton Junction South Roundabout - TTL`s
-
30th of November 2025, 7:00pm4th of December 2025, 7:00amA828 South of Connel Bridge NB - Road Closure with Amnesties
-
30th of November 2025, 7:00pm4th of December 2025, 7:00amA828 South of Connel Bridge SB - Road Closure with Amnesties
-
1st of December 2025, 8:00pm2nd of December 2025, 6:00amM80 SB slip to the M8 WB - Total Closure
-
1st of December 2025, 8:00pm2nd of December 2025, 6:00amM80 Jct 1 onslip NB - Total Closure
-
1st of December 2025, 8:00pm2nd of December 2025, 6:00amM80 Jct 1 to Royston Road O/B NB - Hard Shoulder Closure
-
2nd of December 2025, 8:00pm3rd of December 2025, 6:00amA723 WB Motherwell Rd - Hard Shoulder Closure
-
2nd of December 2025, 8:00pm3rd of December 2025, 6:00amA723 EB Motherwell Rd - Hard Shoulder Closure
-
3rd of December 2025, 7:30pm12th of December 2025, 6:00amA702 - NB - Flotterstone - Road Closure
-
3rd of December 2025, 7:30pm12th of December 2025, 6:00amA702 - SB - Flotterstone - Road Closure
-
3rd of December 2025, 8:00pm4th of December 2025, 6:00amM8 EB Jct 13 slip to the M80 NB - Hard Shoulder Closure
-
3rd of December 2025, 8:00pm4th of December 2025, 6:00amM80 SB Jct 1 offslip - Hard Shoulder Closure
-
4th of December 2025, 7:00pm12th of December 2025, 7:00amA828 Dallachulish South of Creagan NB - Road Closure with Amnesties
-
4th of December 2025, 7:00pm12th of December 2025, 7:00amA828 Dallachulish South of Creagan SB - Road Closure with Amnesties
-
4th of December 2025, 8:00pm5th of December 2025, 6:00amM8 EB Jct 25 onslip - Total Closure
-
4th of December 2025, 8:00pm5th of December 2025, 6:00amM8 WB Jct 25 onslip - Total Closure
-
4th of December 2025, 8:00pm5th of December 2025, 6:00amBerryknowes Rd NB offslip - Total Closure
-
4th of December 2025, 8:00pm5th of December 2025, 6:00amM8 WB Sec c/way Jct 21 - Hard Shoulder Closure
-
4th of December 2025, 8:00pm5th of December 2025, 6:00amM8 WB Sec c/way Jct 22 - Hard Shoulder Closure
-
4th of December 2025, 8:30pm6th of December 2025, 6:00amM8 - EB - Junction 4 Off-slip - Road Closure
-
4th of December 2025, 8:30pm6th of December 2025, 6:00amM8 - EB - Junction 4a -4 - Road Closure
-
4th of December 2025, 8:30pm6th of December 2025, 6:00amM8 - EB - Junction 4 Roundabout.- Lane Closure
-
4th of December 2025, 8:30pm6th of December 2025, 6:00amM8 EB Jct 4A on-slip. Road Closure.
