Planning ahead
As part of our service, work is undertaken to maintain and develop the trunk road network. Traffic Scotland works with major events organisers and partners to assess the impact of major events on road traffic. To help with your travels, or to find out more view future traffic updates below, or by using our interactive map on the homepage.
Upcoming Events and Future Roadworks
Work to get underway on improving the resilience of the OId Military Road at the A83 Rest and Be Thankful
£1.3 Million Road Safety Improvements on M90 near Glenfarg begin Sunday 11th February
Road Safety Improvements for the A835 Garve
£760,000 Retaining Wall Works at A82 Glen Gloy
Tay Road Bridge Major Works
M74 Junction 6 ⏐ Essential Structural Investigations
Bridge Works on Northbound Approach to M9 Junction 1A
Package of Essential Overnight Works on M8 Junctions 19 to 15
Improvements on the A78 at Wemyss Bay continues from Monday 18th March 2024
Traffic Scotland Supports 'Spring Clean Scotland 2024'
Fencing Works on the M8 Eastbound at Junctions 3 and 2
A1 Drainage Improvement Works, Abbotsview to Gladsmuir
Essential Drainage Works on the A78 Between Seamill and Waterside Hotel Continue
Ash Dieback Tree Felling on the A83
Overnight Resurfacing Works On The A1
Essential Bridge Expansion Joint Replacements and Resurfacing works on the M8 at Junction 24 commence Thursday 21st March
Essential Boundary Fence and Central Reservation Repairs on the M8 at Junction 15 (Castle Street) Commence Monday 15th April 2024
A720 Edinburgh City Bypass overnight maintenance
Next Milestone for A9 Dualling Delivery Plan
Surfacing Improvements on A96 Near Keith to use Eco-Friendly Recycling Technique
Bridge Parapet Replacement on the A77 at Whatriggs Road Commences Sunday 21st April
Overnight Resurfacing on the A90 South of Forfar begins Sunday 21st April
A90 Longforgan | Road Safety Improvements
Spring Refresh for the A87 Borve, North of Portree
M8 & M77 | Sign Gantry Maintenance
Essential Resurfacing on the A77, East of Turnberry, commences Monday 22nd April 2024
Resurfacing on the M9 Northbound at Junction 1A
Road Improvement Works at four Locations on the A828
Essential Woodland Maintenance on the A701 at Tinwald Downs
A9 Croy Junction | Duel Carriageway Improvements
Queensferry Crossing Diversion Trial Success
Women's Scottish Gas Scottish Cup Semi Finals | Hampden
ETAPE 2024 | Fort William
Resurfacing works on the A83 Lochgilphead
A92 Cowdenbeath | Surfacing Improvements
A84 Strathyre Area | Spring Refresh
A737 Glebe Road/Manrahead Roundabout | Resurfacing
A9/B851 Fort Augustus | Dual Carriageway Improvements
Night-Time Essential Surfacing Improvements Planned on the A87 North of Broadford
A720 Lothianburn to Baberton | Drainage Investigation
Essential Bridge Repairs on the A737 at Risk Brae Commence Wednesday 1st May
A77 Cairnryan Road | Essential Resurfacing
WHOOP UCI Mountain Bike World Series 2024 | Fort William
A8 Port Glasgow | Scottish Water Top Up Tap Installation
A75 Glenluce- Resurfacing Works
A83 Glen Kinglas- Road Safety Enhancements
Major Water Main Investment along Main Ayrshire Route (A78)
Safety Improvements on A96 at Lhanbryde
A1 East Linton | Northbound Resurfacing
A78 Greenock | Essential Resurfacing
Overnight closure of M8 eastbound carriageway between Junction 7 Eurocentral & Junction 6 Newhouse
M74 | Rail Bridge Closure
Overnight closure of A8 westbound carriageway between Bargeddie Junction (Showcase) & Bargeddie Roundabout (A89)
A8 | Eurocentral Resurfacing Works
Essential Resurfacing for Multiple Locations on the A9
Overnight closures of A725 north and southbound carriageways between A7071 near Raith Junction & Shawhead Junction (North Road)
Electricity Infrastructure Upgrade | M74 off slip Northbound Junction 8
Planned roadworks
-
23rd of April 2024, 6:00am27th of April 2024, 5:00pmA828 Connel to Ballachulish - Stop/Go Works
-
25th of April 2024, 8:00am27th of April 2024, 6:00pmA702 - SB - Dolphinton - Temp lights
-
28th of April 2024, 5:00am2nd of May 2024, 5:00pmA701 Dumfries to A74 - Mobile Stop Go
-
28th of April 2024, 6:00am28th of April 2024, 5:00pmA82 Inverness to For Augustus SB - Event
-
28th of April 2024, 6:00am28th of April 2024, 5:00pmA82 Inverness to For Augustus NB - Event
-
28th of April 2024, 6:00am1st of May 2024, 8:00pmM9 N/B Jct 10-11. Hard Shoulder Closure
-
28th of April 2024, 6:00am28th of April 2024, 6:00pmA725 Southbound from Diamond to Orbiston - Nearside lane closure
-
28th of April 2024, 6:00am28th of April 2024, 6:00pmA725 Diamond off-slip - Total closure
-
28th of April 2024, 6:00am28th of April 2024, 6:00pmA725 Bellziehill off-slip - Total closure
-
28th of April 2024, 6:00am28th of April 2024, 6:00pmA725 Orbiston off-slip - Total closure
-
28th of April 2024, 5:00pm10th of May 2024, 2:00amA83 Cossack to Colchester Lochgilphead SB - Convoy Works
-
28th of April 2024, 5:00pm10th of May 2024, 2:00amA83 Cossack to Colchester Lochgilphead NB - Convoy Works
-
28th of April 2024, 7:00pm30th of April 2024, 6:00amM74 NB J17 EXIT SLIP ROAD - Road Closure
-
28th of April 2024, 7:00pm29th of April 2024, 6:00amA82 Achallder North of Bridge of Orchy NB - TTL
-
28th of April 2024, 7:00pm29th of April 2024, 6:00amA82 Achallder North of Bridge of Orchy SB - TTL
-
28th of April 2024, 7:00pm29th of April 2024, 7:00amA9 Pitlochry NB - Lane Closure
-
28th of April 2024, 7:00pm29th of April 2024, 7:00amA9 Pitlochry NB - TTL
-
28th of April 2024, 7:00pm29th of April 2024, 7:00amA9 Pitlochry SB - TTL
-
28th of April 2024, 7:30pm14th of May 2024, 6:30amA92 Cowdenbeath to Lochgelly- Lane Closure N/B
-
28th of April 2024, 7:30pm14th of May 2024, 6:30amA92 Cowdenbeath to Lochgelly- Lane Closure S/B
-
28th of April 2024, 7:30pm1st of May 2024, 6:30amA96 Colpy WB - Temporary traffic signals
-
28th of April 2024, 8:00pm29th of April 2024, 6:00amA90 Inchmichael- Lane Closure N/B
-
28th of April 2024, 8:00pm29th of April 2024, 6:00amA90 Inchmichael- Lane Closure S/B
-
28th of April 2024, 8:00pm30th of April 2024, 6:30amM77 NB Jct 5 to M8 - Mobile Lane Closure
-
28th of April 2024, 8:00pm30th of April 2024, 6:30amM77 SB Jct 5 to M8 - Mobile Lane Closure
-
28th of April 2024, 8:00pm29th of April 2024, 6:00amM90 J5-6 - N/B Lane 2 closure
-
28th of April 2024, 8:00pm29th of April 2024, 6:00amM90 J6-5 - S/B Lane 2 closure
-
28th of April 2024, 8:00pm29th of April 2024, 6:00amM90 North of Halbeath - N/B Lane 2 closure
-
28th of April 2024, 8:00pm29th of April 2024, 6:00amM90 North of Halbeath - S/B Lane 2 closure
-
28th of April 2024, 8:00pm30th of April 2024, 6:30amM8 NB Jct 13 to M80 Jct 2 - Mobile Lane Closure
-
28th of April 2024, 8:00pm30th of April 2024, 6:30amM80 SB Jct 2 to M8 - Mobile Lane Closure
-
28th of April 2024, 8:00pm29th of April 2024, 6:00amA90 S/B Scotstoun. Lane Closure.
-
28th of April 2024, 9:00pm30th of April 2024, 6:00amM74 NB J18-J17 - Single Lane Running
-
28th of April 2024, 9:00pm1st of May 2024, 4:00amM74 NB J15-J14 - Single Lane Running
-
28th of April 2024, 9:00pm1st of May 2024, 4:00amM74 SB J14-J15 - Single Lane Running
-
28th of April 2024, 9:00pm4th of May 2024, 6:00amA737 WB - Glebe Rd - Manrahead - Total Closure
-
28th of April 2024, 9:00pm4th of May 2024, 6:00amA737 EB - Manrahead - Glebe Rd - Total Closure
-
28th of April 2024, 10:00pm3rd of May 2024, 6:00amA828 Connel Bridge NB - TTL
-
28th of April 2024, 10:00pm3rd of May 2024, 6:00amA828 Connel Bridge SB - TTL
-
29th of April 2024, 12:01am18th of May 2024, 11:59pmA9000 Forth Road Bridge N/B. Lane Closure
-
29th of April 2024, 12:01am18th of May 2024, 11:59pmA9000 Forth Road Bridge S/B. Lane Closure
-
29th of April 2024, 6:00am3rd of May 2024, 6:00pmA737 SB Hillend Rbt to Dalry Bypass - Contraflow
-
29th of April 2024, 6:00am3rd of May 2024, 6:00pmA737 NB Hillend Rbt to Dalry Bypass - Contraflow
-
29th of April 2024, 7:00am14th of June 2024, 7:00pmA9 Calrossie South of Tain SB - TTL
-
29th of April 2024, 7:00am14th of June 2024, 7:00pmA9 Calrossie South of Tain NB - TTL
-
29th of April 2024, 7:30am30th of April 2024, 7:00pmA887 Invermoriston to Bun Loyne - MLC
-
29th of April 2024, 7:30am3rd of May 2024, 7:00pmA87 Invergarry to Uig - MLC
-
29th of April 2024, 8:00am2nd of May 2024, 4:00pmM74 NB J20-J19 - Lane Closure
-
29th of April 2024, 8:00am3rd of May 2024, 4:00pmA9 Inverness to Dornoch Bridge NB - Vergeworks
-
29th of April 2024, 8:00am3rd of May 2024, 4:00pmA9 Inverness to Dornoch Bridge SB - Vergeworks
-
29th of April 2024, 8:00am30th of April 2024, 5:00pmA76 SB Castle St at Sanquhar - TTLS
-
29th of April 2024, 8:00am30th of April 2024, 5:00pmA76 NB Castle St at Sanquhar - TTLS
-
29th of April 2024, 8:00am1st of May 2024, 6:00pmA95 Boat of Garten NB - Temporary traffic signals
-
29th of April 2024, 8:00am10th of May 2024, 5:00pmA75 WB Between Glasnick & Barlae - Stop Go Boards
-
29th of April 2024, 8:00am10th of May 2024, 5:00pmA75 EB Between Glasnick & Barlae - Stop Go Boards
-
29th of April 2024, 8:00am30th of April 2024, 4:00pmA90 Cruden Bay NB - Temporary traffic signals
-
29th of April 2024, 8:00am30th of April 2024, 7:00pmA78 Inverkip Rd SB at Branchton Station - Lane closure
-
29th of April 2024, 8:00am17th of May 2024, 5:00pmA9 Ballinluig to Bankfoot SB - Signage
-
29th of April 2024, 8:00am17th of May 2024, 5:00pmA9 Ballinluig to Bankfoot NB - Signage
-
29th of April 2024, 8:00am30th of April 2024, 5:00pmA7 - SB - Teviothead - TTL
-
29th of April 2024, 8:00am30th of April 2024, 5:00pmA7 - NB - Teviothead - TTL
-
29th of April 2024, 8:00am30th of April 2024, 5:00pmA1 - SB - Houndwood - Temp lights
-
29th of April 2024, 8:00am30th of April 2024, 5:00pmA1 - NB - Houndwood - Temp lights
-
29th of April 2024, 8:00am3rd of May 2024, 5:00pmA68 - Cafaraemill RBT - Lane closure
-
29th of April 2024, 8:00am29th of April 2024, 2:00pmA82 Loch Dochart East of Crainlarich WB - TTL
-
29th of April 2024, 8:00am29th of April 2024, 2:00pmA82 Loch Dochart East of Crainlarich EB - TTL
-
29th of April 2024, 9:30am29th of April 2024, 3:30pmA78 Irvine Rd Largs SB- TTL
-
29th of April 2024, 9:30am29th of April 2024, 3:30pmA78 Irvine Rd Largs NB- TTL
-
29th of April 2024, 9:30am2nd of May 2024, 3:30pmA96 Pitcaple WB - TTL's
-
29th of April 2024, 9:30am30th of April 2024, 3:30pmM77 NB Jct 4-3 HS Closure
-
29th of April 2024, 9:30am30th of April 2024, 3:30pmM77 SB Jct 3-4 HS Closure
-
29th of April 2024, 9:30am3rd of May 2024, 3:30pmA96 South of Keith - TTL's
-
29th of April 2024, 9:30am29th of April 2024, 3:30pmA76 SB Crosshands Jct - TTLS
-
29th of April 2024, 9:30am29th of April 2024, 3:30pmA76 NB Crosshands Jct - TTLS
-
29th of April 2024, 9:30am29th of April 2024, 3:30pmA737 Beith Bypass between Wardrop St and Geilsland Rd EB - TTLS
-
29th of April 2024, 9:30am29th of April 2024, 3:30pmA737 Beith Bypass between Wardrop St and Geilsland Rd WB - TTLS
-
29th of April 2024, 9:30am29th of April 2024, 3:30pmA9 Stockbridge, Dunblane - N/B Lane 2 closure
-
29th of April 2024, 9:30am12th of May 2024, 4:00pmA78 SB Routenburn to Largs - TTLS
-
29th of April 2024, 9:30am29th of April 2024, 3:30pmA9 Approach to Broxden - N/B Lane 2 closure
-
29th of April 2024, 9:30am12th of May 2024, 4:00pmA78 NB Routenburn to Largs - TTLS
-
29th of April 2024, 9:30am29th of April 2024, 3:30pmA95 Aberlour- TTL S/B
-
29th of April 2024, 9:30am29th of April 2024, 3:30pmA68 N/B at Faladam. Stop/Go Boards.
-
29th of April 2024, 9:30am29th of April 2024, 3:30pmA68 S/B at Faladam. Stop/Go Boards.
-
29th of April 2024, 9:30am29th of April 2024, 3:30pmA75 Palnure to Spittal WB - TTLS
-
29th of April 2024, 9:30am29th of April 2024, 3:30pmA75 Spittal to Palnure EB - TTLS
-
29th of April 2024, 9:30am29th of April 2024, 3:30pmA725 Whirlies Bypass WB H/S Closure
-
29th of April 2024, 9:30am30th of April 2024, 3:30pmA90 Cortes- TTL N/B
-
29th of April 2024, 9:30am3rd of May 2024, 6:00pmA738 NB Stevenston Rd Kilwinning - TTLS
-
29th of April 2024, 9:30am3rd of May 2024, 6:00pmA738 SB Stevenston Rd Kilwinning - TTLS
-
29th of April 2024, 9:30am29th of April 2024, 6:00pmA84 Main Street Callander SB - TTL
-
29th of April 2024, 9:30am29th of April 2024, 6:00pmA84 Main Street Callander NB - TTL
-
29th of April 2024, 9:30am3rd of May 2024, 3:30pmM8 Jct 10 to jct 31 WB mobile Hard Shoulder GG115
-
29th of April 2024, 9:30am3rd of May 2024, 3:30pmM8 jct 10 to jct 31 EB - mobile Hard Shoulder GG115
-
29th of April 2024, 9:30am10th of May 2024, 3:30pmA68 - SB - Jedburgh - Temp lights
-
29th of April 2024, 9:30am10th of May 2024, 3:30pmA68 - NB - Jedburgh - Temp lights
-
29th of April 2024, 9:30am29th of April 2024, 3:30pmM8 Eastbound Junction 9 off-slip -Total closure
-
29th of April 2024, 7:00pm10th of May 2024, 6:00amA78 SB Irvine Road Hunterston Rbt to West Kilbride - TTLS
-
29th of April 2024, 7:00pm10th of May 2024, 6:00amA78 NB Irvine Road Hunterston Rbt to West Kilbride - TTLS
-
29th of April 2024, 7:00pm9th of May 2024, 6:00amA9 Auchbain to B851 Jnct North of Moy SB - Lane Closure
-
29th of April 2024, 7:00pm1st of May 2024, 6:00amA9 South of Munlochy Inverness NB - Convoy Works
-
29th of April 2024, 7:00pm1st of May 2024, 6:00amA9 South of Munlochy Inverness SB - Lane Closure
-
29th of April 2024, 7:30pm1st of May 2024, 6:00amA720 - EB - Sheriffhall to Old Craighall - Closure
-
29th of April 2024, 7:30pm30th of April 2024, 6:30amA92 Preston Roundabout TTL N/B
-
29th of April 2024, 7:30pm30th of April 2024, 6:30amA90 North of Brechin- Lane Closure N/B
-
29th of April 2024, 7:30pm30th of April 2024, 6:30amA90 Marykirk- Lane Closure S/B
-
29th of April 2024, 7:30pm30th of April 2024, 6:30amA90 Brechin- Lane Closure N/B
-
29th of April 2024, 7:30pm1st of May 2024, 6:30amA95 Drumullie- TTL S/B
-
29th of April 2024, 8:00pm30th of April 2024, 6:00amM73 Northbound Junction 2 to Junction 2A - Nearside lane closure
-
29th of April 2024, 8:00pm30th of April 2024, 6:00amA8 Greenock Road between Langbank Rbt and M8 Jct 31 EB - Convoy Working
-
29th of April 2024, 8:00pm1st of May 2024, 6:00amA96 Newton of Petty - TTL's
-
29th of April 2024, 8:00pm1st of May 2024, 6:00amM74 SB Jct 6 on slip from Motherwell- Closure
-
29th of April 2024, 8:00pm1st of May 2024, 6:00amM74 NB Jct 6 on slip from Motherwell- Closure
-
29th of April 2024, 8:00pm30th of April 2024, 6:00amM73 Southbound to M74 Northbound link road - Nearside lane closure
-
29th of April 2024, 8:00pm2nd of May 2024, 6:00amA75 E/B Castle Douglas Road Crocketford TTL's
-
29th of April 2024, 8:00pm2nd of May 2024, 6:00amA75/A712 E/B Maiden Row TTL's
-
29th of April 2024, 8:00pm2nd of May 2024, 6:00amA75 W/B Castle Douglas Road Crocketford TTL's
-
29th of April 2024, 8:00pm30th of April 2024, 6:00amM90 Kelty (J4) - S/B Lane 2 closure
-
29th of April 2024, 8:00pm30th of April 2024, 6:00amM90 Kelty (J4) - N/B Lane 2 closure
-
29th of April 2024, 8:00pm30th of April 2024, 6:00amM90 Balmanno, Sth of Jct 9 Bridge of Earn - N/B Lane 1 closure
-
29th of April 2024, 8:00pm30th of April 2024, 6:00amA823(M) - NB - Lane closure
-
29th of April 2024, 8:00pm5th of May 2024, 6:30amA726 NB to A725 - Mobile Lane Closure
-
29th of April 2024, 8:00pm5th of May 2024, 6:30amA725 SB to A726 - Mobile Lane Closures
-
29th of April 2024, 8:00pm5th of May 2024, 6:30amM8 WB Jct 10 to Jct 28 - Mobile Lane Closure
-
29th of April 2024, 8:00pm5th of May 2024, 6:30amM8 EB Jct 28 to Jct 10 - Mobile Lane Closure
-
29th of April 2024, 8:00pm2nd of May 2024, 6:00amM90 - NB - Jct 1B to 1C - Closure 1b Lane closure 1b to 1c
-
29th of April 2024, 8:00pm1st of May 2024, 5:00amA84 Strathyre NB - Road Closure with Amnesties
-
29th of April 2024, 8:00pm1st of May 2024, 5:00amA84 Strathyre SB - Road Closure with Amnesties
-
29th of April 2024, 8:00pm2nd of May 2024, 6:00amM90 - NB - Jct 1B to 1C - Lane closure
-
29th of April 2024, 8:00pm30th of April 2024, 4:00amA1 S/B Torness Power Station. Lane Closure.