-
7th of December 2025, 7:00pm16th of December 2025, 6:00amA82 Altsigh NB - Road Closure with Amnesties
-
7th of December 2025, 7:00pm16th of December 2025, 6:00amA82 Altsigh SB - Road Closure with Amnesties
-
8th of December 2025, 9:30am8th of December 2025, 3:30pmA84 Doune - Diversion Signage
-
8th of December 2025, 8:00pm9th of December 2025, 6:00amM8 EB Jct 23 to M8 EB Sec c/way - Hard Shoulder Closure
-
8th of December 2025, 8:00pm9th of December 2025, 6:00amM8 WB to M77 SB slip - Hard Shoulder Closure
-
8th of December 2025, 8:00pm20th of December 2025, 4:30amM8- WB- Jct2 Offslip - hard shoulder closure
-
8th of December 2025, 8:00pm20th of December 2025, 4:30amM8- WB- Jct2 Offlsip- lane 1 closure
-
8th of December 2025, 8:30pm13th of December 2025, 6:00amM8 Junction 4 Eastbound - Full Closure
-
8th of December 2025, 8:30pm13th of December 2025, 6:00amM8 Junction 4 Eastbound On Slip - Full Closure
-
9th of December 2025, 8:00pm10th of December 2025, 6:00amM8 Jct 18 offslip to Charing Cross WB - Total Closure
-
9th of December 2025, 8:00pm10th of December 2025, 6:00amM8 Jct 17 to Jct 18 WB - Offside Lane Closure
-
9th of December 2025, 8:00pm10th of December 2025, 6:00amM8 Jct 21 to Jct 17 EB - Offside Lane Closure
-
9th of December 2025, 8:00pm10th of December 2025, 6:00amGreat Western Rd WB - Nearside Lane Closure
-
9th of December 2025, 8:00pm10th of December 2025, 6:00amM8 Jct 17 onslip from Great Western Rd WB - Hard Shoulder Closure
-
9th of December 2025, 8:00pm10th of December 2025, 6:00amM8 EB Jct 23 to Jct 22 Sec c/way - Nearside Lane Closure
-
10th of December 2025, 8:00pm11th of December 2025, 6:00amM8 EB Jct 15 Stirling Rd onslip - Total Closure
-
10th of December 2025, 8:00pm11th of December 2025, 6:00amM8 WB Jct 15 Stirling Rd offslip - Total Closure
-
10th of December 2025, 8:00pm11th of December 2025, 6:00amM8 WB Jct 14 on Slip - Total Closure
-
10th of December 2025, 8:00pm11th of December 2025, 6:00amM8 WB Jct 13 to Jct 15 - Lane Closure
-
10th of December 2025, 8:00pm11th of December 2025, 6:00amM80 SB onto the M8 WB - Total Closure
-
10th of December 2025, 8:00pm11th of December 2025, 6:00amM8 Jct 15 offslip to Stirling Rd - Hard Shoulder Closure
-
11th of December 2025, 8:00pm12th of December 2025, 6:00amM8 Jct 15 Loop U onslip WB - Total Closure
-
11th of December 2025, 8:00pm12th of December 2025, 6:00amM8 Jct 15 to Jct 16 WB - Nearside Lane Closure
-
11th of December 2025, 8:00pm12th of December 2025, 6:00amM8 Jct 16 offslip WB - Total Closure
-
15th of December 2025, 7:00pm24th of December 2025, 6:00amA835 Inchbae WB - Road Closure with Amnesties
-
15th of December 2025, 7:00pm24th of December 2025, 6:00amA835 Inchbae EB - Road Closure with Amnesties
-
15th of December 2025, 8:00pm17th of December 2025, 6:00amM8 Jct 16 onslip EB - Total Closure
-
15th of December 2025, 8:00pm17th of December 2025, 6:00amM8 Jct 17 to Jct 15 EB - Nearside Lane Closure
-
15th of December 2025, 8:00pm17th of December 2025, 6:00amM8 Jct 15 offslip to Springburn EB - Total Closure
-
15th of December 2025, 8:30pm18th of December 2025, 6:00amM8 Junction 4a Westbound - Full Closure
-
15th of December 2025, 8:30pm18th of December 2025, 6:00amM8 Junction 4a Westbound - Slip Closure
-
15th of December 2025, 8:30pm18th of December 2025, 6:00amHeartlands Services - Slip Closure
-
15th of December 2025, 8:30pm18th of December 2025, 6:00amHeartlands Services - Slip Closure
-
15th of December 2025, 8:30pm18th of December 2025, 6:00amM8 Junction 5 - Slip Closure
-
15th of December 2025, 8:30pm18th of December 2025, 6:00amM8 Junction 4a - Lane Closure
-
5th of January 2026, 7:00am31st of March 2026, 7:00pmA87 Portree WB - TTL
-
5th of January 2026, 7:00am31st of March 2026, 7:00pmA87 Portree EB - TTL
-
21st of January 2026, 7:30pm23rd of January 2026, 6:00amA1 - NB - South of Little Pinkerton Jct - Road Closure
-
21st of January 2026, 7:30pm23rd of January 2026, 6:00amA1 - SB - South of Little Pinkerton Jct - Road Closure
-
23rd of January 2026, 7:30pm7th of February 2026, 6:00amA68 - NB - Nether Blainslie - Road Closure
-
23rd of January 2026, 7:30pm7th of February 2026, 6:00amA68 - SB - Nether Blainslie - Road Closure
-
9th of February 2026, 7:30pm11th of February 2026, 6:00amA68 - NB - South of Pathhead - Road Closure
-
9th of February 2026, 7:30pm11th of February 2026, 6:00amA68 - SB - South of Pathhead - Road Closure
-
9th of February 2026, 8:30pm11th of February 2026, 6:00amM8 - EB - Harthill BusStop - Lane Closure
-
11th of February 2026, 7:30pm21st of February 2026, 6:00amA68 - NB - Fala Village - Road Closure
-
11th of February 2026, 7:30pm21st of February 2026, 6:00amA68 - SB - Fala Village - Road Closure
-
17th of February 2026, 8:30pm13th of March 2026, 6:00amM8 - WB - Junction 3 Onslip - Slip Closure
-
17th of February 2026, 8:30pm13th of March 2026, 6:00amM8 - WB - Junction 3a Offslip - Slip Closure
-
18th of February 2026, 8:30pm13th of March 2026, 6:00amM8 - WB - Jct 3 to Jct 3A- Full Closure
-
23rd of February 2026, 7:30pm28th of February 2026, 6:00amA68 - NB - Juniperlea Inn - Road Closure
-
23rd of February 2026, 7:30pm28th of February 2026, 6:00amA68 - SB - Juniperlea Inn - Road Closure
-
2nd of March 2026, 7:30pm3rd of March 2026, 6:00amA68 - NB - 1 Mile South of B6368 - Road Closure
-
2nd of March 2026, 7:30pm3rd of March 2026, 6:00amA68 - SB - 1 Mile South of B6368 - Road Closure
-
3rd of March 2026, 7:30pm17th of March 2026, 6:00amA68 - NB - Caters Bar - Road Closure
-
3rd of March 2026, 7:30pm17th of March 2026, 6:00amA68 - SB - Caters Bar - Road Closure
-
16th of March 2026, 7:30pm17th of March 2026, 6:00amA68 - NB - Lethem - Road Closure
-
16th of March 2026, 7:30pm17th of March 2026, 6:00amA68 - SB - Lethem - Road Closure
-
17th of March 2026, 7:30pm20th of March 2026, 6:00amA6091 - NB - Tweedbank - Road Closure
-
17th of March 2026, 7:30pm20th of March 2026, 6:00amA6091 - EB - Tweedbank - Road Closure
-
17th of March 2026, 7:30pm20th of March 2026, 6:00amA6091 - WB - Tweedbank - Road Closure
-
17th of March 2026, 7:30pm20th of March 2026, 6:00amA6091 - EB - Tweedbank - Road Closure
-
17th of March 2026, 7:30pm20th of March 2026, 6:00amA6091 - WB - Tweedbank - Road Closure
-
27th of March 2026, 7:30pm31st of March 2026, 6:00amA68 - NB - Lauder High Street - Road Closure
-
27th of March 2026, 7:30pm31st of March 2026, 6:00amA68 - SB - Lauder High Street - Road Closure
-
13th of April 2026, 8:30pm17th of April 2026, 6:00amM80 SB Jct 9 to M876 Merge - Road Closure
-
13th of April 2026, 8:30pm17th of April 2026, 6:00amM876 - WB - Junction 1 - Road Closure
-
13th of April 2026, 8:30pm17th of April 2026, 6:00amM80 - WB - Stirling Services - On-slip Closure
-
28th of April 2026, 10:00pm3rd of July 2026, 6:00amM9 - NB - J1A-1B - Lane Closures
-
28th of April 2026, 10:00pm3rd of July 2026, 6:00amM9 - SB - J1B-1A - Lane Closures
-
28th of April 2026, 10:00pm3rd of July 2026, 6:00amM9 - NB - J1A-2 - Road Closure
-
28th of April 2026, 10:00pm3rd of July 2026, 6:00amM9 - SB - J2-1A - Road Closure
-
2nd of June 2026, 7:00am30th of September 2026, 7:00pmA835 Strathgarve Forest West of Garve WB - TTL
-
2nd of June 2026, 7:00am30th of September 2026, 7:00pmA835 Strathgarve Forest West of Garve EB - TTL
-
1st of September 2026, 7:00am30th of October 2026, 7:00pmA9 South if Bridge of Tacher Achavanich - Convoy Works
Local roadworks
The Traffic Scotland Service does not cover local roads. These are managed and maintained by local authorities.
Visit The Road Works Scotland website for information on local roads. The website provides information on all programmed and emergency works carried out by utility companies, construction companies, and the local authority on local roads.