-
29th of April 2024, 8:00pm30th of April 2024, 4:00amM9 S/B Jct 10 Off-Slip. Lane Closure
-
29th of April 2024, 8:00pm30th of April 2024, 4:00amM9 S/B Jct 10 On-Slip. Lane Closure.
-
29th of April 2024, 8:00pm11th of May 2024, 6:00amM8 WB Jct 24 - 25 - Total Closure
-
29th of April 2024, 8:00pm30th of April 2024, 6:00amM80 S/B J3 Hornshill off-slip - Sliproad Closure
-
29th of April 2024, 8:00pm11th of May 2024, 6:00amM8 Jct 24 WB Onslip - Total Closure
-
29th of April 2024, 8:00pm11th of May 2024, 6:00amM8 Jct 25 WB offslip - Total Closure
-
29th of April 2024, 8:00pm30th of April 2024, 6:00amM80 N/B J5 Auchenkilns off-slip - Sliproad Closure
-
29th of April 2024, 8:00pm11th of May 2024, 6:00amM8 WB Secondary Carriageway Link M74 - Total Closure
-
29th of April 2024, 8:00pm30th of April 2024, 6:00amM80 S/B J7 Haggs off-slip - Sliproad Closure
-
29th of April 2024, 8:00pm30th of April 2024, 6:00amM80 S/B J7 Haggs on-slip - Sliproad Closure
-
29th of April 2024, 8:00pm30th of April 2024, 6:00amM80 S/B J6 Old Inns off-slip - Sliproad Closure
-
29th of April 2024, 8:00pm30th of April 2024, 6:00amA78 SB Montfode Rbt to Chapelhill Rbt - Road Closure
-
29th of April 2024, 8:00pm30th of April 2024, 6:00amA78 SB Chapelhill Rbt to Sharphill Rbt - Road Closure
-
29th of April 2024, 8:00pm1st of May 2024, 6:00amU105/A78 Collenan Road OB EB - TTLs
-
29th of April 2024, 8:00pm30th of April 2024, 6:00amA78 SB Sharphill Rbt to Pennyburn Rbt -Road Closure
-
29th of April 2024, 8:00pm30th of April 2024, 6:00amA78 SB Pennyburn Rbt to Eglinton IC Road Closure
-
29th of April 2024, 8:00pm30th of April 2024, 6:00amA78 SB Eglinton off slip - Slip Closure
-
29th of April 2024, 8:00pm30th of April 2024, 6:00amA725 Northbound Diamond to M8 Eastbound merge - Total closure
-
29th of April 2024, 8:00pm1st of May 2024, 6:00amM74 Northbound Junction 5 to Junction 4- Nearside & Adjacent lane closure
-
29th of April 2024, 8:00pm30th of April 2024, 6:00amM8 WB Jct 30 - 31 Lane Closures
-
29th of April 2024, 8:30pm17th of May 2024, 6:00amA720 - WB - Lothianburn to Caulder - lane closure
-
30th of April 2024, 6:00am3rd of May 2024, 5:00pmA701 NB from B7020 to B7076 South of Beattock - Road Part of a Diversion Route
-
30th of April 2024, 6:00am3rd of May 2024, 5:00pmA701 NB from B7020 to B7076 South of Beattock - Road Part of a Diversion Route
-
30th of April 2024, 6:01am2nd of May 2024, 1:00pmA737 EB Manrahead - Glebe Rd - Daytime TTL's
-
30th of April 2024, 8:00am30th of April 2024, 4:00pmM74 SB J14-J15 - Lane Closure
-
30th of April 2024, 8:00am30th of April 2024, 4:00pmM74 SB J15-J16 - Lane Closure
-
30th of April 2024, 8:00am30th of April 2024, 11:00amA9 Trentham North of Dornoch - Stop/Go Works
-
30th of April 2024, 8:00am3rd of May 2024, 5:00pmA7 - NB - North of Hawick - Temp lights
-
30th of April 2024, 8:00am13th of May 2024, 3:30pmA68 S/B 1 mile south of Ancrum. Temporary Traffic Lights.
-
30th of April 2024, 8:00am13th of May 2024, 3:30pmA68 N/B 1 mile south of Ancrum. Temporary Traffic Lights.
-
30th of April 2024, 8:00am30th of April 2024, 12:00pmA82 Inverarnan NB - TTL
-
30th of April 2024, 8:00am30th of April 2024, 12:00pmA82 Inverarnan SB - TTL
-
30th of April 2024, 8:30am30th of April 2024, 6:00pmA87 Sheil Bridge WB - TTL
-
30th of April 2024, 8:30am30th of April 2024, 6:00pmA87 Sheil Bridge EB - TTL
-
30th of April 2024, 9:00am30th of April 2024, 3:00pmA82 North of Alltsigh NB - TTL
-
30th of April 2024, 9:00am30th of April 2024, 3:00pmA82 North of Alltsigh SB - TTL
-
30th of April 2024, 9:00am30th of April 2024, 7:00pmA83 West of Strone Point Inveraray - Stop/Go Works
-
30th of April 2024, 9:30am30th of April 2024, 3:30pmM90 Glenfarg SB - Lane closure
-
30th of April 2024, 9:30am30th of April 2024, 3:30pmA9 Approach to Abbey Bridge, Auchterarder - N/B Lane 2 closure
-
30th of April 2024, 9:30am30th of April 2024, 3:30pmA9 Windyedge, Tibbermore Jct - S/B Lane 1 closure
-
30th of April 2024, 9:30am3rd of May 2024, 2:00pmA9 Tomatin to Moy - Vergeworks
-
30th of April 2024, 9:30am30th of April 2024, 4:00pmA76 Crossroads Roundabout SB - TTLs
-
30th of April 2024, 9:30am30th of April 2024, 4:00pmA76 Crossroads Roundabout NB - TTLs
-
30th of April 2024, 9:30am1st of May 2024, 3:30pmA82 Great Western Rd prior to Bowling NB - Lane Closure
-
30th of April 2024, 9:30am1st of May 2024, 3:30pmA82 Stirling Rd prior to Milton SB - Lane Closure
-
30th of April 2024, 9:30am30th of April 2024, 3:30pmA95 Advie TTL S/B
-
30th of April 2024, 9:30am1st of May 2024, 3:30pmA95 Ballindalloch- TTL S/B
-
30th of April 2024, 9:30am1st of May 2024, 3:30pmA7 2 Miles south of Selkirk. Stop/Go Boards
-
30th of April 2024, 9:30am30th of April 2024, 3:30pmA75 EB at B733 Jct for Kirkcowan - TTLS
-
30th of April 2024, 9:30am1st of May 2024, 3:30pmA7 2 Miles south of Selkirk. Stop/Go Boards
-
30th of April 2024, 9:30am30th of April 2024, 3:30pmA75 WB at B733 Jct for Kirkcowan - TTLS
-
30th of April 2024, 9:30am30th of April 2024, 3:30pmA75 between Barlae and Glenluce WB - TTLS
-
30th of April 2024, 9:30am30th of April 2024, 3:30pmA75 between Barlae and Glenluce EB - TTLS
-
30th of April 2024, 9:30am30th of April 2024, 3:30pmA77 Main Road North Minishant SB TTLs
-
30th of April 2024, 9:30am30th of April 2024, 3:30pmA77 Main Road North Minishant NB TTLs
-
30th of April 2024, 9:30am2nd of May 2024, 3:30pmA725 Whistleberry Road SB - TTL's
-
30th of April 2024, 9:30am1st of May 2024, 3:30pmA75 WB at Hermitage - TTLS
-
30th of April 2024, 9:30am1st of May 2024, 3:30pmA75 EB at Hermitage - TTLS
-
30th of April 2024, 9:30am30th of April 2024, 3:30pmA1 S/B Dunbar. Lane Closure.
-
30th of April 2024, 9:30am30th of April 2024, 3:30pmM8 Eastbound Junction 8 on-slip - Total closure
-
30th of April 2024, 9:30am30th of April 2024, 3:30pmM8 Eastbound Newhouse on-slip - Total closure
-
30th of April 2024, 10:00am30th of April 2024, 2:00pmA82 Glen Falloch North of Inverarnan NB - TTL
-
30th of April 2024, 10:00am30th of April 2024, 2:00pmA82 Glen Falloch North of Inverarnan SB - TTL
-
30th of April 2024, 10:00am2nd of May 2024, 11:59pmA90 North of Longforgan- No Obstruction S/B
-
30th of April 2024, 10:00am2nd of May 2024, 11:59pmA90 North of Longforgan- No Obstruction N/B
-
30th of April 2024, 11:00am30th of April 2024, 1:00pmA9 Brora - Stop/Go Works
-
30th of April 2024, 12:00pm30th of April 2024, 4:00pmA82 Crainlarich NB - TTL
-
30th of April 2024, 12:00pm30th of April 2024, 4:00pmA82 Crainlarich SB - TTL
-
30th of April 2024, 1:00pm30th of April 2024, 4:30pmA9 Lothmore South of Helmsdale - Stop/Go Works
-
30th of April 2024, 7:00pm2nd of May 2024, 6:00amM74 NB J21 EXIT SLIP ROAD - Road Closure
-
30th of April 2024, 7:30pm1st of May 2024, 6:30amA92 Halbeath Roundabout- MLC N/B
-
30th of April 2024, 7:30pm1st of May 2024, 6:30amA90 Portlethen- Lane Closure N/B
-
30th of April 2024, 7:30pm1st of May 2024, 6:30amA92 Findon, North of Portlethen- Lane Closure S/B
-
30th of April 2024, 7:30pm1st of May 2024, 6:30amA96 Skares, Huntly- TTL E/B
-
30th of April 2024, 7:30pm1st of May 2024, 6:30amA96 Battlehill, Huntly- TTL E/B
-
30th of April 2024, 8:00pm1st of May 2024, 6:00amA82 Great Western Rd after Dunglass Rbt SB - Lane Closure
-
30th of April 2024, 8:00pm1st of May 2024, 6:00amA96 Blackhillock, Sth of Keith - S/B TTL's
-
30th of April 2024, 8:00pm1st of May 2024, 6:00amA96 Blackburn, North of Clinterty Rbt - N/B Lane 1 closure
-
30th of April 2024, 8:00pm1st of May 2024, 6:00amA77 Glengall SB TTL
-
30th of April 2024, 8:00pm1st of May 2024, 6:00amA77 Glengall NB- TTL
-
30th of April 2024, 8:00pm1st of May 2024, 6:00amM876 - WB - Jct 1 - Lane closure
-
30th of April 2024, 8:00pm3rd of May 2024, 6:00amM8 WB Jct 28 to M8 Jct 31 - Mobiles
-
30th of April 2024, 8:00pm3rd of May 2024, 6:00amM8 EB Jct 31 to M8 Jct 28 - Mobiles
-
30th of April 2024, 8:00pm3rd of May 2024, 6:30amA78 SB Braeside to inverkip - Mobile Lane Closure
-
30th of April 2024, 8:00pm3rd of May 2024, 6:30amA78 NB Inverkip to Braeside - Mobile Lane Closure
-
30th of April 2024, 8:00pm3rd of May 2024, 6:30amA8 WB Langbank to A8 Bullring - Mobile Lane Closures
-
30th of April 2024, 8:00pm3rd of May 2024, 6:30amA8 EB Bullring to A8 Langbank Mobile Lane Closures
-
30th of April 2024, 8:00pm3rd of May 2024, 6:30amM8 WB Jct 28 to M8 Jct 31 - Mobiles Lane Closure
-
30th of April 2024, 8:00pm3rd of May 2024, 6:30amM8 EB Jct 31 to M8 Jct 28 - Mobile Lane Closures
-
30th of April 2024, 8:00pm3rd of May 2024, 6:30amM898 NB to A82 - Mobile Lane Closures
-
30th of April 2024, 8:00pm3rd of May 2024, 6:30amA82 SB slips to M898 Mobile Lane Closure
-
30th of April 2024, 8:00pm3rd of May 2024, 6:30amA82 NB to Stoneymollan - Mobile Lane Closure
-
30th of April 2024, 8:00pm3rd of May 2024, 6:30amA82 SB Stoneymollan to A898 off slip Mobile Lane Closure
-
30th of April 2024, 8:00pm3rd of May 2024, 6:30amA737 WB jct 28a to Kilbarchan - Mobile lane closure
-
30th of April 2024, 8:00pm3rd of May 2024, 6:30amA737 EB Kilbarchan to M8 slips - Mobile Lane Closures
-
30th of April 2024, 8:00pm1st of May 2024, 4:00amA7 N/B Hawick south of Galalaw Roundabout. Temporary Traffic Lights.
-
30th of April 2024, 8:00pm1st of May 2024, 4:00amA7 S/B Hawick south of Galalaw Roundabout. Temporary Traffic Lights.
-
30th of April 2024, 8:00pm1st of May 2024, 6:00amA82 NB Stirling Rd at junction with Strowanswell Road Lane Closures
-
30th of April 2024, 8:00pm1st of May 2024, 6:00amA737 SB Between the slips at Johnstone - Lane Closure
-
30th of April 2024, 8:00pm1st of May 2024, 6:00amA737 NB Between the slips at Johnstone - Lane Closure
-
30th of April 2024, 8:00pm1st of May 2024, 4:00amM9 N/B Jct 10 Off-slip. Lane Closure
-
30th of April 2024, 8:00pm1st of May 2024, 6:00amM80 N/B J4 Westfield off-slip - Sliproad Closure
-
30th of April 2024, 8:00pm1st of May 2024, 6:00amM80 N/B J6 Old Inns off-slip - Sliproad Closure
-
30th of April 2024, 8:00pm1st of May 2024, 6:00amM80 N/B J7 Haggs off-slip - Sliproad Closure
-
30th of April 2024, 8:00pm1st of May 2024, 6:00amM80 N/B J7 Haggs on-slip - Sliproad Closure
-
30th of April 2024, 8:00pm1st of May 2024, 6:00amM80 S/B J6a Castlecary off-slip - Sliproad Closure
-
30th of April 2024, 8:00pm2nd of May 2024, 6:00amC32/A78 Old Loans Rd OB NB - TTLs
-
30th of April 2024, 8:00pm1st of May 2024, 6:00amA78 NB Onslip Irvine Bypass Slip Closure
-
30th of April 2024, 8:00pm1st of May 2024, 6:00amA78 NB Eglinton IC to Pennyburn Rbt - Road Closure
-
30th of April 2024, 8:00pm1st of May 2024, 6:00amA78 NB Pennyburn Rbt to Sharphill Rbt - Road Closure
-
30th of April 2024, 8:00pm1st of May 2024, 6:00amA78 NB Sharphill Rbt to Chapelhill Rbt - Road Closure
-
30th of April 2024, 8:00pm1st of May 2024, 6:00amA78 NB Chapelhill Rbt to Montfode Rbt - Road closure
-
30th of April 2024, 8:00pm1st of May 2024, 6:00amA8 Westbound Chapelhall South Rbt - Inner ring closure
-
30th of April 2024, 9:00pm2nd of May 2024, 6:00amM74 NB J22-J21 - Single Lane Running
-
1st of May 2024, 12:01am31st of March 2028, 11:59pmM876- EB- Whole route - HS
-
1st of May 2024, 12:01am31st of March 2028, 11:59pmM876-wb- Whole route - HS
-
1st of May 2024, 8:00am1st of May 2024, 4:00pmM74 NB J22-J21 - Lane Closure
-
1st of May 2024, 8:00am1st of May 2024, 4:00pmA9 Nth of Keir Rbt, Dunblane - N/B Verge works
-
1st of May 2024, 8:00am3rd of May 2024, 5:00pmA96 Blackburn WB - Diversion signage for local road closure
-
1st of May 2024, 8:00am1st of May 2024, 4:00pmA90 Milton of Philorth NB - Temporary traffic signals
-
1st of May 2024, 8:00am2nd of May 2024, 5:00pmA1 - SB - Gladsmuir to Oaktree - Lane closure
-
1st of May 2024, 8:30am3rd of May 2024, 5:00pmA75 East of Creetown EB - TTLS
-
1st of May 2024, 8:30am3rd of May 2024, 5:00pmA75 East of Creetown WB - TTLS
-
1st of May 2024, 9:30am1st of May 2024, 12:00pmA82 Balloch NB - TTL
-
1st of May 2024, 9:30am1st of May 2024, 12:00pmA82 Balloch SB - TTL
-
1st of May 2024, 9:30am1st of May 2024, 3:30pmM8 EB Jct 11 Onslip - Route part of Diversion
-
1st of May 2024, 9:30am1st of May 2024, 3:30pmM8 Westbound Junction 8 off-slip - Total closure
-
1st of May 2024, 9:30am1st of May 2024, 3:30pmM90 Glenfarg NB - Lane closure
-
1st of May 2024, 9:30am1st of May 2024, 3:30pmA9 Shandale, Nth of Dunblane - S/B Lane 1 closure
-
1st of May 2024, 9:30am1st of May 2024, 4:00pmA76 Skerrington Roundabout SB - TTLs
-
1st of May 2024, 9:30am1st of May 2024, 4:00pmA76 Skerrington Roundabout NB - TTLs
-
1st of May 2024, 9:30am1st of May 2024, 3:30pmA751 @ A77 Jct @ Innermessan NB - TTLS
-
1st of May 2024, 9:30am1st of May 2024, 3:30pmA751 @ A77 Jct @ Innermessan SB - TTLS
-
1st of May 2024, 9:30am1st of May 2024, 3:30pmA75 Castle Kennedy WB - TTLS
-
1st of May 2024, 9:30am1st of May 2024, 3:30pmA75 Castle Kennedy EB - TTLS
-
1st of May 2024, 9:30am1st of May 2024, 3:30pmA76 Kilmarnock Road Mauchline SB TTL
-
1st of May 2024, 9:30am1st of May 2024, 3:30pmA76 Kilmarnock Road Mauchline NB TTL
-
1st of May 2024, 9:30am1st of May 2024, 3:30pmA76 Catrine @ B713 Jct SB- TTL
-
1st of May 2024, 9:30am1st of May 2024, 3:30pmA76 Catrine @ B713 Jct NB- TTL
-
1st of May 2024, 9:30am1st of May 2024, 3:30pmM8 Eastbound Junction 10 on-slip - Total closure
-
1st of May 2024, 9:30am2nd of May 2024, 4:00pmA83 North of Artilligan South of Inverneil - Stop/Go Works
-
1st of May 2024, 9:30am1st of May 2024, 6:00pmA76 SB Glasgow Rd Sanquhar - TTLs
-
1st of May 2024, 9:30am1st of May 2024, 6:00pmA76 NB Glasgow Rd Sanquhar - TTLs
-
1st of May 2024, 10:00am1st of May 2024, 2:00pmA82 Culag South of Inverbeg NB - TTL
-
1st of May 2024, 10:00am1st of May 2024, 2:00pmA82 Culag South of Inverbeg SB - TTL
-
1st of May 2024, 10:00am1st of May 2024, 3:30pmA90 Portlethen- Diversion signage
-
1st of May 2024, 10:00am1st of May 2024, 11:30amA702 - SB - South of Biggar - Temp lights
-
1st of May 2024, 10:00am1st of May 2024, 11:30amA702 - NB - South of Biggar - Temp lights
-
1st of May 2024, 11:00am1st of May 2024, 3:00pmA9 Aviemore - Vergeworks
-
1st of May 2024, 11:30am1st of May 2024, 1:30pmA9 Tore Roundabout - Stop/Go Works
-
1st of May 2024, 12:00pm1st of May 2024, 4:00pmA82 Firkin Point North of Inverbeg NB - TTL
-
1st of May 2024, 12:00pm1st of May 2024, 4:00pmA82 Firkin Point North of Inverbeg SB - TTL
-
1st of May 2024, 7:00pm2nd of May 2024, 6:00amM80 - NB - Jct 8 to 9 - Hardshoulder
-
1st of May 2024, 7:00pm2nd of May 2024, 6:00amA75 Cairntop Dual Dervaird WB Convoy
-
1st of May 2024, 7:00pm2nd of May 2024, 6:00amA75 Carintop Dual Dervaird EB Convoy
-
1st of May 2024, 7:00pm2nd of May 2024, 7:00amA82 Tarbet - Narrow Lane
-
1st of May 2024, 7:30pm2nd of May 2024, 6:30amA96 Ardersier Jct - TTL's
-
1st of May 2024, 7:30pm2nd of May 2024, 6:00amA720 - Old Craighall Roundabout - lane closure
-
1st of May 2024, 7:30pm2nd of May 2024, 3:30pmA92 North of Preston Roundabout-TTL N/B
-
1st of May 2024, 7:30pm2nd of May 2024, 6:30amA92 Stonehaven- Lane Closure N/B
-
1st of May 2024, 7:30pm2nd of May 2024, 6:30amA90 Fourdon- Lane Closure N/B
-
1st of May 2024, 7:30pm2nd of May 2024, 6:30amA92 At AWPR- lane Closure S/B
-
1st of May 2024, 7:30pm2nd of May 2024, 6:30amA95 Ballindalloch- TTL S/B
-
1st of May 2024, 7:30pm2nd of May 2024, 6:30amA95 Cromdale- TTL S/B
-
1st of May 2024, 8:00pm2nd of May 2024, 6:00amA725 WB E Kilbride Expy Between Bothwell and Bantrye - Route part of Diversion
-
1st of May 2024, 8:00pm2nd of May 2024, 6:00amA725 EB E Kilbride Expy Between Bothwell and Bantrye - Route part of Diversion
-
1st of May 2024, 8:00pm2nd of May 2024, 6:00amA8 Westbound Nearside lane closure at Showcase off-slip
-
1st of May 2024, 8:00pm2nd of May 2024, 6:00amA8 Westbound Showcase off-slip - Total closure
-
1st of May 2024, 8:00pm2nd of May 2024, 6:00amM8 WB Jct 29 On slip Total Closure
-
1st of May 2024, 8:00pm2nd of May 2024, 6:00amM8 WB Jct 29 Lane Closure
-
1st of May 2024, 8:00pm2nd of May 2024, 6:00amA737 WB onslip from M8 Jct 29 WB - Lane Closure
-
1st of May 2024, 8:00pm2nd of May 2024, 6:00amA9 Dunblane - S/B Lane 1 closure
-
1st of May 2024, 8:00pm2nd of May 2024, 6:00amA9 Sth of Tarneybackle, Blackford - N/B Lane 2 closure
-
1st of May 2024, 8:00pm2nd of May 2024, 6:00amA9 Sth of Tarneybackle, Blackford - S/B Lane 2 closure
-
1st of May 2024, 8:00pm2nd of May 2024, 6:00amM80-SB-Jct 9 to jct 8 - Lane closure
-
1st of May 2024, 8:00pm2nd of May 2024, 6:00amM90 - NB - Jct 1b mainline - Closure
-
1st of May 2024, 8:00pm2nd of May 2024, 6:00amM90 - SB - Jct 1c to Jct 1b mainline - Lane closure
-
1st of May 2024, 8:00pm3rd of May 2024, 5:00amA84 Runacraig South of Strathyre NB - Road Closure with Amnesties
-
1st of May 2024, 8:00pm3rd of May 2024, 5:00amA84 Runacraig South of Strathyre SB - Road Closure with Amnesties
-
1st of May 2024, 8:00pm9th of May 2024, 6:00amM74 NB Jct 3a to M8 jct 20 - Mobile Lane Closure
-
1st of May 2024, 8:00pm9th of May 2024, 6:00amM74 SB Jct 1 to Jct 3a - Mobile Lane Closures
-
1st of May 2024, 8:00pm9th of May 2024, 6:00amM74 SB Jct 6 to Jct 12 - Mobile Lane Closure
-
1st of May 2024, 8:00pm9th of May 2024, 6:00amM74 NB Jct 12 to Jct 6 - Mobile Lane Closure
-
1st of May 2024, 8:00pm2nd of May 2024, 4:00amA68 N/B Newton St Boswells. Temporary Traffic Lights
-
1st of May 2024, 8:00pm2nd of May 2024, 4:00amA68 S/B Newton St Boswells. Temporary Traffic Lights
-
1st of May 2024, 8:00pm3rd of May 2024, 6:00amA75 EB Prior to Bloomfield Rbt - TTLS
-
1st of May 2024, 8:00pm3rd of May 2024, 6:00amA75 WB Prior to Bloomfield Rbt - TTLS
-
1st of May 2024, 8:00pm4th of May 2024, 8:00amA76 @ Blackwood Farm NB New Cumnock - TTLs
-
1st of May 2024, 8:00pm4th of May 2024, 6:00amA76 @ Blackwood Farm SB New Cumnock - TTLs
-
1st of May 2024, 8:00pm3rd of May 2024, 6:00amM74 Avonmil Road OB - TTLS
-
1st of May 2024, 8:00pm2nd of May 2024, 6:00amA78 NB - Monktonhead Rbt to Meadowhead Rbt - Road closure
-
1st of May 2024, 8:00pm2nd of May 2024, 6:00amA78 NB - Loans off slip - Slip Closure
-
1st of May 2024, 8:00pm2nd of May 2024, 6:00amA78 NB - Loans on slip - Slip Closure
-
1st of May 2024, 8:00pm2nd of May 2024, 6:00amA78 NB - Barassie off slip - Slip closure
-
1st of May 2024, 8:00pm2nd of May 2024, 6:00amA78 SB Eglinton IC to Meadowhead Rbt -Road closure
-
1st of May 2024, 8:00pm2nd of May 2024, 6:00amA78 SB Eglinton IC on slip - Slip Closure
-
1st of May 2024, 8:00pm2nd of May 2024, 6:00amA78 SB Warrix IC off slip - Slip Closure
-
1st of May 2024, 8:00pm2nd of May 2024, 6:00amM8 Westbound Junction 8 main line - offside lane closure
-
1st of May 2024, 8:00pm2nd of May 2024, 6:00amA78 SB Warrix IC on slip - Slip Closure
-
1st of May 2024, 8:00pm2nd of May 2024, 6:00amM8 Westbound Junction 8 on-slip - Total closure
-
1st of May 2024, 8:00pm2nd of May 2024, 6:00amA78 SB Newhouse off slip- Slip Closure
-
1st of May 2024, 8:00pm2nd of May 2024, 6:00amA78 SB Newhouse IC on slip - Slip Closure
-
1st of May 2024, 10:00pm2nd of May 2024, 6:00amA737 SB From B787 to Roadhead Rbt - Total Closure
-
1st of May 2024, 10:00pm2nd of May 2024, 6:00amA737 NB From Roadhead Rbt to B737 - Total Closure
-
2nd of May 2024, 6:01am30th of May 2024, 9:59pmA737 SB Elliston IC (South of Howwood) - lane closure (TTL)
-
2nd of May 2024, 8:00am2nd of May 2024, 2:00pmA82 Kenmore Wood South of Inveruglas NB - TTL
-
2nd of May 2024, 8:00am2nd of May 2024, 2:00pmA82 Kenmore Wood South of Inveruglas SB - TTL
-
2nd of May 2024, 8:00am5th of May 2024, 11:59pmA82 Fort Wiliam to Spean Bridge - Signage
-
2nd of May 2024, 8:00am5th of May 2024, 11:59pmA86 Spean Bridge - Signage
-
2nd of May 2024, 8:00am3rd of May 2024, 4:00pmA90 Peterhead bypass NB - Temporary traffic signals
-
2nd of May 2024, 9:00am2nd of May 2024, 4:30pmA90 Marykirk, Laurencekirk - Diversion signage for local road closure
-
2nd of May 2024, 9:30am2nd of May 2024, 3:30pmM8 WB Jct 11 Onslip - Route Part of Diversion.
-
2nd of May 2024, 9:30am2nd of May 2024, 3:30pmM90 Glenfarg SB - Lane closure
-
2nd of May 2024, 9:30am2nd of May 2024, 3:30pmA9 Glassingal, Nth of Dunblane - N/B Lane 1 closure
-
2nd of May 2024, 9:30am2nd of May 2024, 3:30pmA725 Kingsway prior to Whirlies Rbt EB - Lane Closure
-
2nd of May 2024, 9:30am2nd of May 2024, 3:30pmA76 SB South of Closeburn - TTLS
-
2nd of May 2024, 9:30am2nd of May 2024, 3:30pmA76 NB South of Closeburn - TTLS
-
2nd of May 2024, 9:30am2nd of May 2024, 3:30pmA95 Craigellachie- TTL N/B
-
2nd of May 2024, 9:30am2nd of May 2024, 3:30pmA75 Kirkcowan prior to B735 Jct EB - TTLS
-
2nd of May 2024, 9:30am2nd of May 2024, 3:30pmA75 Kirkcowan after B735 Jct WB - TTLS
-
2nd of May 2024, 9:30am2nd of May 2024, 3:30pmA76 after Marchburn Layby SB - TTLS
-
2nd of May 2024, 9:30am2nd of May 2024, 3:30pmA76 prior to Marchburn Layby NB - TTLS
-
2nd of May 2024, 9:30am3rd of May 2024, 3:30pmA7 2 Miles north of Hawick. Stop/Go Boards.
-
2nd of May 2024, 9:30am3rd of May 2024, 3:30pmA7 2 Miles north of Hawick. Stop/Go Boards.
-
2nd of May 2024, 9:30am2nd of May 2024, 3:30pmA77 Watertanks Ballantrae SB - TTLS
-
2nd of May 2024, 9:30am2nd of May 2024, 3:30pmA77 Watertanks Ballantrae NB - TTLS
-
2nd of May 2024, 9:30am3rd of May 2024, 12:30pmA96 Alves - TTL's
-
2nd of May 2024, 9:30am2nd of May 2024, 3:30pmA90 Crimmond- TTL N/B
-
2nd of May 2024, 9:30am2nd of May 2024, 3:30pmA726 Queensway @ Righead Rbt WB Lane Closure
-
2nd of May 2024, 9:30am5th of June 2024, 4:00pmA76 Dettingen Roundabout SB - Lane Closure
-
2nd of May 2024, 9:30am5th of June 2024, 4:00pmA76 Dettingen Roundabout NB - Lane Closure
-
2nd of May 2024, 9:30am3rd of June 2024, 4:00pmA76 Garleffan Roundabout SB - TTLs
-
2nd of May 2024, 9:30am3rd of June 2024, 4:00pmA76 Garleffan Roundabout NB - TTLs
-
2nd of May 2024, 9:30am2nd of May 2024, 3:30pmM8 Westbound Junction 10 on-slip - Total closure
-
2nd of May 2024, 9:30am2nd of May 2024, 3:30pmM8 Westbound Junction 7 Eurocentral on-slip - total closure
-
2nd of May 2024, 12:00pm2nd of May 2024, 4:00pmA82 North of Inveruglas NB - TTL
-
2nd of May 2024, 12:00pm2nd of May 2024, 4:00pmA82 North of Inveruglas SB - TTL
-
2nd of May 2024, 7:00pm6th of May 2024, 6:00amA77 Cairnryan Rd NB Road Closure
-
2nd of May 2024, 7:00pm6th of May 2024, 6:00amA77 Cairnryan Rd SB Road Closure
-
2nd of May 2024, 7:30pm3rd of May 2024, 2:00amA96 Nairn - TTL's
-
2nd of May 2024, 7:30pm3rd of May 2024, 6:30amA96 West Rd, Elgin- TTL W/B
-
2nd of May 2024, 7:30pm4th of May 2024, 6:00amA720 - WB - Old Craighall to Sherrifhall Rbt - Closure
-
2nd of May 2024, 7:30pm3rd of May 2024, 6:30amA96 Brodie- TTL W/B
-
2nd of May 2024, 8:00pm3rd of May 2024, 6:00amM8 WB Jct 10 to 12 - Lane Closures
-
2nd of May 2024, 8:00pm3rd of May 2024, 6:00amM74 Jct 10 Nethan Bridge SB - Lane Closure
-
2nd of May 2024, 8:00pm3rd of May 2024, 6:00amM74 Jct 10 onslip SB - Total Closure
-
2nd of May 2024, 8:00pm3rd of May 2024, 6:00amM8 EB Jct 15 onslip from Stirling Road - Closure
-
2nd of May 2024, 8:00pm3rd of May 2024, 6:00amA9 Sth of Broxden Rbt - N/B Lane 2 closure
-
2nd of May 2024, 8:00pm3rd of May 2024, 6:00amA9 Sth of Broxden Rbt - S/B Lane 2 closure
-
2nd of May 2024, 8:00pm3rd of May 2024, 6:00amA9 Nth of Balhaldie Services, Dunblane - N/B Lane 2 closure
-
2nd of May 2024, 8:00pm3rd of May 2024, 6:00amA9 Nth of Balhaldie Services, Dunblane - S/B Lane 2 closure
-
2nd of May 2024, 8:00pm3rd of May 2024, 6:00amM8 - EB - Jc4 4a - 4 - Hard shoulder & Lane closue
-
2nd of May 2024, 8:00pm8th of May 2024, 6:00amM90 - NB - Kirkliston to Queensferry Jct
-
2nd of May 2024, 8:00pm3rd of May 2024, 4:00amA702 E/B Lothianburn Roundabout. Lane Closure
-
2nd of May 2024, 8:00pm3rd of May 2024, 6:00amA76 NB at Enterkinfoot - TTLS
-
2nd of May 2024, 8:00pm6th of May 2024, 6:00amM74 Burnhead Road/B7019 OB - TTLs
-
2nd of May 2024, 8:00pm3rd of May 2024, 6:00amM73 Northbound Junction 2A to Junction 3 - Nearside lane closure
-
2nd of May 2024, 8:00pm3rd of May 2024, 6:00amM8 Eastbound Junction 7 Eurocentral off-slip - Total closure
-
2nd of May 2024, 8:00pm3rd of May 2024, 6:00amA78 NB Meadowhead Rbt to Eglinton IC - Road Closure
-
2nd of May 2024, 8:00pm3rd of May 2024, 6:00amM8 Westbound Junction 7A Eurocentral to Shawhead Link Road - Total closure
-
2nd of May 2024, 8:00pm3rd of May 2024, 6:00amA78 NB Newhouse offslip - Closure
-
2nd of May 2024, 8:00pm3rd of May 2024, 6:00amA78 NB Newhouse IC onslip - Closure
-
2nd of May 2024, 8:00pm3rd of May 2024, 6:00amA78 NB Warrix IC off slip - Closure
-
2nd of May 2024, 8:00pm3rd of May 2024, 6:00amA78 NB Warrix IC on slip - Closure
-
2nd of May 2024, 8:00pm3rd of May 2024, 6:00amA78 SB Meadowhead Rbt to Monktonhead Rbt- Closure
-
2nd of May 2024, 8:00pm3rd of May 2024, 6:00amA78 SB Auchengate Onslip - Slip Closure
-
2nd of May 2024, 8:00pm3rd of May 2024, 6:00amA78 SB Loans off slip - Slip Closure
-
2nd of May 2024, 8:00pm3rd of May 2024, 6:00amA78 SB Loans on slip - Slip Closure
-
2nd of May 2024, 8:00pm3rd of May 2024, 6:00amM73 Northbound junction 2A on-slip - Total closure
-
2nd of May 2024, 9:00pm2nd of May 2024, 11:59pmA720 - EB - Straiton off lsip - Closure
-
3rd of May 2024, 6:00am5th of May 2024, 8:00pmA82 Fort William to Spean Bridge NB - TTL
-
3rd of May 2024, 6:00am5th of May 2024, 8:00pmA82 Fort William to Spean Bridge SB - TTL
-
3rd of May 2024, 6:00am5th of May 2024, 8:00pmA86 Spean Bridge EB - TTL
-
3rd of May 2024, 6:00am5th of May 2024, 8:00pmA86 Spean Bridge WB - TTL
-
3rd of May 2024, 6:00am5th of May 2024, 8:00pmA830 Banavie Fort William - Signage
-
3rd of May 2024, 8:00am3rd of May 2024, 12:00pmA82 Aldochlay North of Arden - Vergeworks
-
3rd of May 2024, 9:00am3rd of May 2024, 1:00pmA835 West of Tore WB - TTL
-
3rd of May 2024, 9:00am3rd of May 2024, 1:00pmA835 West of Tore EB - TTL
-
3rd of May 2024, 9:00am3rd of May 2024, 4:00pmA75 Glen Luce bypass WB TTL's
-
3rd of May 2024, 9:00am3rd of May 2024, 4:00pmA75 Glen Luce bypass EB TTL's
-
3rd of May 2024, 9:30am3rd of May 2024, 3:30pmA75 at Halfway house WB- TTL
-
3rd of May 2024, 9:30am3rd of May 2024, 3:30pmA75 at Halfway house EB- TTL
-
3rd of May 2024, 9:30am3rd of May 2024, 3:30pmM90 Sth of Craigend (J10) - S/B Lane 1 closure
-
3rd of May 2024, 9:30am3rd of May 2024, 3:30pmA9 Sth of Lamberkin Farm, Perth - S/B Lane 1 closure
-
3rd of May 2024, 9:30am3rd of May 2024, 3:30pmA76 after Enterkinfoot Carronbridge NB -TTLS
-
3rd of May 2024, 9:30am3rd of May 2024, 3:30pmA76 prior to Enterkinfoot Carronbridge SB -TTLS
-
3rd of May 2024, 9:30am3rd of May 2024, 3:30pmA77 Kirkoswald Road Maybole SB - Convoy
-
3rd of May 2024, 9:30am3rd of May 2024, 3:30pmA77 Kirkoswald Road Maybole NB - Convoy
-
3rd of May 2024, 9:30am3rd of May 2024, 3:30pmA78 WB Inverkip Rd TTL
-
3rd of May 2024, 9:30am3rd of May 2024, 3:30pmA78 EB Inverkip Rd TTL
-
3rd of May 2024, 9:30am3rd of May 2024, 3:30pmA78 EB Inverkip Rd TTL
-
3rd of May 2024, 9:30am3rd of May 2024, 3:30pmA78 WB Inverkip Rd TTL
-
3rd of May 2024, 9:30am3rd of May 2024, 3:30pmA85 East High St Crieff EB - TTL
-
3rd of May 2024, 9:30am3rd of May 2024, 3:30pmA85 East High St Crieff WB - TTL
-
3rd of May 2024, 9:30am3rd of May 2024, 3:30pmM8 Westbound Junction 6A Chapelhall on-slip - Total closure
-
3rd of May 2024, 9:30am3rd of May 2024, 4:00pmA84 Runacraig South of Strathyre - Stop/Go Works
-
3rd of May 2024, 9:30am3rd of May 2024, 4:00pmA84 Runacraig South of Strathyre - Stop/Go Works
-
3rd of May 2024, 9:30am3rd of May 2024, 3:30pmM8 Westbound Junction 9 Easterhouse on-slip - Total closure
-
3rd of May 2024, 10:00am3rd of May 2024, 2:00pmA82 Stuckgowan South of Tarbet - Vergeworks
-
3rd of May 2024, 12:00pm3rd of May 2024, 4:00pmA82 Blairannaich North of Tarbet - Stop/Go Works
-
3rd of May 2024, 7:00pm4th of May 2024, 3:00amA9 Blair Atholl SB - Lane Closure
-
3rd of May 2024, 7:00pm4th of May 2024, 6:00amM876 - WB - Jct 1 - Hard shoulder closure
-
3rd of May 2024, 7:30pm4th of May 2024, 6:30amA90 East Dock St, Dundee- Lane Closure S/B
-
3rd of May 2024, 7:30pm4th of May 2024, 6:30amA90 Kingsway, Dundee- Lane Closure S/B
-
3rd of May 2024, 7:30pm4th of May 2024, 6:00amM9 - SB - Jct 2 to 1 - Lane Closure
-
3rd of May 2024, 8:00pm4th of May 2024, 6:00amM8 WB Jct 11 off slip - Route Part of Diversion
-
3rd of May 2024, 8:00pm4th of May 2024, 6:00amM8 EB Jct 11 onslip - Route Part of Diversion
-
3rd of May 2024, 8:00pm4th of May 2024, 6:00amM8 Westbound Chapelhall to Eurocentral on-slip - Nearside lane closure
-
3rd of May 2024, 8:00pm4th of May 2024, 6:00amM8 Westbound Eurocentral on-slip - Total closure
-
3rd of May 2024, 8:00pm4th of May 2024, 6:00amA77 Girvan Road @ Burnside Farm SB- TTL
-
3rd of May 2024, 8:00pm4th of May 2024, 6:00amA77 Girvan Road @ Burnside Farm NB- TTL
-
3rd of May 2024, 8:00pm4th of May 2024, 6:00amA77 Ardwell Girvan SB - TTL
-
3rd of May 2024, 8:00pm4th of May 2024, 6:00amA77 Ardwell Girvan NB - TTL
-
3rd of May 2024, 8:00pm4th of May 2024, 6:00amM8 EB Jct 20 West Street onslip - Closure
-
3rd of May 2024, 8:00pm4th of May 2024, 6:00amM8 - EB - Jct 4A to 4 - Lane closure
-
3rd of May 2024, 8:00pm4th of May 2024, 6:00amM8 - WB - Jct 4 to 4A - Lane closure
-
3rd of May 2024, 8:00pm4th of May 2024, 6:00amM8 - EB - Harthill - Lane closure
-
3rd of May 2024, 8:00pm4th of May 2024, 6:00amM8 - WB - Harthill - Lane closure
-
3rd of May 2024, 8:00pm4th of May 2024, 6:00amM8 Westbound Junction 10 off-slip - total closure
-
3rd of May 2024, 8:00pm4th of May 2024, 6:00amA82 NB Barloan to Stoneymollan Rbt - Total Closure
-
3rd of May 2024, 8:00pm4th of May 2024, 6:00amA82 NB offslip to Renton Rd - Total Closure
-
3rd of May 2024, 8:00pm4th of May 2024, 6:00amA82 S/B Stoneymollan to Barloan – Total Closure
-
3rd of May 2024, 8:00pm4th of May 2024, 6:00amA82 S/B Renton On Slip - Total Closure
-
3rd of May 2024, 8:00pm4th of May 2024, 6:00amA82 S/B Renton Off Slip - Total Closure
-
3rd of May 2024, 8:30pm29th of May 2024, 6:00amM8 - WB- Jct 3 to 3A - Closure
-
4th of May 2024, 6:00am5th of May 2024, 8:00pmA8 Westbound Swinton Roundabout - Inner ring closure
-
4th of May 2024, 6:00am5th of May 2024, 6:00pmA8 Westbound Bargeddie Roundabout - Inner ring closure
-
4th of May 2024, 6:00am5th of May 2024, 6:00pmA8 Eastbound Eurocentral North Rbt - Inner ring closure
-
4th of May 2024, 6:00am5th of May 2024, 6:00pmA8 Eastbound Chapelhall North Rbt - Inner ring closure
-
4th of May 2024, 6:00am5th of May 2024, 6:00pmA8 Westbound Chapelhall South Rbt - Inner ring closure
-
4th of May 2024, 6:00am5th of May 2024, 6:00pmA8 Westbound Eurocentral South Rbt - Inner ring closure
-
4th of May 2024, 7:00am4th of May 2024, 11:59pmM74 Jct 6 to 8 SB - Event Signage
-
4th of May 2024, 7:00am4th of May 2024, 11:59pmM74 Jct 6 to 8 NB - Event Signage
-
4th of May 2024, 8:00am5th of May 2024, 5:00pmA701 Kirkland to Greystonerigg NB - Road closure
-
4th of May 2024, 8:00am5th of May 2024, 5:00pmA701 Kirkland to Greystonerigg SB road closure
-
4th of May 2024, 9:30am4th of May 2024, 3:30pmA76 NB at Ardoch - TTLS
-
4th of May 2024, 9:30am4th of May 2024, 3:30pmA76 SB at Ardoch - TTLS
-
5th of May 2024, 3:00pm5th of May 2024, 4:00pmA82 Fort William NB - Event
-
5th of May 2024, 8:00pm6th of May 2024, 6:00amM8 EB Betweem Jct 12 and Jct 11 - Lane closure
-
5th of May 2024, 8:00pm6th of May 2024, 6:00amM8 WB Betweem Jct 12 and Jct 11 - Lane closure
-
5th of May 2024, 8:00pm7th of May 2024, 6:00amCandermil Road OB - TTLS
-
6th of May 2024, 7:00am31st of May 2024, 7:00pmA83 Glen Kinglas to Cairndow - Vergeworks
-
6th of May 2024, 8:00am10th of May 2024, 5:00pmA8 WB Cartsdyke Rbt - Lane closure
-
6th of May 2024, 8:00am24th of May 2024, 6:00pmA87 Sconser EB - TTL
-
6th of May 2024, 8:00am24th of May 2024, 6:00pmA87 Sconser WB - TTL
-
6th of May 2024, 8:00am12th of May 2024, 5:00pmA90 Laurencekirk - N/B lane 1 closure
-
6th of May 2024, 8:00am10th of May 2024, 6:00pmA90 Hatton - N/B TTL's
-
6th of May 2024, 8:00am8th of May 2024, 6:00pmA90 Laurencekirk- Signage only
-
6th of May 2024, 8:00am3rd of June 2024, 6:00pmA828 Barcaldine Gardens - TTL
-
6th of May 2024, 8:00am10th of May 2024, 6:00pmA85 Ichrachan East of Taynuilt EB - TTL
-
6th of May 2024, 8:00am10th of May 2024, 6:00pmA85 Ichrachan East of Taynuilt WB - TTL
-
6th of May 2024, 9:30am8th of May 2024, 3:30pmA82 Kenneth St Inverness - Stop/Go Works
-
6th of May 2024, 9:30am8th of May 2024, 3:30pmA96 Cairnie WB - Temporary traffic signals
-
6th of May 2024, 7:00pm7th of May 2024, 6:00amA9 Tomatin NB - Lane Closure
-
6th of May 2024, 7:00pm7th of May 2024, 6:00amA9 Milton of Lays NB - Lane Closure
-
6th of May 2024, 7:00pm3rd of June 2024, 6:00amA75 Glen Luce Bypass WB Convoy
-
6th of May 2024, 7:00pm3rd of June 2024, 6:00amA75 Glen Luce Bypass EB Convoy
-
6th of May 2024, 7:30pm11th of May 2024, 6:00amA9 Ashfield to Auchterarder- MLC N/B
-
6th of May 2024, 7:30pm11th of May 2024, 6:00amA9 Auchterarder to Ashfield - MLC S/B
-
6th of May 2024, 7:30pm9th of May 2024, 6:30amA90 Peterhead - TTL's
-
6th of May 2024, 7:30pm11th of May 2024, 6:30amA90 Gateside, Forfar- Lane Closure N/B
-
6th of May 2024, 7:30pm11th of May 2024, 6:30amA90 Gateside, Forfar- Lane Closure S/B
-
6th of May 2024, 7:30pm7th of May 2024, 6:00amA720 - Sheriffhall Roundabout - Lane closure
-
6th of May 2024, 8:00pm27th of May 2024, 6:00amA77 SB mainline at Bellfield I/C to Spitalhill - Total Closure
-
6th of May 2024, 8:00pm27th of May 2024, 6:00amA77 SB on on slip (Bellfield I/C) - Total Closure
-
6th of May 2024, 8:00pm11th of May 2024, 6:00amA985 - W/B - Longannet to Higgins Neuk- Closure
-
6th of May 2024, 8:00pm11th of May 2024, 6:00amA985 - E/B - Higgins Neuk to Longannet - Closure
-
6th of May 2024, 8:00pm11th of May 2024, 6:00amA876 - W/B - Kincardine - Closure
-
6th of May 2024, 8:00pm11th of May 2024, 6:00amA876 - E/B - Kincardine - Closure
-
6th of May 2024, 8:00pm1st of June 2024, 6:00amM73 Southbound to M74 Southbound - Total closure
-
6th of May 2024, 8:00pm1st of June 2024, 6:00amA721 on-slip to M74 Southbound - Total closure
-
6th of May 2024, 8:00pm1st of June 2024, 6:00amM74 Southbound Maryville - Nearside lane closure
-
6th of May 2024, 8:00pm8th of May 2024, 6:00amM74 Carlisle Road @ Wellburn Interchange TTLS
-
6th of May 2024, 10:00pm7th of May 2024, 4:00amA83 Glen Kinglas South of Rest and Be Thankful SB - Road Closure with Amnesties
-
6th of May 2024, 10:00pm7th of May 2024, 4:00amA83 Glen Kinglas South of Rest and Be Thankful NB - Road Closure with Amnesties
-
7th of May 2024, 5:00am17th of May 2024, 3:30pmA702 S/B Abington. Lane Closure.
-
7th of May 2024, 5:00am14th of May 2024, 5:00pmA77 Stranraer to Whitletts Rbt - Mobile Stop Go
-
7th of May 2024, 6:00am26th of May 2024, 8:00pmA77 SB mainline at Bellfield I/C to Spitalhill - Lane Closure
-
7th of May 2024, 6:00am31st of May 2024, 7:00pmA75 Glen Luce Bypass EB TTL's
-
7th of May 2024, 6:00am31st of May 2024, 7:00pmA75 Glen Luce Bypass WB TTL's
-
7th of May 2024, 6:00am31st of May 2024, 7:00pmA75 Glen Luce Bypass EB lane closure
-
7th of May 2024, 7:00am13th of May 2024, 7:00pmA82 North of Tyndrum - Convoy
-
7th of May 2024, 8:00am17th of May 2024, 5:00pmA96 Newton of Forgie WB - Temporary traffic signals
-
7th of May 2024, 8:00am9th of May 2024, 6:00pmA90 Longhaven- Signage only N/B
-
7th of May 2024, 8:00am9th of November 2024, 11:59pmA78 Shore Road, Skelmorlie SB - TTLs
-
7th of May 2024, 8:00am9th of November 2024, 11:59pmA78 Shore Road, Skelmorlie NB- TTLs
-
7th of May 2024, 8:00am20th of May 2024, 6:00pmA90 Peterhead NB - Diversion signage for local road closure
-
7th of May 2024, 8:00am8th of May 2024, 6:00pmA82 Onich NB - TTL
-
7th of May 2024, 8:00am8th of May 2024, 6:00pmA82 Onich SB - TTL
-
7th of May 2024, 8:00am9th of May 2024, 6:00pmA82 Highbridge South of Spean Bridge NB - TTL
-
7th of May 2024, 8:00am9th of May 2024, 6:00pmA82 Highbridge South of Spean Bridge SB - TTL
-
7th of May 2024, 9:00am7th of May 2024, 4:00pmA83 East of Strone North of Inveraray - Stop/Go Works
-
7th of May 2024, 9:00am8th of May 2024, 7:00pmA83 Aray Bridge Inveraray - Stop/Go Works
-
7th of May 2024, 9:00am10th of May 2024, 6:00pmA87 B885 Jnct Portree WB - TTL
-
7th of May 2024, 9:00am10th of May 2024, 6:00pmA87 B885 Jnct Portree EB - TTL
-
7th of May 2024, 9:00am8th of May 2024, 7:00pmA83 Port Ann - Stop/Go Works
-
7th of May 2024, 9:00am8th of May 2024, 4:00pmA85 St Fillans WB - TTL
-
7th of May 2024, 9:00am8th of May 2024, 4:00pmA85 St Fillans EB - TTL
-
7th of May 2024, 9:30am7th of May 2024, 3:30pmM73 Southbound Junction 2A Gartcosh on-slip - Total closure
-
7th of May 2024, 9:30am7th of May 2024, 3:30pmM73 Northbound Junction 2A Gartcosh off-slip - Total Closure
-
7th of May 2024, 9:30am7th of May 2024, 3:30pmA8 East Hamilton St WB - Lane Closure
-
7th of May 2024, 9:30am7th of May 2024, 3:30pmDouglas Rae Rd onto A8 E Hamilton St WB - Lane Closure
-
7th of May 2024, 9:30am8th of May 2024, 3:30pmA90 Inverugie Bridge NB - Temporary traffic signals
-
7th of May 2024, 9:30am24th of May 2024, 3:30pmA83 Bellochantuy Glenbarr NB - TTL
-
7th of May 2024, 9:30am24th of May 2024, 3:30pmA83 Bellochantuy Glenbarr SB - TTL
-
7th of May 2024, 9:30am7th of May 2024, 3:30pmA77 Henrietta St SB- Stop & Go
-
7th of May 2024, 9:30am7th of May 2024, 3:30pmA77 Henrietta St NB- Stop & Go
-
7th of May 2024, 9:30am7th of May 2024, 3:30pmM80 Jct 2 to jct 1 south- Mobile hard shoulder closure GG115
-
7th of May 2024, 9:30am7th of May 2024, 3:30pmM80 Jct 2 to jct 1 north- Mobile hard shoulder closure GG115
-
7th of May 2024, 3:00pm9th of May 2024, 11:59pmA82 Torvean Inverness - Vergeworks
-
7th of May 2024, 6:00pm21st of May 2024, 2:00amA85 Comrie - Convoy Works
-
7th of May 2024, 7:00pm8th of May 2024, 6:00amA830 Druimindarroch East of Arisaig EB - TTL
-
7th of May 2024, 7:00pm8th of May 2024, 6:00amA830 Druimindarroch East of Arisaig WB - TTL
-
7th of May 2024, 7:00pm8th of May 2024, 6:00amA75 from C48 Eastriggs Junction W/B - TTLS
-
7th of May 2024, 7:00pm8th of May 2024, 6:00amA75 from C48 Eastriggs Junction E/B - TTLS
-
7th of May 2024, 7:00pm10th of May 2024, 6:00amA87 Broadford NB - Convoy Works
-
7th of May 2024, 7:00pm10th of May 2024, 6:00amA87 Broadford NB - Convoy Works
-
7th of May 2024, 7:30pm31st of May 2024, 6:30amA96 Lhanbryde - WB TTL's
-
7th of May 2024, 7:30pm10th of May 2024, 6:00amA720 - WB - Sherrifhall Rbt to Straiton WB
-
7th of May 2024, 7:30pm17th of May 2024, 6:00amA1 - NB - A1 North of Tyne Bridge - Closure
-
7th of May 2024, 7:30pm2nd of August 2024, 6:00amM8 E/B Jct 2. Lane Closure.
-
7th of May 2024, 7:30pm2nd of August 2024, 6:00amM8 W/B Jct 2. Lane Closure.
-
7th of May 2024, 8:00pm8th of May 2024, 6:00amA82 S/B Renton On Slip - Total Closure
-
7th of May 2024, 8:00pm8th of May 2024, 6:00amA82 S/B Renton Off Slip - Total Closure
-
7th of May 2024, 8:00pm8th of May 2024, 6:00amA8(M) Baillieston Roundabout - Progressive inner & outer lane closures
-
7th of May 2024, 8:00pm8th of May 2024, 6:00amM77 SB Jct 4 off slip - Lane Closure
-
7th of May 2024, 8:00pm8th of May 2024, 6:00amM74 Northbound Between Junction 4 to Junction 5 - Offside lane closure
-
7th of May 2024, 8:00pm8th of May 2024, 6:00amM74 Southbound between Junction 4 to Junction 5 - Offside lane closure
-
7th of May 2024, 8:00pm8th of May 2024, 6:00amM74 Jct 2A to Jct 1A NB - Lane Closure
-
7th of May 2024, 8:00pm9th of May 2024, 6:00amA723 Motherwell Road WB - Lane closure
-
7th of May 2024, 8:00pm17th of May 2024, 6:00amA723 Motherwell Road EB - Total Closure
-
7th of May 2024, 8:00pm24th of May 2024, 6:00amM74 Jct 6 NB off slip to Motherwell - Total Closure
-
7th of May 2024, 8:00pm24th of May 2024, 6:00amM74 Jct 6 NB off slip to Hamilton - Total Closure
-
7th of May 2024, 8:00pm3rd of June 2024, 6:00amA77 SB onslip from B7038 - Total Closure
-
7th of May 2024, 8:00pm16th of May 2024, 6:00amA78 Inverkip Road @ Gleninber Rd - Dual - Total Closure
-
7th of May 2024, 8:00pm16th of May 2024, 6:00amA78 Inverkip Road @ Gleninver Rd - Dual NB - Total Closure
-
7th of May 2024, 8:00pm9th of May 2024, 6:00amM74 Bog Road/Tower Road OB EB - TTLs
-
7th of May 2024, 8:00pm8th of May 2024, 6:00amA82 NB Barloan to Stoneymollen - Total Closure
-
7th of May 2024, 8:00pm8th of May 2024, 6:00amA725 Northbound Between Bellziehill off-slip & on-slip - Nearside lane closure
-
7th of May 2024, 8:00pm8th of May 2024, 6:00amA82 NB offslip to Renton Rd - Total Closure
-
7th of May 2024, 8:00pm8th of May 2024, 6:00amA8 Westbound Swinton Rbt to Baillieston Lights - Progressive nearside & offside lane closures
-
7th of May 2024, 8:00pm8th of May 2024, 6:00amA82 S/B Stoneymollan to Barloan – Total Closure
-
7th of May 2024, 8:00pm8th of May 2024, 6:00amA8 Eastbound Baillieston Lights to Swinton Rbt - Progressive nearside & offside lane closures
-
8th of May 2024, 6:00am9th of May 2024, 1:00pmA78 Inverkip Road Auchmead Rd - Cumberland Rd NB - Daytime TTL's
-
8th of May 2024, 6:01am10th of May 2024, 1:00pmA78 Inverkip Road @ Allleymill Gardens - Auchmead Rd NB - Daytime TTL's
-
8th of May 2024, 8:00am8th of May 2024, 6:00pmA84 Drumviach North of Buchany SB - TTL
-
8th of May 2024, 8:00am8th of May 2024, 6:00pmA84 Drumviach North of Buchany NB - TTL
-
8th of May 2024, 8:00am10th of May 2024, 6:00pmA99 Thurmster NB - TTL
-
8th of May 2024, 8:00am10th of May 2024, 6:00pmA99 Thurmster SB - TTL
-
8th of May 2024, 8:00am8th of May 2024, 4:00pmA75 EB at A726 Jct - Advanced Signage
-
8th of May 2024, 9:30am10th of May 2024, 3:30pmA738 Byres Road Kilwinning EB - TTLS
-
8th of May 2024, 9:30am10th of May 2024, 3:30pmA738 Byres Road Kilwinning WB - TTLS
-
8th of May 2024, 9:30am8th of May 2024, 3:30pmM73 Southbound Junction 2A Gartcosh off-slip - Total closure
-
8th of May 2024, 9:30am8th of May 2024, 3:30pmM73 Northbound Junction 2A on-slip - Total closure
-
8th of May 2024, 9:30am11th of May 2024, 7:00pmA68 N/B Leaderfoot. Stop/Go Boards.
-
8th of May 2024, 9:30am11th of May 2024, 7:00pmA68 S/B Leaderfoot. Stop/Go Boards.
-
8th of May 2024, 9:30am22nd of May 2024, 3:00pmA85 A822 Jnct Crieff to Abercairney West of Crieff - Vergeworks
-
8th of May 2024, 9:30am8th of May 2024, 3:30pmM77 jct 3 to jct 4 south- mobile hard shoulder closure GG115
-
8th of May 2024, 9:30am8th of May 2024, 3:30pmM77 jct 3 to jct 4 north- mobile hard shoulder closure GG115
-
8th of May 2024, 9:30am9th of May 2024, 3:30pmM8 WB Jct 25 HS Closure
-
8th of May 2024, 9:30am8th of May 2024, 3:30pmA82 Heron Bay North of Corran NB - TTL
-
8th of May 2024, 9:30am8th of May 2024, 3:30pmA82 Heron Bay North of Corran SB - TTL
-
8th of May 2024, 7:00pm9th of May 2024, 6:00amA9 Aviemore NB - TTL
-
8th of May 2024, 7:00pm9th of May 2024, 6:00amA9 Aviemore SB - TTL
-
8th of May 2024, 7:00pm9th of May 2024, 5:00amA75 A709 Brownrigg Rbt RBT WB TTLS
-
8th of May 2024, 7:00pm9th of May 2024, 5:00amA75 A709 Brownrigg Rbt RBT EB TTLS
-
8th of May 2024, 7:00pm9th of May 2024, 5:00amA75 A709 Brownrigg RBT Approach SB - TTLS
-
8th of May 2024, 7:00pm9th of May 2024, 5:00amA75 A709 Brownrigg RBT Approach NB - TTLS
-
8th of May 2024, 7:00pm24th of May 2024, 5:00amA82 Beinn Odhar North of Tyndrum NB - Road Closure
-
8th of May 2024, 7:00pm24th of May 2024, 5:00amA82 Beinn Odhar North of Tyndrum SB - Road Closure
-
8th of May 2024, 7:30pm9th of May 2024, 6:00amA1 - NB - Oaktree Off-slip - Closure
-
8th of May 2024, 7:30pm9th of May 2024, 6:00amA1 - NB - Oaktree On-slip - Closure
-
8th of May 2024, 7:30pm9th of May 2024, 12:30amA76 Glasgow Road Lochside Rbt NB - TTLS
-
8th of May 2024, 7:30pm9th of May 2024, 12:30amA76 Glasgow Road Lochside Rbt SB - TTLS
-
8th of May 2024, 7:30pm9th of May 2024, 12:30amA76 Lochside Rbt Lochside Road approach EB - TTLS
-
8th of May 2024, 7:30pm9th of May 2024, 12:30amA76 Lochside Rbt Criffel Road approach - TTLS
-
8th of May 2024, 8:00pm9th of May 2024, 6:00amM8 WB Jct 27 to 29 lane 1 Closure
-
8th of May 2024, 8:00pm9th of May 2024, 6:00amM8 WB Jct 27 off slip - Slip Closure
-
8th of May 2024, 8:00pm9th of May 2024, 6:00amA725 Southbound Orbiston on-slip - Total closure
-
8th of May 2024, 8:00pm9th of May 2024, 6:00amM8 WB Jct 27 on slip - Slip Closure
-
8th of May 2024, 8:00pm9th of May 2024, 6:00amA725 Southbound Orbiston to Raith - Progressive nearside & offside lane closures
-
8th of May 2024, 8:00pm9th of May 2024, 6:00amM8 WB Jct 28 of slip - Slip Closure
-
8th of May 2024, 8:00pm9th of May 2024, 6:00amA725 NB Bellziehill off-slip - Nearside lane closure
-
8th of May 2024, 8:00pm9th of May 2024, 6:00amM8 WB Jct 28a to A737 Linwood onslip - Closure
-
8th of May 2024, 8:00pm9th of May 2024, 6:00amA8 Eastbound Swinton Rbt to Bargeddie Rbt - Progressive nearside & offside lane closures
-
8th of May 2024, 8:00pm9th of May 2024, 6:00amA737 SB St James IC to Linclive IC - Closure
-
8th of May 2024, 8:00pm9th of May 2024, 6:00amA8 Westbound Bargeddie Rbt to Swinton Rbt - Progressive nearside & offside lane closures
-
8th of May 2024, 8:00pm9th of May 2024, 6:00amA737 SB Linclive IC to Barrochan IC offslip Closure
-
8th of May 2024, 8:00pm9th of May 2024, 6:00amA737 NB - Linwood to M8 Jct 28a on slip - Slip Closure
-
8th of May 2024, 8:00pm9th of May 2024, 6:00amA737 NB - Linwood on slip - Slip closure
-
8th of May 2024, 8:00pm9th of May 2024, 6:00amA737 NB St James off slip - Slip closure
-
8th of May 2024, 8:00pm9th of May 2024, 6:00amM8 EB J28a to J27 - L1 closure
-
8th of May 2024, 8:00pm9th of May 2024, 6:00amM8 EB J28 on slip - Slip closure
-
8th of May 2024, 8:00pm9th of May 2024, 6:00amM8 EB J27 off slip- slip closure
-
8th of May 2024, 8:00pm9th of May 2024, 6:00amA725 East Killbride Expressway @ Whirlies Rbt Total closure
-
8th of May 2024, 8:00pm9th of May 2024, 6:00amM77 Jct 3 offslip SB - Total Closure
-
8th of May 2024, 8:00pm14th of May 2024, 6:00amM90 - NB - Jct 1B on slip - Closure
-
8th of May 2024, 8:00pm14th of May 2024, 6:00amM90 - NB - Jct 1B on slip - Closure
-
8th of May 2024, 8:00pm10th of May 2024, 6:30amM8 WB Jct 10 to Jct 28 - Mobile Lane Closure
-
8th of May 2024, 8:00pm10th of May 2024, 6:30amM8 EB Jct 28 to Jct 10 - Mobile Lane Closure
-
8th of May 2024, 8:00pm10th of May 2024, 6:30amM74 NB Jct 3a to M8 jct 20 - Mobile Lane Closure
-
8th of May 2024, 8:00pm10th of May 2024, 6:30amM74 SB Jct 1 to Jct 3a - Mobile Lane Closures
-
8th of May 2024, 8:00pm10th of May 2024, 6:00amM74 Eastwood Road OB EB - TTLs
-
8th of May 2024, 8:30pm9th of May 2024, 5:00amA75 Drumore Rbt Lochfoot E/B - TTLS
-
8th of May 2024, 8:30pm9th of May 2024, 5:00amA75 Drummore Rbt Lochfoot - TTLS
-
8th of May 2024, 8:30pm9th of May 2024, 5:00amA75 Drummoe Rbt Lochfoot Quarry exit - TTLS
-
9th of May 2024, 8:00am9th of May 2024, 6:00pmA85 St Fillans EB - TTL
-
9th of May 2024, 8:00am9th of May 2024, 6:00pmA85 St Fillans WB - TTL
-
9th of May 2024, 8:00am11th of May 2024, 6:00pmA828 Kentallen North of Duror NB - TTL
-
9th of May 2024, 8:00am11th of May 2024, 6:00pmA828 Kentallen North of Duror SB - TTL
-
9th of May 2024, 8:00am10th of May 2024, 4:00pmA830 Glenfinnan EB - TTL
-
9th of May 2024, 8:00am10th of May 2024, 4:00pmA830 Glenfinnan WB - TTL
-
9th of May 2024, 9:00am9th of May 2024, 4:00pmA83 Ballywilline Campbeltown - Stop/Go Works
-
9th of May 2024, 9:00am10th of May 2024, 3:00pmA96 Inverurie- Diversion signage S/B
-
9th of May 2024, 9:30am10th of May 2024, 3:30pmA96 Pitmachie - Diversion Signage
-
9th of May 2024, 9:30am9th of May 2024, 3:30pmA9 Sordale North of Georgemass SB - TTL
-
9th of May 2024, 9:30am9th of May 2024, 3:30pmA9 Sordale North of Georgemass NB - TTL
-
9th of May 2024, 9:30am9th of May 2024, 3:30pmM73 Northbound Junction 2 Baillieston on-slip - Total Closure
-
9th of May 2024, 9:30am9th of May 2024, 3:30pmM73 Southbound Junction 2 Baillieston on-slip - Total closure
-
9th of May 2024, 9:30am9th of May 2024, 3:30pmA9 Main Street Golspie NB - TTL
-
9th of May 2024, 9:30am9th of May 2024, 3:30pmA9 Main Street Golspie SB - TTL
-
9th of May 2024, 9:30am9th of May 2024, 3:30pmA737 WB The Den Dalry - Progressive TTLS
-
9th of May 2024, 9:30am9th of May 2024, 3:30pmA737 EB The Den Dalry TTLS
-
9th of May 2024, 9:30am20th of May 2024, 3:30pmM74 jct 1 to jct 3a south- mobile hard shoulder GG115
-
9th of May 2024, 9:30am20th of May 2024, 3:30pmM74 jct 1 to jct 3a north- mobile hard shoulder GG115
-
9th of May 2024, 9:30am20th of May 2024, 3:30pmM74 jct 6 to jct 12 south- Mobile hard shoulder closure GG115
-
9th of May 2024, 9:30am20th of May 2024, 3:30pmM74 jct 6 to jct 12 north- Mobile hard shoulder closure GG115
-
9th of May 2024, 7:00pm10th of May 2024, 6:00amA9 After Raigmore Interchange NB - Lane Closure
-
9th of May 2024, 7:00pm10th of May 2024, 6:00amA96 Regent St, Keith - E/B TTL's
-
9th of May 2024, 7:00pm11th of May 2024, 5:00amA75 Ramhill Bridge Castle Douglas WB TTLS
-
9th of May 2024, 7:00pm11th of May 2024, 5:00amA75 Ramhill Bridge Castle Douglas EB TTLS
-
9th of May 2024, 7:30pm10th of May 2024, 6:00amA1Abbotsview N/B Off-slip Closure.
-
9th of May 2024, 8:00pm10th of May 2024, 6:00amM8 Westbound Boundary to Junction 6 Newhouse - Nearside lane closure
-
9th of May 2024, 8:00pm10th of May 2024, 6:00amM8 Eastbound to M73 Southbound High loop - total closure
-
9th of May 2024, 8:00pm10th of May 2024, 6:00amM73 Northbound Junction 2 Baillieston off-slip - Total closure
-
9th of May 2024, 8:00pm10th of May 2024, 6:00amM8 EB J29 off slip to St James IC - Slip closure
-
9th of May 2024, 8:00pm10th of May 2024, 6:00amM8 EB J29 onslip St James IC - Slip closure
-
9th of May 2024, 8:00pm10th of May 2024, 6:00amA737 NB Barrochan IC to Linwood IC - Lane Closure
-
9th of May 2024, 8:00pm10th of May 2024, 6:00amA737 NB Kilbarchan IC on slip - Slip Closure
-
9th of May 2024, 8:00pm10th of May 2024, 6:00amA737 NB Barrochan IC On slip Johnstone - Slip Closure
-
9th of May 2024, 8:00pm10th of May 2024, 6:00amA737 NB Barrochan IC Offslip Johnstone -Slip Closure
-
9th of May 2024, 8:00pm10th of May 2024, 6:00amA737 NB Linclive IC Offslip Linwood - Closure
-
9th of May 2024, 8:00pm10th of May 2024, 6:00amA737 SB Linclive Interchange to Kilbarchan Rd- Lane 1 Closure
-
9th of May 2024, 8:00pm10th of May 2024, 6:00amA737 SB Linclive IC onslip linwood - Slip Closure
-
9th of May 2024, 8:00pm10th of May 2024, 6:00amA737 SB Barrochan IC onslip Johnstone - Slip Closure
-
9th of May 2024, 8:00pm10th of May 2024, 6:00amA737 SB Barrochan IC offslip Johnstone - Slip Closure
-
9th of May 2024, 8:00pm10th of May 2024, 6:00amA737 SB Kilbarchan IC off slip - Slip Closure
-
9th of May 2024, 8:00pm10th of May 2024, 6:00amA725 East Kilbride Expressway @ Whistleberry offslip EB - Lane Closure
-
9th of May 2024, 8:00pm10th of May 2024, 6:00amA725 East Kilbride Expressway prior to Glasgow Rd onslip WB - Lane Closure
-
9th of May 2024, 8:00pm10th of May 2024, 6:00amA725 Glasgow Rd onslip EB - Total Closure
-
9th of May 2024, 8:00pm10th of May 2024, 6:00amA8 WB Main St between Cartsdyke Rbt and Cartsburn Rbt - Lane Closure
-
9th of May 2024, 8:00pm10th of May 2024, 6:00amA8 EB Main St between Cartsdyke Rbt and Cartsburn Rbt - Lane Closure
-
9th of May 2024, 8:00pm11th of May 2024, 6:30amA78 NB Dutchouse to Montfode - Mobile Lane Closure
-
9th of May 2024, 8:00pm11th of May 2024, 6:30amA78 SB Montfode to Dutchouse - Mobile lane closure
-
9th of May 2024, 8:00pm11th of May 2024, 6:30amA77 NB Whitletts to Meiklewood - Mobile Lane Closure
-
9th of May 2024, 8:00pm11th of May 2024, 6:30amA77 SB Meiklewood to Whitletts - Mobile Lane Closure
-
9th of May 2024, 8:00pm13th of May 2024, 6:00amM74 Vere Road OB - TTLs
-
9th of May 2024, 8:00pm10th of May 2024, 6:00amM8 WB Jct 21 - 23 Secondary CW - Total Closure
-
9th of May 2024, 8:00pm10th of May 2024, 6:00amM8 WB Jct 21 Secondary CW on slip from Carnoustie St - Slip Closure
-
9th of May 2024, 8:00pm10th of May 2024, 6:00amM8 WB Jct 22 Secondary CW on slip from EB Jct 21 - Slip closure
-
9th of May 2024, 8:00pm10th of May 2024, 6:00amM8 WB Jct 22 Secondary CW off slip to M77 SB - Slip closure
-
9th of May 2024, 8:00pm10th of May 2024, 6:00amM8 WB Jct 23 off slip to Dumbreck Road - Slip closure
-
10th of May 2024, 6:00am12th of May 2024, 8:30pmM8 - WB- Jct 3 to 3A - Lane closure
-
10th of May 2024, 9:00am10th of May 2024, 4:00pmA83 Drumore North of Campbeltown - Stop/Go Works
-
10th of May 2024, 9:30am10th of May 2024, 3:30pmM73 Southbound Junction 2 Baillieston off-slip - Total closure
-
10th of May 2024, 9:30am10th of May 2024, 3:30pmA76 Mauchline SB- TTL
-
10th of May 2024, 9:30am10th of May 2024, 3:30pmA76 Mauchline NB- TTL
-
10th of May 2024, 7:00pm11th of May 2024, 6:00amA87 Sconser East of Sligachan - Convoy Works
-
10th of May 2024, 7:30pm13th of May 2024, 7:29pmA92 Cowdenbeath to Lochgelly- Contraflow N/B
-
10th of May 2024, 7:30pm13th of May 2024, 7:29pmA92 Cowdenbeath to Lochgelly- Contraflow S/B
-
10th of May 2024, 7:30pm13th of May 2024, 6:30amA92 Lochgelly Off Slip- Closure N/B
-
10th of May 2024, 7:30pm13th of May 2024, 6:30amA92 Cowdenbeath on slip closure N/B
-
10th of May 2024, 7:30pm11th of May 2024, 6:00amA720- WB - Straiton- Lothianburn - Closure
-
10th of May 2024, 7:30pm11th of May 2024, 6:00amA720- WB - Straiton on slip- Lothianburn - Closure
-
10th of May 2024, 8:00pm11th of May 2024, 6:00amM74 Southbound to M73 Northbound Link road - Nearside lane becoming total closure
-
10th of May 2024, 8:00pm11th of May 2024, 6:00amM73 Daldowie on-slip to M73 Northbound - Total closure
-
10th of May 2024, 8:00pm11th of May 2024, 6:00amM74 Northbound to M73 Northbound link road - Nearside lane closure
-
10th of May 2024, 8:00pm11th of May 2024, 6:00amM73 Southbound to M74 Northbound link road - Total closure
-
10th of May 2024, 8:00pm11th of May 2024, 6:00amA8 WB - M8 J31 to Woodhall Rbt - Lane Closures
-
10th of May 2024, 8:00pm11th of May 2024, 6:00amM8 WB onslip from J31 - Lane Closure
-
10th of May 2024, 8:00pm11th of May 2024, 6:00amA8 WB Greenock Road Woodhall Rbt to Newark Rbt - Road Closure
-
10th of May 2024, 8:00pm11th of May 2024, 6:00amA8 WB, Parklea Rd on slip - Slip Closure
-
10th of May 2024, 8:00pm11th of May 2024, 6:00amA8 WB, Parklea Rd off slip - Slip Closure
-
10th of May 2024, 8:00pm11th of May 2024, 6:00amA8 B789 WB Langbank off slip -Slip Closure
-
10th of May 2024, 8:00pm11th of May 2024, 6:00amA8 WB Langbank on slip - Slip Closure
-
10th of May 2024, 8:00pm11th of May 2024, 6:00amA8 EB Greenock Road - Newark Rbt to Woodhall Rbt - Road closure
-
10th of May 2024, 8:00pm11th of May 2024, 6:00amA8 EB Greenock Road - Woodhall Rbt to West Ferry IC - Lane Closure
-
10th of May 2024, 8:00pm11th of May 2024, 6:00amM8 EB - JCT 31 off slip - lane closures
-
10th of May 2024, 8:00pm11th of May 2024, 6:00amA8 WB Greenock Rd Port Glasgow mobile lane closures GG116
-
10th of May 2024, 8:00pm11th of May 2024, 6:00amA8 EB Greenock Rd Port Glasgow mobile lane closures GG116
-
10th of May 2024, 8:00pm11th of May 2024, 6:00amM8 WB Jct 31 Westferry Offslip - Closure
-
10th of May 2024, 8:00pm11th of May 2024, 6:00amM8 EB Jct 31 Westferry on slip to M8 EB - Closure
-
10th of May 2024, 8:00pm11th of May 2024, 6:00amA737 EB Linclive Ic to Barrochan IC Linwood Total Closure
-
10th of May 2024, 8:00pm11th of May 2024, 6:00amM8 WB Jct 20 to Jct 23 - Total Closure
-
10th of May 2024, 8:00pm11th of May 2024, 6:00amM8 WB Jct 19 Newton St on slip - Total Closure
-
10th of May 2024, 8:00pm11th of May 2024, 6:00amM8 WB Jct 19 Waterloo St on slip - Total Closure
-
10th of May 2024, 8:00pm11th of May 2024, 6:00amM8 WB Jct 19 Stobbcross on slip - Total Closure
-
10th of May 2024, 8:00pm11th of May 2024, 6:00amM8 WB Jct 22 off slip to M77 - Total Closure
-
11th of May 2024, 6:01am12th of May 2024, 1:00pmA78 Inverkip Road Cumberland Rd Auchmead Rd SB - Daytime TTL's
-
11th of May 2024, 7:00am12th of May 2024, 7:00pmA85 Gilmerton to Methven - Diversion Signage
-
11th of May 2024, 7:00pm12th of May 2024, 3:30pmA96 Blackhall Roundabout, Inverurie - Lane Narrowing
-
11th of May 2024, 8:00pm12th of May 2024, 6:00amM8 J19 WB offslip to Anderston - Lane Closure
-
11th of May 2024, 8:00pm12th of May 2024, 6:00amM8 EB Jct 23 to 19 - Total Closure
-
11th of May 2024, 8:00pm12th of May 2024, 6:00amM8 EB on slip from M77 - Total Closure
-
12th of May 2024, 6:00am12th of May 2024, 6:00pmM8 Eastbound Junction 8 on-slip - Total closure
-
12th of May 2024, 6:00am12th of May 2024, 6:00pmM8 Westbound Junction 8 Baillieston off-slip - Total closure
-
12th of May 2024, 6:30am12th of May 2024, 2:00pmA8 Rue End St/Dalrymple St, from Dellingburn Street Jct to Bullring Rbt - Lane Closure
-
12th of May 2024, 6:30am12th of May 2024, 2:00pmA8 Rue End St/Dalrymple St, from Dellingburn Street Jct to Bullring Rbt - Lane Closure
-
12th of May 2024, 9:30am12th of May 2024, 6:00pmA725 WB Blantyre to East Kilbride - Route Part of Diversion
-
12th of May 2024, 9:30am12th of May 2024, 6:00pmA725 EB Blantyre to East Kilbride - Route Part of Diversion
-
12th of May 2024, 7:00pm13th of May 2024, 6:00amM8 - WB - JCT 1 to 2 - Lane closure
-
12th of May 2024, 7:00pm13th of May 2024, 6:00amM9 - SB - Jct 9 - 8 - Hard shoulder closure
-
12th of May 2024, 7:00pm17th of May 2024, 7:00amA9 Bogbain Burn Carrbridge - Convoy Works
-
12th of May 2024, 7:30pm24th of May 2024, 6:30amA96 Newtongarry, Huntly- Convoy N/B
-
12th of May 2024, 7:30pm24th of May 2024, 6:30amA96 Newtongarry, Huntly- Convoy S/B
-
12th of May 2024, 7:30pm13th of May 2024, 6:00amA720 - WB - Lothianburn to Dreghorn - Closure
-
12th of May 2024, 7:30pm13th of May 2024, 6:00amA720 - WB - Lothianburn onslip to Dreghorn off slip - Closure
-
12th of May 2024, 8:00pm28th of June 2024, 6:00amM8 J13 -J14 Westbound - lane closure
-
12th of May 2024, 8:00pm28th of June 2024, 6:00amM8 J14-J13 Eastbound - Lane closure
-
12th of May 2024, 8:00pm13th of May 2024, 6:00amM73 Southbound to M74 Southbound link road - Total closure
-
12th of May 2024, 8:00pm13th of May 2024, 6:00amA721 Southbound to M74 Southbound - total closure
-
12th of May 2024, 8:00pm17th of May 2024, 6:00amA835 Garve WB - Road Closure with Amnesties
-
12th of May 2024, 8:00pm17th of May 2024, 6:00amA835 Garve EB - Road Closure with Amnesties
-
12th of May 2024, 8:00pm14th of May 2024, 6:00amA737 EB Irvine Rd at Eglinton Interchange Rbt - TTLS
-
12th of May 2024, 8:00pm13th of May 2024, 6:00amM8 EB Jct 23 to M74 SB Jct 1 - Total Closure
-
12th of May 2024, 8:00pm13th of May 2024, 6:00amM8 EB Jct 24 on slip - Total Closure
-
12th of May 2024, 8:00pm13th of May 2024, 6:00amM8 EB Jct 23 on slip - Total Closure
-
12th of May 2024, 8:00pm13th of May 2024, 6:00amM8 EB Secondary CW link road from M77 - Total Closure
-
12th of May 2024, 8:00pm13th of May 2024, 6:00amM8 EB Jct 22 off slip - Total Closure
-
12th of May 2024, 8:00pm13th of May 2024, 6:00amM8 EB Jct 21 off slip - Total Closure
-
12th of May 2024, 9:00pm17th of May 2024, 1:00amA82 Tychat North of Drumnadrochit SB - TTL
-
12th of May 2024, 9:00pm17th of May 2024, 1:00amA82 Tychat North of Drumnadrochit NB - TTL
-
13th of May 2024, 7:00am24th of May 2024, 5:00pmA82 Abriachan North of Drumnadrochit SB - TTL
-
13th of May 2024, 7:00am24th of May 2024, 5:00pmA82 Abriachan North of Drumnadrochit NB - TTL
-
13th of May 2024, 7:00am19th of May 2024, 9:30pmA830 Glenfinnan - Stop/Go Works
-
13th of May 2024, 8:00am14th of May 2024, 5:00pmA85 Orchy Bridge Loch Awe EB - TTL
-
13th of May 2024, 8:00am14th of May 2024, 5:00pmA85 Orchy Bridge Loch Awe WB - TTL
-
13th of May 2024, 8:00am14th of May 2024, 6:00pmA90 Laurencekirk- Signage Only N/B
-
13th of May 2024, 8:00am24th of May 2024, 5:00pmA75 EB Between Stranraer and Castle Kennedy - TTLS
-
13th of May 2024, 8:00am24th of May 2024, 5:00pmA75 WB Between Stranraer and Castle Kennedy - TTLS
-
13th of May 2024, 9:00am13th of May 2024, 7:00pmA828 Beinn Sgluish South of Duror - Stop/Go Works
-
13th of May 2024, 9:30am13th of May 2024, 3:30pmA90 Peterhead Bypass - Diversion signage
-
13th of May 2024, 9:30am19th of May 2024, 4:00pmA78 SB Gallowgate Street to Irvine Rd Rbt - TTLS
-
13th of May 2024, 9:30am19th of May 2024, 4:00pmA78 NB Gallowgate Street to Irvine Rd Rbt - TTLS
-
13th of May 2024, 9:30am14th of May 2024, 3:30pmM90 Blairadam, Kelty- Lane Closure N/B
-
13th of May 2024, 9:30am14th of May 2024, 3:30pmM90 Blairadam, Kelty- Lane Closure S/B
-
13th of May 2024, 9:30am13th of May 2024, 3:30pmA7 at Ashkirk. Stop/Go Boards.
-
13th of May 2024, 9:30am13th of May 2024, 3:30pmA7 at Ashkirk. Stop/Go Boards.
-
13th of May 2024, 9:30am17th of May 2024, 3:30pmA77 Sandyford Toll Rbt NB - Lane Closure
-
13th of May 2024, 9:30am17th of May 2024, 3:30pmA77 Sandyford Toll Rbt SB - Lane Closure
-
13th of May 2024, 9:30am24th of May 2024, 3:30pmA737 SB Between Dalgarven and Kilwinning - TTLS
-
13th of May 2024, 9:30am24th of May 2024, 3:30pmA737 NB Between Dalgarven and Kilwinning - TTLS
-
13th of May 2024, 9:30am21st of May 2024, 3:30pmA87 Kyle of Lochalsh WB - TTL
-
13th of May 2024, 9:30am21st of May 2024, 3:30pmA87 Kyle of Lochalsh EB - TTL
-
13th of May 2024, 10:00am15th of May 2024, 11:59pmA78 South of Inverkip War Memorial - No Obstruction on Carriageway or Footway
-
13th of May 2024, 7:00pm28th of May 2024, 6:00amA82 Longman Rd Inverness NB - Lane Closure
-
13th of May 2024, 7:00pm31st of May 2024, 7:00amA82 Tomnahurich Swing Bridge Inverness NB - Road Closure
-
13th of May 2024, 7:00pm31st of May 2024, 7:00amA82 Tomnahurich Swing Bridge Inverness SB - Road Closure
-
13th of May 2024, 7:00pm14th of May 2024, 6:00amM8 - EB - Jct 2 on slip - Hard shoulder closure
-
13th of May 2024, 7:00pm22nd of May 2024, 6:00amA9 Drumochter NB - Convoy Works
-
13th of May 2024, 7:30pm16th of May 2024, 6:00amA720 - WB - Dreghorn to Gogar- Closure
-
13th of May 2024, 8:00pm16th of May 2024, 6:00amA90 Auchiries NB - Temporary traffic signals
-
13th of May 2024, 8:00pm17th of May 2024, 6:00amM8 J17 WB onslip from West Graham Street Total closure
-
13th of May 2024, 8:00pm14th of May 2024, 6:00amM8 EB J26 to J24 - Lane Closure
-
13th of May 2024, 8:00pm14th of May 2024, 6:00amM8 EB J26 off slip - Slip Closure
-
13th of May 2024, 8:00pm14th of May 2024, 6:00amM8 EB J25 off slip - Slip Closure
-
13th of May 2024, 8:00pm14th of May 2024, 6:00amM8 EB J24 off slip - Slip Closure
-
13th of May 2024, 8:00pm14th of May 2024, 6:00amM8 EB J26 on slip - Slip Closure
-
13th of May 2024, 8:00pm14th of May 2024, 6:00amM8 EB J25a on slip - Slip Closure
-
13th of May 2024, 8:00pm14th of May 2024, 6:00amM8 EB J25 on slip - Slip Closure
-
13th of May 2024, 8:00pm14th of May 2024, 6:00amM8 WB J15 on slip from Springburn Expressway - Slip Closure
-
13th of May 2024, 8:00pm14th of May 2024, 6:00amM8 WB J15 to J16 - Lane Closure
-
13th of May 2024, 8:00pm14th of May 2024, 6:00amM8 WB J16 off slip - Lane closure
-
13th of May 2024, 8:00pm14th of May 2024, 6:00amM80 SB Jct 1 - Lane Closure
-
13th of May 2024, 8:00pm14th of May 2024, 6:00amM80 SB Jct 1 Link Road to M8 WB - Closure
-
13th of May 2024, 8:00pm14th of May 2024, 6:00amM8 WB Jct 13 to Jct 15 - Lane 1 & 2 Closure
-
13th of May 2024, 8:00pm14th of May 2024, 6:00amM8 WB Jct 14 onslip from Viewpark - Slip Closure
-
13th of May 2024, 8:00pm14th of May 2024, 6:00amM8 WB Jct 15 offslip to Stirling Road - Slip Closure
-
13th of May 2024, 8:00pm15th of May 2024, 6:00amM8 E/B J29 on slip St James IC Closure
-
13th of May 2024, 8:00pm15th of May 2024, 6:00amM8 E/B Black Cart water junction 29 St James IC Lane 2 closure
-
13th of May 2024, 8:00pm15th of May 2024, 6:00amM8 E/B J29 St James IC -28 Total closure
-
13th of May 2024, 8:00pm17th of May 2024, 6:00amM8 E/B J27-J26 Total Closure
-
13th of May 2024, 8:00pm17th of May 2024, 6:00amM8 J27 E/B on slip Total Closure
-
13th of May 2024, 8:00pm17th of May 2024, 6:00amM8 E/B J28 onslip to J27 off slip lane 2 and 3 closure
-
13th of May 2024, 8:00pm17th of May 2024, 6:00amM8 E/B J28 on slip Closure
-
13th of May 2024, 8:00pm14th of May 2024, 6:00amA725 Southbound main line at Bellziehill - Total Closure
-
13th of May 2024, 8:00pm14th of May 2024, 6:00amA725 Southbound Bellziehill on-slip -Total Closure
-
13th of May 2024, 8:00pm14th of May 2024, 6:00amA725 Southbound Orbiston on-slip - Total Closure
-
13th of May 2024, 8:00pm15th of May 2024, 6:00amU78/A78 Hillhouse Rd OB NB - TTLs
-
14th of May 2024, 9:00am14th of May 2024, 7:00pmA828 Appin - Stop/Go Works
-
14th of May 2024, 9:30am15th of May 2024, 3:00pmA78 from Ardgowan to Wemyss Bay SB - Mobile Stop/Go
-
14th of May 2024, 9:30am15th of May 2024, 3:00pmA78 from Ardgowan to Wemyss Bay NB - Mobile Stop/Go
-
14th of May 2024, 9:30am14th of May 2024, 3:00pmM90 Jcn 3-8-MLC S/B
-
14th of May 2024, 9:30am17th of May 2024, 5:00pmA701 SB at Locharbriggs - TTLS
-
14th of May 2024, 9:30am17th of May 2024, 5:00pmA701 NB at Locharbriggs - TTLS
-
14th of May 2024, 7:00pm15th of May 2024, 6:00amM8 - EB - Jct 1 - Hard shoulder closure
-
14th of May 2024, 7:30pm18th of May 2024, 6:30amA90 Forfar Bypass -Convoy N/B
-
14th of May 2024, 7:30pm15th of May 2024, 6:00amA1 N/B Bankton On-slip Closure.
-
14th of May 2024, 8:00pm15th of May 2024, 6:00amM8 WB Jct 24 - 25 - Lane Closure
-
14th of May 2024, 8:00pm15th of May 2024, 6:00amM8 WB Jct 24 on slip from Helen Street -Slip Closure
-
14th of May 2024, 8:00pm15th of May 2024, 6:00amM8 WB Junction 25 Off Slip To Fifty Pitches Road- Slip Closure
-
14th of May 2024, 8:00pm15th of May 2024, 6:00amM8 WB Jct 25 to Jct 26 on slip - Lane Closure
-
14th of May 2024, 8:00pm15th of May 2024, 6:00amM8 WB Jct 25 On Slip From Fifty Pitches Road - Slip Closure
-
14th of May 2024, 8:00pm15th of May 2024, 6:00amM8 WB Jct 25a Offslip To Braehead - Slip Closure
-
14th of May 2024, 8:00pm14th of May 2024, 8:01pmM8 WB Jct 26 Offslip - No Obstruction footway or carriageway
-
14th of May 2024, 8:00pm15th of May 2024, 6:00amA737 SB Kilbarchan IC to Howwood Road Closure
-
14th of May 2024, 8:00pm15th of May 2024, 6:00amA737 NB Howwood to Kilbarchan IC Road Closure
-
14th of May 2024, 8:00pm16th of May 2024, 11:59pmA85 George Street Oban - Vergeworks
-
14th of May 2024, 8:00pm15th of May 2024, 6:00amM74 JCT1 NB offslip - Slip Closure
-
14th of May 2024, 8:00pm16th of May 2024, 6:00amM90 S/B Jct 1C. Closure
-
14th of May 2024, 8:00pm16th of May 2024, 6:00amA823(M) S/B. Closure
-
14th of May 2024, 8:00pm15th of May 2024, 6:00amA725 Northbound Mainline Bothwell - Total Closure
-
14th of May 2024, 8:00pm15th of May 2024, 6:00amA725 Northbound Raith on-slip - Total Closure
-
14th of May 2024, 8:00pm15th of May 2024, 6:00amA725 Northbound Orbiston on-slip -Total Closure
-
14th of May 2024, 8:00pm15th of May 2024, 6:00amA725 NB Bothwell Bridge - Advanced Signage
-
14th of May 2024, 9:00pm16th of May 2024, 5:00amA78 SB Loans to Monktonhead Rbt - Lane Closure
-
14th of May 2024, 9:00pm15th of May 2024, 6:00amA9 Ballinluig NB - Lane Closure
-
14th of May 2024, 9:30pm15th of May 2024, 6:00amA1 N/B Bankton. Lane Closure.
-
15th of May 2024, 8:00am17th of May 2024, 5:00pmA9 Dornoch Bridge NB - TTL
-
15th of May 2024, 8:00am17th of May 2024, 5:00pmA9 Dornoch Bridge SB - TTL
-
15th of May 2024, 9:00am15th of May 2024, 7:00pmA828 Connel - Stop/Go Works
-
15th of May 2024, 9:00am15th of May 2024, 7:00pmA82 South of Laggan Swing Bridge Laggan - Stop/Go Works
-
15th of May 2024, 9:30am16th of May 2024, 3:30pmM90 Rhynd NB - Lane closure
-
15th of May 2024, 9:30am16th of May 2024, 3:30pmM90 Rhynd SB - Lane closure
-
15th of May 2024, 9:30am15th of May 2024, 3:30pmA82 Kenneth Street Inverness - Signage
-
15th of May 2024, 6:00pm17th of May 2024, 2:00amA85 West of Ross Bridge Comrie WB - Road Closure with Amnesties
-
15th of May 2024, 6:00pm17th of May 2024, 2:00amA85 West of Ross Bridge Comrie EB - Road Closure with Amnesties
-
15th of May 2024, 7:00pm16th of May 2024, 6:00amM8 - WB - Jct 2 to 3 - Lane closure
-
15th of May 2024, 7:30pm16th of May 2024, 6:00amA1 N/B Old Craighall Off-slip Closure.
-
15th of May 2024, 7:30pm16th of May 2024, 6:00amA1 N/B Old Craighall Lane Closure.
-
15th of May 2024, 8:00pm17th of May 2024, 6:00amM8 EB Jct 12 - 10 Mobile Lane Closures
-
15th of May 2024, 8:00pm17th of May 2024, 6:00amM8 EB Jct 29 - 24 - Mobile Lane Closures
-
15th of May 2024, 8:00pm17th of May 2024, 6:00amM8 WB Jct 10 - 14 Moble Lane Closures
-
15th of May 2024, 8:00pm16th of May 2024, 6:00amA804 SB Newton St Total Closure
-
15th of May 2024, 8:00pm17th of May 2024, 6:00amM8 WB Jct 26 - 29 Mobile Lane Closures
-
15th of May 2024, 8:00pm16th of May 2024, 6:00amA96 at Sandown Road Junction WB - Temporary traffic signals
-
15th of May 2024, 8:00pm16th of May 2024, 6:00amM8 EB Jct 24 to Jct 22 - Lane Closure
-
15th of May 2024, 8:00pm16th of May 2024, 6:00amM8 EB Jct 24 on slip from Helen Street - Slip Closure
-
15th of May 2024, 8:00pm16th of May 2024, 6:00amM8 EB Jct 23 on slip from Dumbreck Road - Slip Closure
-
15th of May 2024, 8:00pm16th of May 2024, 6:00amM8 EB Jct 22 to M74 Jct 1 - Closure
-
15th of May 2024, 8:00pm16th of May 2024, 6:00amM8 EB Jct 22 to Jct 20 - Lane 1 Closure
-
15th of May 2024, 8:00pm16th of May 2024, 6:00amM8 EB Jct 22 off slip Seaward St - Slip Closure
-
15th of May 2024, 8:00pm16th of May 2024, 6:00amM8 EB Jct 21 off slip ro Paisley Road - lane Closure
-
15th of May 2024, 8:00pm16th of May 2024, 6:00amM8 WB Jct 22 Seward Street- Slip Closure
-
15th of May 2024, 8:00pm16th of May 2024, 6:00amM8 WB Jct 22 link Road to M77 Merge - Lane 1 Closure
-
15th of May 2024, 8:00pm16th of May 2024, 6:00amM80 SB J2 off slip - Slip Closure
-
15th of May 2024, 8:00pm16th of May 2024, 6:00amM80 NB J2 on slip - Slip Closure
-
15th of May 2024, 8:00pm16th of May 2024, 6:00amM80 SB J2 on slip - Slip Closure
-
15th of May 2024, 8:00pm16th of May 2024, 6:00amM80 SB J1 off slip - Slip Closure
-
15th of May 2024, 8:00pm16th of May 2024, 6:00amM8 Eastbound Junction 7 Eurocentral Main line - Total Closure
-
15th of May 2024, 10:00pm16th of May 2024, 6:00amM74 SB Jct 6 - 8 Closure
-
16th of May 2024, 8:00am16th of May 2024, 5:00pmA68 - NB - Camptown - Sign placement
-
16th of May 2024, 8:00am16th of May 2024, 5:00pmA68 - SB - Camptown - Sign placement
-
16th of May 2024, 9:00am16th of May 2024, 7:00pmA82 Highbridge South of Spean Bridge - Stop/Go Works
-
16th of May 2024, 9:00am16th of May 2024, 7:00pmA828 Ledaig North of Connel - Stop/Go Works
-
16th of May 2024, 7:30pm17th of May 2024, 6:00amA1 N/B Lamberton. Road Closure
-
16th of May 2024, 8:00pm17th of May 2024, 6:00amM8 EB Jct 18 onslip from Charing Cross - Closure
-
16th of May 2024, 8:00pm17th of May 2024, 6:00amM8 EB Jct 16 onslip from Craighall Closure
-
16th of May 2024, 8:00pm17th of May 2024, 6:00amM8 EB Jct 15 onslip from Castle Street - Closure
-
16th of May 2024, 8:00pm17th of May 2024, 6:00amM8 EB Jct 15 onslip from Stirling Road - Closure
-
16th of May 2024, 8:00pm18th of May 2024, 6:00amA96 Huntly Bypass- TTL N/B
-
16th of May 2024, 8:00pm17th of May 2024, 6:00amM8 EB Jct 14 offslip to Viewpark Avenue - Closure
-
16th of May 2024, 8:00pm17th of May 2024, 6:00amM8 EB Jct 18 to Jct 13 - Lane Closure
-
16th of May 2024, 8:00pm17th of May 2024, 6:00amM74 Northbound Junction 5 on-slip - Total closure
-
16th of May 2024, 10:00pm17th of May 2024, 6:00amM74 NB Jct 8 onslip - Slip Closure
-
16th of May 2024, 10:00pm17th of May 2024, 6:00amM74 NB Jct 8 - 6 Closure
-
17th of May 2024, 6:30pm17th of May 2024, 11:30pmA76 SB from Lochside Road to A75 Glasgow Road, Dumfries - Rolling Road Closure
-
17th of May 2024, 7:30pm25th of May 2024, 6:00amA1-NB- West of Monksmuir- Closure
-
17th of May 2024, 8:00pm18th of May 2024, 6:00amM8 EB Jct 15 offslip to Springburn Expressway - Closure
-
17th of May 2024, 8:00pm18th of May 2024, 6:00amA78 SB Inverkip Road/IBM lane Closures
-
17th of May 2024, 8:00pm18th of May 2024, 6:00amA78 NB Inverkip Road/IBM lane Closures
-
17th of May 2024, 8:00pm18th of May 2024, 6:00amA8 Westbound Showcase to Bargeddie Rbt - Total closure
-
17th of May 2024, 8:00pm18th of May 2024, 6:00amA8 Westbound Showcase on-slip - Total closure
-
17th of May 2024, 10:00pm18th of May 2024, 6:00amM74 SB Jct 6 onslip from Motherwell - Slip Closure
-
17th of May 2024, 10:00pm18th of May 2024, 6:00amM74 SB Jct 6 onslip from Hamilton - Slip Closure
-
18th of May 2024, 6:00am19th of May 2024, 6:00pmA8 Eastbound Eurocentral to Chapelhall - Total closure
-
18th of May 2024, 6:00am19th of May 2024, 6:00pmA8 Eastbound Chapelhall to Newhouse - Total closure
-
18th of May 2024, 8:00am18th of May 2024, 5:00pmA9 Findhorn Bridge Tomatin NB - Lane Closure
-
18th of May 2024, 8:00am18th of May 2024, 5:00pmA9 Findhorn Bridge Tomatin SB - Lane Closure
-
18th of May 2024, 8:00pm20th of May 2024, 6:00amM74 SB Junction 8 lane closures
-
18th of May 2024, 8:00pm19th of May 2024, 6:00amM74 SB Junction 8 offslip closure
-
19th of May 2024, 6:30am19th of May 2024, 2:00pmA8 Main Street/Rue End St, from Cartsdyke Rbt to Dellingburn Street Jct - Lane Closure
-
19th of May 2024, 6:30am19th of May 2024, 2:00pmA8 Main Street/Rue End St, from Cartsdyke Rbt to Dellingburn Street Jct - Lane Closure
-
19th of May 2024, 8:00am19th of May 2024, 5:00pmA9 Dulnain Bridge Carrbridge SB - TTL
-
19th of May 2024, 8:00am19th of May 2024, 5:00pmA9 Dulnain Bridge Carrbridge NB - TTL
-
19th of May 2024, 7:00pm20th of May 2024, 6:00amA9 South of Achrimsdale Brora NB - Road Closure with Amnesties
-
19th of May 2024, 7:00pm20th of May 2024, 6:00amA9 South of Achrimsdale Brora SB - Road Closure with Amnesties
-
19th of May 2024, 8:00pm20th of May 2024, 6:00amM74 Junction 8 onslip closure
-
20th of May 2024, 8:00am21st of May 2024, 6:00pmA9 Portgower NB - TTL
-
20th of May 2024, 8:00am21st of May 2024, 6:00pmA9 Portgower SB - TTL
-
20th of May 2024, 8:00am24th of May 2024, 6:00pmA8 Rue End St to Newark Roundabout - Route Part of Diversion
-
20th of May 2024, 8:00am22nd of May 2024, 6:00pmA77 NB Bankfield Rbt to Holmston Rbt - Route Part of Diversion
-
20th of May 2024, 9:30am7th of June 2024, 3:30pmA96 Cairnie EB - TTL's
-
20th of May 2024, 9:30am22nd of May 2024, 3:30pmA701 from B7076 Broomlands Beattock SB - TTLs
-
20th of May 2024, 9:30am22nd of May 2024, 3:30pmA701 from B7076 Broomlands Beattock NB - TTLs
-
20th of May 2024, 9:30am2nd of June 2024, 4:00pmA78 SB Irvine Rd Rbt to Monument Jct - TTLS
-
20th of May 2024, 9:30am2nd of June 2024, 4:00pmA78 NB Irvine Rd Rbt to Monument Jct - TTLS
-
20th of May 2024, 9:30am20th of May 2024, 3:30pmA82 Onich NB - TTL
-
20th of May 2024, 9:30am20th of May 2024, 3:30pmA82 Onich SB - TTL
-
20th of May 2024, 9:30am24th of May 2024, 3:30pmM90 Gairneybank NB - Lane closure
-
20th of May 2024, 9:30am31st of May 2024, 3:30pmA8 Eastbound Eurocentral to Newhouse - Progressive nearside & offside lane closures
-
20th of May 2024, 9:30am31st of May 2024, 3:30pmA8 Westbound Newhouse to Eurocentral - Progressive nearside & offside lane closures
-
20th of May 2024, 7:00pm21st of May 2024, 6:00amA9 Georgemass Jnct NB - Road Closure with Amnesties
-
20th of May 2024, 7:00pm21st of May 2024, 6:00amA9 Georgemass Jnct SB - Road Closure with Amnesties
-
20th of May 2024, 7:30pm25th of May 2024, 6:30amA90 Stonehaven Rail Br- Lane Closure S/B
-
20th of May 2024, 7:30pm25th of May 2024, 6:30amA90 Stonehaven Rail Br- Lane Closure N/B
-
20th of May 2024, 8:00pm21st of May 2024, 6:00amM74 J1 SB onslip - Closure
-
20th of May 2024, 8:00pm23rd of May 2024, 6:00amA8 Eastbound Swinton Rbt to Bargeddie Rbt - Total closure
-
20th of May 2024, 8:00pm24th of May 2024, 6:00amM73 Northbound Junction 2 on-slip - Total closure
-
20th of May 2024, 8:00pm24th of May 2024, 6:00amM73 Southbound Junction 2 off-slip - Total closure
-
20th of May 2024, 8:00pm24th of May 2024, 6:00amM8 Eastbound Junction 8 off-slip - Total closure
-
21st of May 2024, 9:30am21st of May 2024, 3:30pmA83 Inveraray SB - TTL
-
21st of May 2024, 9:30am21st of May 2024, 3:30pmA83 Inveraray NB - TTL
-
21st of May 2024, 10:00am23rd of May 2024, 11:59pmA90 Forfar No Obstruction S/B
-
21st of May 2024, 10:00am23rd of May 2024, 11:59pmA90 Forfar No Obstruction N/B
-
21st of May 2024, 7:00pm23rd of May 2024, 6:00amA9 Dunbeath NB - Road Closure with Amnesties
-
21st of May 2024, 7:00pm23rd of May 2024, 6:00amA9 Dunbeath SB - Road Closure with Amnesties
-
21st of May 2024, 8:00pm22nd of May 2024, 6:00amA725 NB E Kilbride Expy Whirlies to Mavor merge - Road closure
-
21st of May 2024, 8:00pm22nd of May 2024, 6:00amA725 NB C154 Stoneymeadow Rd onslip to A725 - Road closure
-
21st of May 2024, 8:00pm22nd of May 2024, 6:00amA725 NB Mavor to Whirlies merge -Lane closure
-
21st of May 2024, 8:00pm22nd of May 2024, 6:00amA725 NB Whirlies merge to Bothwell bridge - Lane closure
-
21st of May 2024, 8:00pm22nd of May 2024, 6:00amA725 NB Hamilton rd off slip - Slip closure
-
21st of May 2024, 8:00pm22nd of May 2024, 6:00amA725 NB Douglas st off slip - Slip closure
-
21st of May 2024, 8:00pm22nd of May 2024, 6:00amA725 NB Douglas st on slip - Slip closure
-
21st of May 2024, 8:00pm22nd of May 2024, 6:00amA725 NB Main St off slip - Slip closure
-
21st of May 2024, 8:00pm22nd of May 2024, 6:00amA725 NB Main St on slip - Slip closure
-
21st of May 2024, 8:00pm22nd of May 2024, 6:00amA725 NB Glasgow rd on slip - Slip closure
-
21st of May 2024, 8:00pm22nd of May 2024, 6:00amA725 NB Craighead off slip - Slip closure
-
21st of May 2024, 8:00pm22nd of May 2024, 6:00amA725 NB Craighead on slip - Slip closure
-
22nd of May 2024, 8:00am26th of May 2024, 6:00pmA90/C9k Nth of Drumnagari, Laurencekirk - Off Slip closure
-
22nd of May 2024, 8:00am26th of May 2024, 6:00pmA90/C9k Nth of Drumnagari, Laurencekirk - S/B right turn crossover closed.
-
22nd of May 2024, 9:00am22nd of May 2024, 5:00pmA76 NB Barburgh Mill Blackwood - TTLS
-
22nd of May 2024, 9:00am22nd of May 2024, 5:00pmA76 SB Barburgh Mill Blackwood - TTLS
-
22nd of May 2024, 9:00am24th of May 2024, 7:00pmA86 Biallidbeg West of Newtonmore - Stop/Go Works
-
22nd of May 2024, 9:30am23rd of May 2024, 3:00pmA78 SB Dual Inverkip Road, Greenock - Lane Closure
-
22nd of May 2024, 9:30am23rd of May 2024, 3:00pmA78 NB Dual Inverkip Road, Greenock - Lane Closure
-
22nd of May 2024, 8:00pm25th of May 2024, 5:00pmA68 S/B Camptown. Verge Signage.
-
22nd of May 2024, 8:00pm24th of May 2024, 6:00amA8 Westbound Bargeddie Rbt to Swinton Rbt - Total closure
-
23rd of May 2024, 9:00am23rd of May 2024, 5:00pmA77 Glengall to Bankfield Rbt NB - TTLs
-
23rd of May 2024, 9:00am23rd of May 2024, 5:00pmA77 Glengall to Bankfield Rbt SB - TTLs
-
23rd of May 2024, 7:00pm1st of June 2024, 6:00amA9 Drumochter SB - Convoy Works
-
23rd of May 2024, 8:00pm24th of May 2024, 6:00amA82 NB Erskine to Dunglass - Lane Closures
-
23rd of May 2024, 8:00pm24th of May 2024, 6:00amA82 NB off slip to Erskine Bridge - Slip Closure
-
23rd of May 2024, 8:00pm24th of May 2024, 6:00amA898 off slip from Erskine Br to A82 NB - Slip Closure
-
23rd of May 2024, 8:00pm24th of May 2024, 6:00amA82 NB Old Kilpatrick off slip - Slip Closure
-
23rd of May 2024, 8:00pm24th of May 2024, 6:00amA82 NB Old Kilpatrick on slip - Slip Closure
-
23rd of May 2024, 8:00pm24th of May 2024, 6:00amA82 NB Alexandria Barloan Rbt to Stoneymollan Closure
-
23rd of May 2024, 8:00pm24th of May 2024, 6:00amA82 SB Alexandria Bypass Stoneymollan - Barloan Rbt - Closure
-
23rd of May 2024, 8:00pm24th of May 2024, 6:00amA82 SB Alexandria Bypass Renton Road Onslip
-
23rd of May 2024, 8:00pm24th of May 2024, 6:00amA82 NB Alexandria Bypass Rentom Road offlsip - Closure
-
25th of May 2024, 9:00pm28th of July 2024, 6:00amA8 EB Greenock Road Port Glasgow - Lane Closure (Sat Nights Only)
-
26th of May 2024, 6:30am26th of May 2024, 2:00pmA8 Port Glasgow Road/East Hamilton Street from Bogston to Cartsdyke Rbt - Lane Closure
-
26th of May 2024, 6:30am26th of May 2024, 2:00pmA8 Port Glasgow Road/East Hamilton Street from Bogston to Cartsdyke Rbt - Lane Closure
-
26th of May 2024, 9:00am26th of May 2024, 6:00pmA7 S/B Selkirk at High Street. Closure.
-
26th of May 2024, 9:00am26th of May 2024, 6:00pmA7 N/B Selkirk at High Street. Closure.
-
26th of May 2024, 2:00pm26th of May 2024, 6:00pmA75 NB from Edinburgh Road to A701 Tinwall, Dumfries - Rolling Road Closure
-
26th of May 2024, 7:00pm7th of June 2024, 6:00amA82 Corrychurrachan North of Corran NB - Road Closure with Amnesties
-
26th of May 2024, 7:00pm7th of June 2024, 6:00amA82 Corrychurrachan North of Corran SB - Road Closure with Amnesties
-
26th of May 2024, 7:00pm1st of June 2024, 6:00amA9 Dalnaspidal North of Drumochter - Convoy Works
-
26th of May 2024, 7:30pm1st of June 2024, 6:00amM80 - SB - Jct 9 to 8 - Closure
-
26th of May 2024, 7:30pm1st of June 2024, 6:00amM80 - SB -Jct 9 to 8 - Closure
-
26th of May 2024, 7:30pm1st of June 2024, 6:00amM80 - NB - Jct 8 to 9 - Closure
-
26th of May 2024, 7:30pm1st of June 2024, 6:00amM80 - NB - Jct 8 to 9 - Closure
-
26th of May 2024, 10:00pm21st of June 2024, 6:00amM8 Woodside - M8 EB Jct 18 to 16 - Road Closure
-
26th of May 2024, 10:00pm21st of June 2024, 6:00amM8 Woodside - M8 EB Jct 19 (Anderston) On Slip Closure
-
26th of May 2024, 10:00pm21st of June 2024, 6:00amM8 Woodside - M8 EB Jct 18 (Charing X) On Slip Closure
-
27th of May 2024, 6:00am16th of June 2024, 8:00pmA77 NB mainline at Spittahill - Lane Closure
-
27th of May 2024, 7:00am31st of May 2024, 7:00pmA82 Falls of Falloch North of Inverarnan - Convoy Works
-
27th of May 2024, 7:00am6th of June 2024, 7:00pmA9 South if Bridge of Tacher Achavanich - Convoy Works
-
27th of May 2024, 8:00am31st of May 2024, 5:00pmA90 St Fergus to Crimond - Diversion signage for local road closure
-
27th of May 2024, 9:00am27th of May 2024, 7:00pmA85 Burnbrae Forbrae - Stop/Go Works
-
27th of May 2024, 9:30am14th of June 2024, 4:00pmA82 Invergloy North of Spean Bridge NB - TTL
-
27th of May 2024, 9:30am14th of June 2024, 4:00pmA82 Invergloy North of Spean Bridge SB - TTL
-
27th of May 2024, 9:30am27th of May 2024, 6:00pmA84 Lochearnhead SB - TTL
-
27th of May 2024, 9:30am27th of May 2024, 6:00pmA84 Lochearnhead NB - TTL
-
27th of May 2024, 9:30am27th of May 2024, 6:00pmA85 Crianlarich EB - TTL
-
27th of May 2024, 9:30am27th of May 2024, 6:00pmA85 Crianlarich WB - TTL
-
27th of May 2024, 9:30am27th of May 2024, 12:00pmA84 Strathyre NB - TTL
-
27th of May 2024, 9:30am27th of May 2024, 12:00pmA84 Strathyre SB - TTL
-
27th of May 2024, 7:30pm28th of May 2024, 6:30amM90 Craigend EB on Slip to M90 NB at Friarton - Slip Closure
-
27th of May 2024, 8:00pm1st of June 2024, 6:00amA9 Luncarty to Birnam NB - Lane Closure
-
27th of May 2024, 8:00pm1st of June 2024, 6:00amA9 Luncarty to Birnam SB - Lane Closure
-
27th of May 2024, 8:00pm17th of June 2024, 6:00amA77 NB mainline at Spittilhill to Bellfield I/C - Total Closure
-
27th of May 2024, 8:00pm17th of June 2024, 6:00amA77 NB Off slip to Bellfiled I/C - Total Closure
-
27th of May 2024, 8:00pm28th of May 2024, 6:00amM80 Robroyston Rd SB - Lane closure
-
28th of May 2024, 9:00am29th of May 2024, 7:00pmA85 Loch Awe - Stop/Go Works
-
28th of May 2024, 9:30am28th of May 2024, 3:30pmA82 Arden NB - TTL
-
28th of May 2024, 9:30am28th of May 2024, 3:30pmA82 Arden SB - TTL
-
28th of May 2024, 9:30am29th of May 2024, 3:30pmA82 EB Great Western Road @ Erskine Bridge - Lane Closures
-
28th of May 2024, 9:30am29th of May 2024, 3:30pmA82 WB Great Western Road @ Erskine Bridge - Lane Closures
-
28th of May 2024, 7:00pm29th of May 2024, 6:00amA96 Brodie WB - Diversion signage for local road closure
-
28th of May 2024, 7:30pm29th of May 2024, 6:30amM90 Craigend EB Slip to M90 SB Jct 10- Slip Closure
-
29th of May 2024, 7:30pm30th of May 2024, 6:30amM90 Jct 10 on Slip from A912 Perth - Slip Closure
-
29th of May 2024, 7:30pm1st of June 2024, 6:00amA68 - NB - South of Charlesfield - Closure
-
29th of May 2024, 7:30pm1st of June 2024, 6:00amA68 - SB - South of Charlesfield - Closure
-
29th of May 2024, 8:00pm30th of May 2024, 6:00amA725 East Kilbride Expressway, Bothwell Bridge NB - Advanced Signage for Road Closure
-
29th of May 2024, 8:00pm30th of May 2024, 6:00amA725 Northbound Raith Main line total closure
-
29th of May 2024, 8:00pm30th of May 2024, 6:00amA725 Raith on-slip Northbound total closure
-
29th of May 2024, 8:00pm30th of May 2024, 6:00amA725 Orbiston on-slip total closure Northbound
-
29th of May 2024, 8:00pm30th of May 2024, 6:00amA725 Northbound Bellziehill on-slip -Total closure
-
29th of May 2024, 8:00pm30th of May 2024, 6:00amA725 Northbound Strathclyde Business Park on-slip- Total closure
-
30th of May 2024, 9:00am31st of May 2024, 6:00amA92 Greendykes Road. N/B Road Closure
-
30th of May 2024, 9:00am31st of May 2024, 7:00pmA85 Loch Lubhair East of Crianlarich - Stop/Go Works
-
30th of May 2024, 7:30pm31st of May 2024, 6:30amM90 Jct 10 SB Off Slip to Broxden - Slip Closure
-
30th of May 2024, 7:30pm31st of May 2024, 6:00amA702 N/B at Silverburn. Road Closure.
-
30th of May 2024, 7:30pm31st of May 2024, 6:00amA702 S/B at Silverburn. Road Closure.
-
30th of May 2024, 8:00pm31st of May 2024, 6:00amA725 Southbound Main line - Total closure
-
30th of May 2024, 8:00pm31st of May 2024, 6:00amM8 Westbound to A725 Southbound link road - Total closure
-
30th of May 2024, 8:00pm31st of May 2024, 6:00amA725 Southbound Diamond on-slip - total closure
-
30th of May 2024, 8:00pm31st of May 2024, 6:00amA725 Southbound Bellziehill on-slip - Total closure
-
30th of May 2024, 8:00pm31st of May 2024, 6:00amA725 southbound Orbiston on-slip - Total closure
-
30th of May 2024, 10:00pm31st of May 2024, 6:00amA737 SB From B787 to Roadhead Rbt - Total Closure
-
30th of May 2024, 10:00pm31st of May 2024, 6:00amA737 NB From Roadhead Rbt to B737 - Total Closure
-
31st of May 2024, 9:30am13th of June 2024, 3:30pmA985 E/B Cairneyhill to Crombie. Temporary Traffic Lights.
-
31st of May 2024, 9:30am13th of June 2024, 3:30pmA985 W/B Crombie to Cairneyhill. Temporary Traffic Lights.
-
31st of May 2024, 7:00pm31st of May 2024, 10:30pmA75 SB from Brownrigg Rbt to A780, Dumfries - Rolling Road Closure
-
31st of May 2024, 7:00pm31st of May 2024, 10:30pmA75 NB from Brownrigg Rbt to A780, Dumfries - Rolling Road Closure
-
31st of May 2024, 7:30pm1st of June 2024, 6:30amM90 Jct 10 Off Slip NB - Full Slip Closure
-
31st of May 2024, 8:00pm1st of June 2024, 6:00amM73 Northbound Junction 2 to Junction 2A - Nearside lane closure
-
31st of May 2024, 8:00pm1st of June 2024, 6:00amA725 Raith Northbound on-slip - Total closure
-
31st of May 2024, 8:00pm1st of June 2024, 6:00amA725 Northbound Raith underpass to Orbiston - Nearside lane closure
-
1st of June 2024, 7:00am30th of September 2024, 7:00pmA889 Dochaid Abhacain Dalwhinnie - TTL
-
1st of June 2024, 8:00am2nd of June 2024, 6:00pmA701 SB At SRUC Barony Campus Parkgate - No obstruction on C/W or F/W
-
1st of June 2024, 11:00am1st of June 2024, 6:00pmA76 The Castle New Cumnock - Event
-
1st of June 2024, 1:00pm1st of June 2024, 1:20pmA85 Oban WB - Event
-
1st of June 2024, 1:00pm1st of June 2024, 1:20pmA85 Oban EB - Event
-
1st of June 2024, 7:30pm26th of June 2024, 6:30amM90 Bridge of Earn, J9 S/B on slip - Slip closure
-
1st of June 2024, 7:30pm26th of June 2024, 6:30amM90 Bridge of Earn, J9 - S/B Lane and hard shoulder closure
-
16th of June 2024, 7:00pm1st of July 2024, 6:00amA82 North of Kingshouse Hotel NB - Road Closure
Local roadworks
The Traffic Scotland Service does not cover local roads. These are managed and maintained by local authorities.
Visit The Road Works Scotland website for information on local roads. The website provides information on all programmed and emergency works carried out by utility companies, construction companies, and the local authority on local roads.